i
Tata AutoComp Systems
Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
I applied via Approached by Company
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
Tata AutoComp Systems interview questions for designations
Top trending discussions
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 17 Jun 2024
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
Casting should be thorough
Aluminium die Casting
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
based on 5 interviews
Interview experience
based on 40 reviews
Rating in categories
Assistant Manager
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
217
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
178
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane Group