Filter interviews by
posted on 15 Jan 2019
I applied via Recruitment Consultant and was interviewed before Jan 2018. There were 3 interview rounds.
In a gear, we measure various parameters such as pitch diameter, tooth thickness, backlash, and runout.
Pitch diameter is measured using a gear measuring machine or by calculating it from the number of teeth and the module or diametral pitch.
Tooth thickness is measured using a gear tooth vernier caliper or a gear tooth micrometer.
Backlash is measured by placing a dial indicator on the gear teeth and measuring the moveme...
Fr and Ff transmission are two different types of transmissions used in vehicles.
Fr transmission stands for Front-engine, Rear-wheel drive transmission, where the engine is located in the front of the vehicle and power is transmitted to the rear wheels.
Ff transmission stands for Front-engine, Front-wheel drive transmission, where the engine is located in the front of the vehicle and power is transmitted to the front wh...
Various parts of an engine and a transmission and their roles
Engine parts: pistons, crankshaft, camshaft, valves, spark plugs
Transmission parts: gears, clutch, torque converter, drive shaft
Engine parts convert fuel into mechanical energy
Transmission parts transfer power from the engine to the wheels
Inspection on a CMM and ULM involves using specialized equipment to measure and verify the dimensions and tolerances of a part.
CMM stands for Coordinate Measuring Machine, which uses a probe to measure the coordinates of points on a part's surface.
ULM stands for Universal Length Measuring Machine, which uses laser interferometry to measure the length and dimensions of a part.
To perform inspection on a CMM or ULM, the p...
Calibration of measuring instruments like vernier caliper, micrometer, dial gauge, etc.
Calibration involves comparing the measurements of the instrument with a known standard.
The process ensures accuracy and reliability of the instrument's measurements.
Calibration is typically performed by a qualified technician using calibration equipment.
The technician adjusts the instrument if necessary to align it with the standard...
There are 3 types of defects as per QM pillar of TPM: Equipment, Process, and Human. We eliminate them through continuous improvement.
Equipment defects are caused by malfunctioning or poorly maintained equipment. We can eliminate them by implementing preventive maintenance and conducting regular inspections.
Process defects are caused by errors in the production process. We can eliminate them by identifying the root cau...
PM analysis of TPM involves stages like planning, execution, and evaluation.
Planning stage involves identifying the objectives, scope, and resources required for TPM analysis.
Execution stage includes collecting data, analyzing it using statistical tools, and identifying improvement opportunities.
Evaluation stage focuses on reviewing the results, implementing corrective actions, and monitoring the effectiveness of TPM.
E...
5S is a workplace organization method and 7 QC tools are quality control techniques used in manufacturing.
5S is a systematic approach to organizing and maintaining a clean, efficient, and safe work environment.
The 5S principles are Sort, Set in Order, Shine, Standardize, and Sustain.
7 QC tools are a set of statistical techniques used for problem-solving and quality improvement.
The 7 QC tools include Pareto Chart, Cause...
In the next 5 years, I see myself excelling in my role as Assistant Manager Supplier Quality Assurance and contributing significantly to the company's success. In 10 years, I envision taking on more leadership responsibilities and potentially moving into a higher management position.
Continuing to improve supplier quality processes and standards
Developing strong relationships with suppliers to ensure seamless collaborat...
My vision is to continuously improve supplier quality and drive operational excellence. My mission is to ensure all suppliers meet or exceed quality standards.
Continuous improvement of supplier quality
Drive operational excellence
Ensure all suppliers meet or exceed quality standards
Short term goal is to improve supplier quality performance, long term goal is to become a leader in supplier quality management.
Short term goal: Implement supplier quality improvement initiatives such as supplier audits and corrective actions
Long term goal: Develop a comprehensive supplier quality management system and lead cross-functional teams to drive continuous improvement
Short term goal: Achieve a supplier qualit...
I am expecting a competitive salary based on my experience, skills, and the responsibilities of the role.
I am looking for a salary that is in line with industry standards for an Assistant Manager position
I am open to negotiation based on the overall compensation package offered
I have researched the average salary range for similar roles in the region
I am more focused on the opportunity for growth and development rather
I am open to considering any position that aligns with my skills and career goals.
I am open to exploring different positions within the company
I am willing to take on new challenges and responsibilities
I am looking for a role that allows me to utilize my skills and experience effectively
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Campus Placement
Suzuki interview questions for popular designations
Get interview-ready with Top Suzuki Interview Questions
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2023. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Suzuki interview -
The duration of Suzuki interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 21 interviews
Interview experience
based on 315 reviews
Rating in categories
Junior Manager
80
salaries
| â‚ą5.1 L/yr - â‚ą9 L/yr |
Area Service Manager
73
salaries
| â‚ą8.5 L/yr - â‚ą13 L/yr |
Area Sales Manager
69
salaries
| â‚ą7.2 L/yr - â‚ą12.5 L/yr |
Assistant Manager
62
salaries
| â‚ą5.6 L/yr - â‚ą13 L/yr |
Senior Executive
61
salaries
| â‚ą3.6 L/yr - â‚ą7.5 L/yr |
Honda
Yamaha Motor
India Kawasaki Motors Pvt. Ltd.
TVS Motor