Filter interviews by
Clear (1)
posted on 15 Jan 2019
I applied via Recruitment Consultant and was interviewed before Jan 2018. There were 3 interview rounds.
In a gear, we measure various parameters such as pitch diameter, tooth thickness, backlash, and runout.
Pitch diameter is measured using a gear measuring machine or by calculating it from the number of teeth and the module or diametral pitch.
Tooth thickness is measured using a gear tooth vernier caliper or a gear tooth micrometer.
Backlash is measured by placing a dial indicator on the gear teeth and measuring the moveme...
Fr and Ff transmission are two different types of transmissions used in vehicles.
Fr transmission stands for Front-engine, Rear-wheel drive transmission, where the engine is located in the front of the vehicle and power is transmitted to the rear wheels.
Ff transmission stands for Front-engine, Front-wheel drive transmission, where the engine is located in the front of the vehicle and power is transmitted to the front wh...
Various parts of an engine and a transmission and their roles
Engine parts: pistons, crankshaft, camshaft, valves, spark plugs
Transmission parts: gears, clutch, torque converter, drive shaft
Engine parts convert fuel into mechanical energy
Transmission parts transfer power from the engine to the wheels
Inspection on a CMM and ULM involves using specialized equipment to measure and verify the dimensions and tolerances of a part.
CMM stands for Coordinate Measuring Machine, which uses a probe to measure the coordinates of points on a part's surface.
ULM stands for Universal Length Measuring Machine, which uses laser interferometry to measure the length and dimensions of a part.
To perform inspection on a CMM or ULM, the p...
Calibration of measuring instruments like vernier caliper, micrometer, dial gauge, etc.
Calibration involves comparing the measurements of the instrument with a known standard.
The process ensures accuracy and reliability of the instrument's measurements.
Calibration is typically performed by a qualified technician using calibration equipment.
The technician adjusts the instrument if necessary to align it with the standard...
There are 3 types of defects as per QM pillar of TPM: Equipment, Process, and Human. We eliminate them through continuous improvement.
Equipment defects are caused by malfunctioning or poorly maintained equipment. We can eliminate them by implementing preventive maintenance and conducting regular inspections.
Process defects are caused by errors in the production process. We can eliminate them by identifying the root cau...
PM analysis of TPM involves stages like planning, execution, and evaluation.
Planning stage involves identifying the objectives, scope, and resources required for TPM analysis.
Execution stage includes collecting data, analyzing it using statistical tools, and identifying improvement opportunities.
Evaluation stage focuses on reviewing the results, implementing corrective actions, and monitoring the effectiveness of TPM.
E...
5S is a workplace organization method and 7 QC tools are quality control techniques used in manufacturing.
5S is a systematic approach to organizing and maintaining a clean, efficient, and safe work environment.
The 5S principles are Sort, Set in Order, Shine, Standardize, and Sustain.
7 QC tools are a set of statistical techniques used for problem-solving and quality improvement.
The 7 QC tools include Pareto Chart, Cause...
In the next 5 years, I see myself excelling in my role as Assistant Manager Supplier Quality Assurance and contributing significantly to the company's success. In 10 years, I envision taking on more leadership responsibilities and potentially moving into a higher management position.
Continuing to improve supplier quality processes and standards
Developing strong relationships with suppliers to ensure seamless collaborat...
My vision is to continuously improve supplier quality and drive operational excellence. My mission is to ensure all suppliers meet or exceed quality standards.
Continuous improvement of supplier quality
Drive operational excellence
Ensure all suppliers meet or exceed quality standards
Short term goal is to improve supplier quality performance, long term goal is to become a leader in supplier quality management.
Short term goal: Implement supplier quality improvement initiatives such as supplier audits and corrective actions
Long term goal: Develop a comprehensive supplier quality management system and lead cross-functional teams to drive continuous improvement
Short term goal: Achieve a supplier qualit...
I am expecting a competitive salary based on my experience, skills, and the responsibilities of the role.
I am looking for a salary that is in line with industry standards for an Assistant Manager position
I am open to negotiation based on the overall compensation package offered
I have researched the average salary range for similar roles in the region
I am more focused on the opportunity for growth and development rather
I am open to considering any position that aligns with my skills and career goals.
I am open to exploring different positions within the company
I am willing to take on new challenges and responsibilities
I am looking for a role that allows me to utilize my skills and experience effectively
Top trending discussions
I appeared for an interview in Dec 2016.
A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.
Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stro...
A pictorial representation of a SI engine with valve opening, TDC, and BDC.
SI engine stands for Spark Ignition engine, which is commonly used in gasoline-powered vehicles.
Valve opening refers to the movement of the intake and exhaust valves to allow fuel-air mixture in and exhaust gases out of the combustion chamber.
TDC (Top Dead Center) is the position of the piston at the extreme top of its stroke.
BDC (Bottom Dead Ce...
I would improve the fuel efficiency of TVS motorcycles by implementing advanced engine technology.
Implementing electronic fuel injection system for better fuel management
Introducing hybrid technology for improved mileage
Optimizing aerodynamics of the motorcycle for reduced drag
Using lightweight materials for better fuel economy
I am a dedicated production engineer with a strong background in manufacturing processes and quality control.
Graduated with a degree in Mechanical Engineering
Experience working in a manufacturing plant for 3 years
Proficient in CAD software for designing production layouts
Implemented lean manufacturing principles to improve efficiency
Led a team in reducing production downtime by 20%
I applied via Campus Placement and was interviewed before May 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Nov 2020. There was 1 interview round.
A circuit breaker is an electrical switch that automatically interrupts the flow of current when it exceeds a certain limit.
It is used to protect electrical circuits from damage caused by overloading or short circuits.
It works by detecting the excess current and tripping the switch to break the circuit.
It can be reset manually or automatically depending on the type of circuit breaker.
Examples include thermal circuit br...
A contactor is an electrical switch used for switching an electrical circuit on or off.
It is used to control electric motors, lighting, heating, and other electrical loads.
It consists of a coil, contacts, and an enclosure.
The coil generates a magnetic field that pulls the contacts together to close the circuit.
Examples include HVAC systems, elevators, and industrial machinery.
Contactor ratings are based on the amount o...
MCB stands for Miniature Circuit Breaker. It is an electrical switch that automatically shuts off the electrical circuit during an overload or short circuit.
MCB is a type of circuit breaker that is commonly used in residential and commercial buildings.
It is designed to protect electrical circuits from damage caused by overloading or short circuits.
MCBs are available in different current ratings and can be easily replac...
A motor is a device that converts electrical energy into mechanical energy to produce motion.
Motors are used in various applications such as electric vehicles, industrial machinery, and household appliances.
There are different types of motors such as DC motors, AC motors, stepper motors, and servo motors.
The basic principle of a motor is the interaction between a magnetic field and an electric current.
Examples of motor...
A current transformer is a device that measures the current flowing in a circuit by producing a proportional current in its secondary winding.
Consists of a primary winding and a secondary winding
Primary winding is connected in series with the circuit carrying the current to be measured
Secondary winding is connected to a measuring instrument or protective relay
Produces a current in the secondary winding that is proporti...
I applied via Referral and was interviewed before Jan 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Aug 2021. There were 4 interview rounds.
I applied via Other and was interviewed in Aug 2020. There were 4 interview rounds.
Cycle time, Takt time, SBP, Indent, 7QC tools are important concepts in production engineering.
Cycle time is the time taken to complete one cycle of an operation.
Takt time is the time taken to produce one unit of a product to meet customer demand.
SBP stands for Standardized work, Built-in quality, and Process improvement.
Indent is a document used to order materials or services from suppliers.
7QC tools are a set of qual...
FOC stands for Field Oriented Control, FRDD stands for Frequency Response Double Differentiation, and FRDS stands for Frequency Response Double Summation.
FOC is a control technique used in AC motor control systems to achieve high performance.
FRDD is a mathematical technique used to analyze the frequency response of a system.
FRDS is a mathematical technique used to analyze the frequency response of a system by summing t...
Poke yoke is a Japanese term for mistake-proofing. It is a technique used to prevent errors in manufacturing processes.
Poke yoke involves designing a process or product in a way that makes it impossible to make a mistake.
It can be achieved through the use of sensors, alarms, or physical barriers.
Examples of poke yoke include car keys that can only be removed when the car is in park, or a phone charger that can only be ...
Types of audit include internal, external, financial, operational, and compliance audits.
Internal audit: conducted by company employees to evaluate internal controls and processes
External audit: conducted by independent auditors to provide an objective assessment of financial statements
Financial audit: focuses on financial statements and accounting practices
Operational audit: evaluates the efficiency and effectiveness ...
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
Some of the top questions asked at the Suzuki Assistant Manager Supplier Quality Assurance interview -
Junior Manager
80
salaries
| ₹5.1 L/yr - ₹9 L/yr |
Area Service Manager
73
salaries
| ₹8.5 L/yr - ₹13 L/yr |
Area Sales Manager
69
salaries
| ₹7.2 L/yr - ₹12.5 L/yr |
Assistant Manager
62
salaries
| ₹5.6 L/yr - ₹13 L/yr |
Senior Executive
61
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Honda
Yamaha Motor
India Kawasaki Motors Pvt. Ltd.
TVS Motor