I applied via Company Website and was interviewed in Oct 2023. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
The project phases are initiation, planning, execution, monitoring and control, and closure.
Initiation: defining the project's purpose and objectives
Planning: creating a detailed project plan, including timelines, budget, and resources
Execution: carrying out the plan and completing the project deliverables
Monitoring and Control: tracking progress and making adjustments as needed
Closure: wrapping up the project and eval
Planning projects in MS Project and TILOS involves creating a detailed schedule and visualizing it in a timeline.
Create a work breakdown structure (WBS) in MS Project to break down the project into smaller tasks.
Assign resources and set dependencies between tasks.
Use the Gantt chart view to visualize the project timeline.
Export the project schedule to TILOS to create a visual representation of the timeline.
Adjust the t...
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the most important tasks in a project
It helps in determining the minimum time required to complete a project
Any delay in critical path tasks will delay the project completion date
It helps in resource allocation and management
Examples: Construction of a
Free float is the amount of time an activity can be delayed without affecting the project end date. Total float is the amount of time an activity can be delayed without delaying the project end date.
Free float is the amount of time an activity can be delayed without affecting the early start date of its successor activity.
Total float is the amount of time an activity can be delayed without delaying the project end date...
Yes, I have experience in planning budgets and costs.
I start by identifying all the necessary expenses and estimating their costs.
I then prioritize the expenses and allocate funds accordingly.
I also factor in any potential risks or unforeseen expenses.
Regular monitoring and tracking of expenses is crucial to ensure adherence to the budget.
I have successfully planned and managed budgets for various projects in my previo
I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.
Sterlite Power interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.
I have 5 years of experience working as a Project Engineer in the construction industry.
Managed multiple construction projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Developed project schedules and budgets to meet deadlines and financial goals
Implemented quality control measures to ensure project compliance with regulations
Resolved any issues or conflicts that arose
Get interview-ready with Top Sterlite Power Interview Questions
I was interviewed in Mar 2022.
Working time status varies depending on the project and company policies.
Working time may be flexible or fixed depending on the company policies.
Some projects may require working overtime or on weekends.
Working time may also be affected by the location of the project.
It is important to clarify the working time status before accepting a job offer.
Optical fiber is a thin, flexible, transparent fiber made of glass or plastic that can transmit light signals over long distances.
Optical fiber is used in telecommunications to transmit data, voice, and video signals at high speeds.
It consists of a core, which carries the light signals, surrounded by a cladding layer that reflects the light back into the core.
The core and cladding are protected by an outer coating call...
The question is asking about three different things related to construction: sag chart, slump value, and C to Q.
Sag chart is a graph that shows the relationship between the flow rate and the viscosity of a material.
Slump value is a measure of the consistency of concrete or other materials.
C to Q refers to the ratio of the compressive strength to the tensile strength of concrete.
I applied via Approached by Company and was interviewed before Dec 2022. There were 4 interview rounds.
Safety policy is a set of guidelines and procedures implemented by an organization to ensure the safety and well-being of its employees and stakeholders.
Safety policy outlines the organization's commitment to safety and provides a framework for managing safety risks.
It includes procedures for identifying hazards, assessing risks, and implementing control measures.
Safety policy also defines roles and responsibilities, e...
Can you able to documention work
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
How to start work and company development
I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.
Top trending discussions
The duration of Sterlite Power interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 35 interviews
Interview experience
based on 582 reviews
Rating in categories
6-10 Yrs
Not Disclosed
Chief Manager
168
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Power Grid Corporation of India
Adani Transmission
Tata Power
NHPC