i
Sterlite Power
Filter interviews by
I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
How to start work and company development
I applied via Company Website and was interviewed in Mar 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
based on 4 interviews
Interview experience
based on 31 reviews
Rating in categories
Chief Manager
163
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Power Grid Corporation of India
Adani Transmission
Tata Power
NHPC