Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sterlite Power Team. If you also belong to the team, you can get access from here

Sterlite Power Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterlite Power Assistant Manager Interview Questions and Answers

Updated 13 Jan 2025

Sterlite Power Assistant Manager Interview Experiences

3 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Questions related to my field
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

How to start work and company development

Interview Preparation Tips

Interview preparation tips for other job seekers - Gd most important in the company and employees deduction most important Good timing and respect

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

Interview Questionnaire 

1 Question

  • Q1. Debt equity ratio

Interview questions from similar companies

I applied via Company Website and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical (maintenance activities &testing activities)As per resume mentioned

Interview Preparation Tips

Interview preparation tips for other job seekers - All mentioned are clearly
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Last question was... If you are that good, your previous company will suffer when you leave that organisation.
  • Ans. My previous company is a good organization. Work will not going to stop for just one employee, and also they have lot of talented employees.
  • Answered by saltyflamingo
Round 3 - HR 

(1 Question)

  • Q1. You are coming in client company and that is good for you so please don't demand 25% hike.
  • Ans. My present company also a brand and gem company of transmission line. So pls provide suitable CTC.
  • Answered by saltyflamingo

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer with confidence. If you don't know answer than just accept it.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are closed loop control system
  • Ans. 

    Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.

    • Closed loop control systems use feedback to maintain a desired output

    • They continuously monitor the output and compare it to the desired input

    • Based on the comparison, adjustments are made to maintain the desired output

    • Examples include thermostat-controlled heating systems and cruise control in cars

  • Answered by AI
  • Q2. Details of Field instruments
Round 3 - Technical 

(3 Questions)

  • Q1. Brief discussion on c&i
  • Q2. How you will handle the situations
  • Q3. What are expecting from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Always prepare in detail what u have written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your name, qualification & why you want to join organisation
Round 2 - Technical 

(1 Question)

  • Q1. I was hired for condition monitoring roll. It was basic questions with vibration analysis. You should know the basics and case study.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & you should have basis knowledge.

I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. MOTOR AMD PANEL SWITCHGEAR ERECTION IN OIL AND GAS FIELD
  • Ans. 

    Motor and panel switchgear erection in oil and gas field

    • Experience in installation and maintenance of motor and panel switchgear in oil and gas field

    • Knowledge of safety regulations and procedures in hazardous environments

    • Ability to read and interpret technical drawings and schematics

    • Familiarity with testing and commissioning procedures

    • Experience in troubleshooting and resolving electrical issues

    • Examples: installation o...

  • Answered by AI
  • Q2. SITE EXECUTION
  • Q3. PLANNING AND EXECUTION TESTING
  • Q4.  DATE OF COMPLITION
  • Ans. 

    Date of completion refers to the deadline or expected date of finishing a project or task.

    • It is important to set a realistic date of completion to ensure timely delivery of projects.

    • Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.

    • Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - ALL MOST ASK FOR FILD EXECUTION
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About solar working
  • Q2. About cell vs module

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with basic knowledge of solar
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Core field work related questions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion & Benifits

Sterlite Power Interview FAQs

How many rounds are there in Sterlite Power Assistant Manager interview?
Sterlite Power interview process usually has 2 rounds. The most common rounds in the Sterlite Power interview process are Resume Shortlist, Group Discussion and Technical.
How to prepare for Sterlite Power Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterlite Power. The most common topics and skills that interviewers at Sterlite Power expect are Operations, Power Transmission, Renewable Energy, Legal and Wind Energy.
What are the top questions asked in Sterlite Power Assistant Manager interview?

Some of the top questions asked at the Sterlite Power Assistant Manager interview -

  1. Questions related to my fi...read more
  2. Debt equity ra...read more

Tell us how to improve this page.

Sterlite Power Assistant Manager Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more
Sterlite Power Assistant Manager Salary
based on 154 salaries
₹4.7 L/yr - ₹14.7 L/yr
6% more than the average Assistant Manager Salary in India
View more details

Sterlite Power Assistant Manager Reviews and Ratings

based on 31 reviews

3.4/5

Rating in categories

3.2

Skill development

3.4

Work-life balance

3.9

Salary

3.0

Job security

3.3

Company culture

3.1

Promotions

3.3

Work satisfaction

Explore 31 Reviews and Ratings
Chief Manager
163 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
160 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
112 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Sterlite Power with

Power Grid Corporation of India

4.4
Compare

Adani Transmission

3.7
Compare

Tata Power

3.9
Compare

NHPC

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview