Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Sterlite Power Team. If you also belong to the team, you can get access from here

Sterlite Power Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterlite Power Chief Project Manager Interview Questions and Answers

Updated 15 Mar 2024

Sterlite Power Chief Project Manager Interview Experiences

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Pv Module & transformer technical

Interview Preparation Tips

Interview preparation tips for other job seekers - To answer very boldly. Technical basic point to be known.

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Asked about the Solar O&M briefly
  • Q2. Related to job responsibilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep update the resume daily in Naukri portal and chances to get more calls from the companies

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions

I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked About the job profiles and your responsibility.
  • Q2. Need to know technical knowledge of your background.

Interview Preparation Tips

Interview preparation tips for other job seekers - You should have proper knowledge according to your CV.

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer wanted to best knowledge of your profile and your communication skills .

I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About job profile and competency in SAP
Round 3 - HR 

(1 Question)

  • Q1. ABOUT SALARY AND NEGOTIATION

Interview Preparation Tips

Interview preparation tips for other job seekers - INTRODUCE YOURSELF, VERY SEPECIFIC TO THE JOB PROFILE AND YOUR ACHEIVEMENTS
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Cable type and it's current rating
  • Ans. 

    Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.

    • Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)

    • Current rating is determined by factors such as conductor size, insulation material, and ambien...

  • Answered by AI
  • Q2. What were the costs and other technical parameters, such as the client and scope of work, for your last project?
  • Ans. 

    The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.

    • Client: Company A

    • Scope of work: Development of new software system

    • Cost: $100,000

    • Technical parameters: Integration with existing systems, timeline of 6 months

  • Answered by AI
  • Q3. What are the types of substations and how does a bay function within them?
  • Ans. 

    Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.

    • Types of substations include distribution substations, transmission substations, and switching substations.

    • Distribution substations typically step down voltage for local distribution to customers.

    • Transmission substations step up voltage for long-distanc...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About solar working
  • Q2. About cell vs module

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with basic knowledge of solar
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Core field work related questions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion & Benifits

Sterlite Power Interview FAQs

How many rounds are there in Sterlite Power Chief Project Manager interview?
Sterlite Power interview process usually has 1 rounds. The most common rounds in the Sterlite Power interview process are Technical.
How to prepare for Sterlite Power Chief Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterlite Power. The most common topics and skills that interviewers at Sterlite Power expect are Operations, Project Management, Power Transmission, Analytical Chemistry and Project Execution.
What are the top questions asked in Sterlite Power Chief Project Manager interview?

Some of the top questions asked at the Sterlite Power Chief Project Manager interview -

  1. Starting from Bid download to submiss...read more
  2. Bidding proc...read more

Tell us how to improve this page.

Sterlite Power Chief Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 229 Interviews
ReNew Interview Questions
4.2
 • 89 Interviews
Vestas Interview Questions
4.3
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 83 Interviews
Siemens Energy Interview Questions
4.1
 • 75 Interviews
Inox Wind Interview Questions
3.7
 • 38 Interviews
View all
Sterlite Power Chief Project Manager Salary
based on 16 salaries
₹15 L/yr - ₹28.5 L/yr
15% less than the average Chief Project Manager Salary in India
View more details

Sterlite Power Chief Project Manager Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.4

Skill development

4.0

Work-life balance

4.6

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
182 salaries
unlock blur

₹4.7 L/yr - ₹14.7 L/yr

Chief Manager
155 salaries
unlock blur

₹11 L/yr - ₹40 L/yr

Manager
111 salaries
unlock blur

₹7 L/yr - ₹24 L/yr

Safety Officer
66 salaries
unlock blur

₹2 L/yr - ₹6.6 L/yr

Quality Engineer
46 salaries
unlock blur

₹2.4 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Sterlite Power with

Adani Power

3.9
Compare

ReNew

4.2
Compare

Adani Green Energy

4.1
Compare

Vestas

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview