Filter interviews by
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
Variable frequency drives are electronic devices that control the speed of AC motors by varying the frequency of the power supplied to them.
They are also known as VFDs or inverters.
They are used to save energy and improve motor control.
They can be used in various applications such as HVAC systems, pumps, and conveyors.
They work by converting AC power to DC power and then back to AC power at a variable frequency.
They ca...
I'm sorry, but I don't have enough context to answer this question.
Please provide more information about Iran's and magnos in had analyzers.
Are you referring to a specific type of analyzer or technology?
Without more context, I cannot provide a meaningful answer.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
I ensured that all employees followed the company's code of conduct, which included ethical behavior and safety protocols.
Implemented regular training sessions on the code of conduct
Encouraged employees to report any violations
Took disciplinary action against those who violated the code
Ensured that safety protocols were strictly followed
Maintained a positive work environment
Regularly reviewed and updated the code of co
Family background includes diverse professions and strong work ethic.
Parents were both educators, instilling a love of learning and teaching in me.
Grandfather was a successful businessman, teaching me the value of hard work and determination.
Uncle is a doctor, inspiring me to pursue a career in healthcare.
Cousin is a lawyer, showing me the importance of critical thinking and problem-solving.
Overall, my family has alway...
I applied via Walk-in and was interviewed before May 2020. There were 5 interview rounds.
Approach to implementation in industry involves planning, communication, testing and evaluation.
Identify the problem and set goals
Develop a plan with clear objectives and timelines
Communicate the plan to all stakeholders
Test the plan in a controlled environment
Evaluate the results and make necessary adjustments
Implement the plan on a larger scale
Continuously monitor and improve the implementation process
I compare myself with others to learn and grow, but I focus on self-improvement and avoiding racism.
I believe in continuous self-improvement and learning from others' talents.
I strive to be aware of any biases or prejudices I may have and actively work to avoid racism.
I focus on my own growth and development rather than comparing myself negatively to others.
I value diversity and inclusion in the workplace and appreciat
posted on 7 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
Finalizing CTC involves considering various factors like cost of living, market rates, company budget, and employee qualifications.
Consider cost of living in the location of posting
Compare market rates for similar positions in the area
Ensure the CTC fits within the company's budget constraints
Take into account the qualifications and experience of the employee
Negotiate if necessary to reach a mutually beneficial CTC
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
based on 1 interview
Interview experience
based on 52 reviews
Rating in categories
Sales Officer
11
salaries
| ₹2.4 L/yr - ₹3.9 L/yr |
Assistant Electrical Engineer
9
salaries
| ₹2.2 L/yr - ₹4.6 L/yr |
Junior Engineer
7
salaries
| ₹1.2 L/yr - ₹2.8 L/yr |
CCR Operator
7
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Assistant Engineer
6
salaries
| ₹2 L/yr - ₹3 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon