i
Filter interviews by
The total quantity of steel in OHT is calculated by summing up the individual quantities of steel used in the construction.
Calculate the quantity of steel used in each component of the OHT (e.g. beams, columns, slabs, etc.)
Sum up the individual quantities to get the total quantity of steel in OHT
Consider any additional steel reinforcements or accessories used in the construction
Fusion joint is a method used to join pipes in a pipeline by heating the ends and pressing them together to create a strong bond.
Fusion joint involves heating the ends of the pipes to a specific temperature
The heated ends are then pressed together to form a strong bond
This method is commonly used in industries like oil and gas for pipeline construction
I appeared for an interview in Oct 2024, where I was asked the following questions.
I appeared for an interview in Dec 2024.
Understand the format: Know the types of questions and structure
Practice: Practice regularly to master the skills needed to pass the test
Learn the basics: Learn basic algorithms and data structures, and understand Big-O Notation
Take practice tests: Take practice questions on a coding test site
Review code: Review your work and learn to code for software and system designs
Skylark Infra Engineering Private Limited interview questions for popular designations
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.
Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.
It helps in estimating the total cost of a project and comparing it with the budget.
Factors like market rates, location, and project specifications are considered in rate analysis.
Example: Calculating the rate of conc...
Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.
Standard output is determined by the capacity and efficiency of the machinery.
Factors affecting standard output include machine speed, maintenance, and operator skill.
Examples of standard output measurements include units per hour, tons per day, or meters per minute.
Get interview-ready with Top Skylark Infra Engineering Private Limited Interview Questions
I am available to join starting next month.
Available to start next month
Can provide specific start date during negotiation
Flexible with start date based on company needs
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Toll line is a term used in accounting to refer to a line item on a financial statement that represents a company's expenses related to tolls.
Toll line is typically found under the operating expenses section of a company's income statement.
It includes expenses incurred for toll roads, bridges, tunnels, or other transportation-related fees.
Toll line helps to track and analyze the costs associated with transportation for...
Yes, I am interested in joining your company as an Accountant.
I have a strong background in accounting and finance
I am eager to contribute my skills and expertise to your team
I am excited about the opportunity to grow and develop within your company
I applied via Job Portal and was interviewed in Nov 2023. There were 3 interview rounds.
Our company is a leading accounting firm specializing in providing financial services to a wide range of clients.
Specializes in financial services
Serves a diverse client base
Known for expertise in accounting practices
TDS deduction is mandatory under specific conditions based on income types and thresholds set by the Income Tax Act.
TDS is applicable on salaries exceeding the basic exemption limit.
For interest payments, TDS is deducted if the amount exceeds ₹40,000 in a financial year.
Professional fees above ₹30,000 in a financial year attract TDS deduction.
Rent payments exceeding ₹2,40,000 annually require TDS deduction.
TDS is also ...
I appeared for an interview in Mar 2023.
Top trending discussions
The duration of Skylark Infra Engineering Private Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interviews
Interview experience
based on 183 reviews
Rating in categories
Gurgaon / Gurugram
4-9 Yrs
Not Disclosed
Gurgaon / Gurugram,
Delhi/Ncr
3-8 Yrs
Not Disclosed
Executive Accountant
11
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Accounts Executive
11
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Assistant Manager
10
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Structural Engineer
9
salaries
| ₹3.8 L/yr - ₹6.6 L/yr |
Store Executive
8
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies