I was interviewed in Dec 2024.
Understand the format: Know the types of questions and structure
Practice: Practice regularly to master the skills needed to pass the test
Learn the basics: Learn basic algorithms and data structures, and understand Big-O Notation
Take practice tests: Take practice questions on a coding test site
Review code: Review your work and learn to code for software and system designs
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
Rate analysis of BOQ items involves calculating the rates of various items in the Bill of Quantities.
Rate analysis involves determining the cost of materials, labor, and equipment for each item in the BOQ.
It helps in estimating the total cost of a project and comparing it with the budget.
Factors like market rates, location, and project specifications are considered in rate analysis.
Example: Calculating the rate of conc...
Standard output of Machinery refers to the expected production rate or quantity of goods produced by a machine in a given time period.
Standard output is determined by the capacity and efficiency of the machinery.
Factors affecting standard output include machine speed, maintenance, and operator skill.
Examples of standard output measurements include units per hour, tons per day, or meters per minute.
I am available to join starting next month.
Available to start next month
Can provide specific start date during negotiation
Flexible with start date based on company needs
Skylark Infra Engineering Private Limited interview questions for popular designations
The total quantity of steel in OHT is calculated by summing up the individual quantities of steel used in the construction.
Calculate the quantity of steel used in each component of the OHT (e.g. beams, columns, slabs, etc.)
Sum up the individual quantities to get the total quantity of steel in OHT
Consider any additional steel reinforcements or accessories used in the construction
Fusion joint is a method used to join pipes in a pipeline by heating the ends and pressing them together to create a strong bond.
Fusion joint involves heating the ends of the pipes to a specific temperature
The heated ends are then pressed together to form a strong bond
This method is commonly used in industries like oil and gas for pipeline construction
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Toll line is a term used in accounting to refer to a line item on a financial statement that represents a company's expenses related to tolls.
Toll line is typically found under the operating expenses section of a company's income statement.
It includes expenses incurred for toll roads, bridges, tunnels, or other transportation-related fees.
Toll line helps to track and analyze the costs associated with transportation for...
Yes, I am interested in joining your company as an Accountant.
I have a strong background in accounting and finance
I am eager to contribute my skills and expertise to your team
I am excited about the opportunity to grow and develop within your company
I applied via Job Portal and was interviewed in Nov 2023. There were 3 interview rounds.
Our company is a leading accounting firm specializing in providing financial services to a wide range of clients.
Specializes in financial services
Serves a diverse client base
Known for expertise in accounting practices
I was interviewed in Mar 2023.
Project life cycle refers to the stages a project goes through from initiation to closure.
It includes phases such as planning, execution, monitoring and control, and closure.
Each phase has specific deliverables and objectives.
The life cycle can be tailored to fit the needs of the project and organization.
Examples include the Waterfall model and Agile methodology.
Effective management of the life cycle can lead to succes
DBM laying is the process of laying Dense Bituminous Macadam on a road surface.
The surface is prepared by cleaning and leveling it.
A tack coat is applied to the surface to ensure proper bonding.
DBM is laid in layers of 50-75 mm and compacted using a roller.
The process is repeated until the desired thickness is achieved.
Finally, a seal coat is applied to protect the surface from water and other elements.
Top trending discussions
The duration of Skylark Infra Engineering Private Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 29 interviews
Interview experience
based on 178 reviews
Rating in categories
Gurgaon / Gurugram,
Delhi/Ncr
2-7 Yrs
Not Disclosed
Senior Accounts Executive
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure