Project life cycle refers to the stages a project goes through from initiation to closure.
It includes phases such as planning, execution, monitoring and control, and closure.
Each phase has specific deliverables and objectives.
The life cycle can be tailored to fit the needs of the project and organization.
Examples include the Waterfall model and Agile methodology.
Effective management of the life cycle can lead to succes
DBM laying is the process of laying Dense Bituminous Macadam on a road surface.
The surface is prepared by cleaning and leveling it.
A tack coat is applied to the surface to ensure proper bonding.
DBM is laid in layers of 50-75 mm and compacted using a roller.
The process is repeated until the desired thickness is achieved.
Finally, a seal coat is applied to protect the surface from water and other elements.
Top trending discussions
posted on 8 Jul 2024
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
I applied via Naukri.com and was interviewed before Jan 2023. There were 3 interview rounds.
Regarding mathematics and problem solving
posted on 8 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 11 Jun 2023
Already talked to you
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 4 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
I would prioritize communication with the labor union and work towards finding a resolution while also adjusting project timelines and resources.
Establish open communication with the labor union to understand their concerns and negotiate a solution
Assess the impact of the strike on the project timeline and adjust accordingly
Explore alternative resources or outsourcing options to mitigate the impact of the strike
Ensure ...
I prepared a cost controlled system by implementing budget tracking tools and regularly reviewing expenses.
Implemented budget tracking tools to monitor expenses
Regularly reviewed expenses to identify areas for cost savings
Established clear budget guidelines and communicated them to team members
Negotiated with vendors to secure better pricing
Implemented cost-saving measures such as energy-efficient equipment or remote w...
Senior Accounts Executive
11
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Assistant Manager
10
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Executive Accountant
9
salaries
| ₹2 L/yr - ₹3.9 L/yr |
Structural Engineer
9
salaries
| ₹3.8 L/yr - ₹6.6 L/yr |
Accountant
8
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure