Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Simplex Infrastructures Assistant Engineer - Civil Interview Questions and Answers for Experienced

Updated 8 Apr 2024

Simplex Infrastructures Assistant Engineer - Civil Interview Experiences for Experienced

1 interview found

I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS, schedule plans, QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simplex are not goodpay masters for their employees. Wosrt management and salary delayed for more than two to three months also.. no dignified behavior especially the Project Manager name Nehru & AGM syed asim were the racists & literally treat engineers like dogs. No proper work culture & internal conflicts.. such an worst management & no future for aspirants.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Explain Hydraulic
  • Ans. 

    Hydraulic refers to the study of fluids in motion and the engineering applications of fluid mechanics.

    • Hydraulic engineering involves the design and construction of structures that control the flow and pressure of liquids, such as dams, canals, and pipelines.

    • Hydraulic systems use fluid pressure to generate, control, and transmit power, commonly found in machinery like hydraulic lifts and brakes.

    • Hydraulic principles are ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Discuss on the projects mentioned on the cv

I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What is hydration process during casting of concrete?
  • Ans. 

    Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.

    • Hydration process starts as soon as water is added to cement.

    • The reaction produces heat and causes the mixture to harden and gain strength.

    • The process continues for weeks and even months, resulting in a stronger and more durable concrete.

    • The amount of water used in the mixture affects the hydration process and...

  • Answered by AI
  • Q2. Concrete strength depend ?
  • Ans. 

    Concrete strength depends on various factors.

    • Water-cement ratio

    • Type and quality of cement

    • Aggregate size and shape

    • Curing conditions

    • Mix design

    • Age of concrete

    • Temperature and humidity

    • Presence of admixtures

  • Answered by AI
  • Q3. Why used send in concrete mixer
  • Ans. 

    Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.

    • Water is added to hydrate the cement and activate the chemical reaction that causes it to harden

    • The amount of water added affects the strength and durability of the concrete

    • Too much water can weaken the concrete and cause cracking

    • The water should be added gradually and mixed thoroughly to ensure even distribution

    • Ot...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for AECOM Assistant Engineer - Civil interview:
  • Environmental effect on concrete
Interview preparation tips for other job seekers - Please increase knowledge inhance of fresher and experienced
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Basic questions regarding previous jobs.
  • Q2. What type of work You do?
  • Q3. How much experience do you have and in which sector?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just prepared for basic questions regarding site execution, QS, BBS etc

I applied via Naukri.com and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

8 Questions

  • Q1. Previous what experience you have ?
  • Q2. What type of checking done on site?
  • Q3. Which grade used on your site?
  • Ans. 

    We use grade 40 concrete for our site construction.

    • Grade 40 concrete is commonly used for structural applications in construction.

    • It has a compressive strength of 40 megapascals (MPa) after 28 days of curing.

    • Grade 40 concrete is suitable for various construction projects such as buildings, bridges, and pavements.

  • Answered by AI
  • Q4. Why cover is provide to the structure s?
  • Ans. 

    Cover is provided to structures for protection against environmental factors and to increase their lifespan.

    • Protects against rain, snow, wind, and sunlight

    • Prevents corrosion and deterioration of materials

    • Increases lifespan of the structure

    • Improves aesthetics of the structure

    • Examples: roofs, walls, paint coatings

  • Answered by AI
  • Q5. Acceptance criteria for the compressive strength ?
  • Ans. 

    Acceptance criteria for compressive strength in civil engineering

    • Compressive strength is the ability of a material to withstand compressive loads

    • Acceptance criteria for compressive strength is determined by the design specifications and standards

    • The compressive strength of concrete is typically measured in pounds per square inch (psi)

    • The acceptance criteria for compressive strength of concrete varies depending on the t

  • Answered by AI
  • Q6. How to check reinforcement ?
  • Ans. 

    Reinforcement can be checked by visual inspection, measuring diameter, spacing, and cover, and using non-destructive testing methods.

    • Visual inspection for any visible damage or corrosion

    • Measuring diameter of reinforcement bars using a caliper or micrometer

    • Measuring spacing between reinforcement bars using a tape measure

    • Measuring cover using a cover meter

    • Using non-destructive testing methods such as ultrasonic testing o

  • Answered by AI
  • Q7. If the cubes are failed then what will you do ?
  • Q8. What kind of steel you used in previous project ?
  • Ans. 

    In the previous project, we used structural steel for the construction of the building.

    • Structural steel was used for its high strength and durability.

    • It was used in the construction of beams, columns, and other load-bearing elements.

    • The specific type of steel used may vary depending on the project requirements and design specifications.

    • Examples of commonly used structural steels include ASTM A36, ASTM A572, and ASTM A9

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Genuinely learn your work. And get deep knowledge related to the work .your marks percentage and all doesn't matter .but what type of experience ,you have got it's really matter.learn more as well as grow more .

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI

I applied via Approached by company and was interviewed in Dec 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is mixtatio of concrete, what are the type of IS code, what is setting time of cement why proved clear cover, transition curve , supervisor elevation, pavement design, what cover use in beam , sorry I...
  • Ans. 

    Answering questions related to concrete mix, IS codes, cement setting time, clear cover, transition curve, supervisor elevation, pavement design, and beam cover.

    • Mix ratio of concrete is the proportion of cement, sand, and aggregate used in the mixture.

    • IS codes are Indian Standards codes that provide guidelines for construction materials and practices.

    • Setting time of cement is the time taken by cement to harden and gain...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be serious during interview

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Assistant Engineer - Civil interview for experienced candidates?
Simplex Infrastructures interview process for experienced candidates usually has 1 rounds. The most common rounds in the Simplex Infrastructures interview process for experienced candidates are Technical.
What are the top questions asked in Simplex Infrastructures Assistant Engineer - Civil interview for experienced candidates?

Some of the top questions asked at the Simplex Infrastructures Assistant Engineer - Civil interview for experienced candidates -

  1. How to calculate carpet area of a build...read more
  2. BBS, schedule plans, ...read more

Tell us how to improve this page.

Simplex Infrastructures Assistant Engineer - Civil Salary
based on 153 salaries
₹2.6 L/yr - ₹4.5 L/yr
22% less than the average Assistant Engineer - Civil Salary in India
View more details

Simplex Infrastructures Assistant Engineer - Civil Reviews and Ratings

based on 45 reviews

3.1/5

Rating in categories

3.5

Skill development

2.8

Work-life balance

2.2

Salary

3.2

Job security

2.5

Company culture

2.6

Promotions

2.7

Work satisfaction

Explore 45 Reviews and Ratings
Assistant Manager
212 salaries
unlock blur

₹3.5 L/yr - ₹11 L/yr

Assistant Engineer
154 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Project Engineer
128 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
110 salaries
unlock blur

₹5.5 L/yr - ₹12 L/yr

Explore more salaries
Compare Simplex Infrastructures with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview