The density of steel is approximately 7.85 g/cm³.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm³).
The density of steel can vary slightly depending on the specific alloy and composition.
For example, the density of stainless steel is around 7.9 g/cm³, while the density of carbon steel is around 7.85 g/cm³.
Top trending discussions
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.
Measure the length and width of the area to be covered with stone/tile flooring/cladding
Multiply the length by the width to get the total square meters or square feet
Account for any cuts or wastage in the calculation
Consider the pattern or design of the flooring/cladding when measuring
I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
posted on 5 Jan 2025
I applied via Job Portal and was interviewed in Dec 2024. There was 1 interview round.
posted on 18 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Rolling margin of steel refers to the difference between the theoretical weight of steel and the actual weight after rolling.
Rolling margin is calculated by subtracting the actual weight of rolled steel from the theoretical weight.
It accounts for factors like material loss during the rolling process and variations in density.
Understanding rolling margin is important for accurate billing and cost estimation in steel pro
OHC stands for Over Head Charges while Wege Escalation is a term used in construction projects.
OHC refers to additional charges incurred during a project that are not directly related to labor or materials
Wege Escalation refers to the increase in costs due to delays or changes in the project timeline
OHC can include expenses like equipment rental, permits, or insurance
Wege Escalation can occur when there are unexpected ...
Measurement of brick work, shuttering, scaffolding, plaster, and painting is typically done in square meters or cubic meters depending on the item.
Brick work is measured in square meters (m²)
Shuttering is measured in square meters (m²)
Scaffolding is measured in cubic meters (m³)
Plaster is measured in square meters (m²)
Painting is measured in square meters (m²)
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.
Measure the length and width of the area to be covered with stone/tile flooring/cladding
Multiply the length by the width to get the total square meters or square feet
Account for any cuts or wastage in the calculation
Consider the pattern or design of the flooring/cladding when measuring
I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
Project Manager
5
salaries
| ₹4.8 L/yr - ₹8.5 L/yr |
Civil Site Engineer
4
salaries
| ₹2 L/yr - ₹3 L/yr |
Senior Site Engineer
4
salaries
| ₹3 L/yr - ₹5 L/yr |
Site Engineer and Billing Engineer
4
salaries
| ₹5.4 L/yr - ₹8.4 L/yr |
Senior Engineer
3
salaries
| ₹3 L/yr - ₹4.6 L/yr |
Lulu International Shopping Mall
Signature Global
HM Group
Sunteck Realty