Shree Krishnanand Infrastructure & Developers Billing Engineer Interview Questions and Answers

Updated 12 Mar 2024

Shree Krishnanand Infrastructure & Developers Billing Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Site related questions.
  • Q2. What is the density of steel.
  • Ans. 

    The density of steel is approximately 7.85 g/cm³.

    • The density of steel is commonly expressed in grams per cubic centimeter (g/cm³).

    • The density of steel can vary slightly depending on the specific alloy and composition.

    • For example, the density of stainless steel is around 7.9 g/cm³, while the density of carbon steel is around 7.85 g/cm³.

  • Answered by AI

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(8 Questions)

  • Q1. What is your work in previous company ?
  • Q2. Tell me about rolling margin of steel?
  • Ans. 

    Rolling margin of steel refers to the difference between the theoretical weight of steel and the actual weight after rolling.

    • Rolling margin is calculated by subtracting the actual weight of rolled steel from the theoretical weight.

    • It accounts for factors like material loss during the rolling process and variations in density.

    • Understanding rolling margin is important for accurate billing and cost estimation in steel pro

  • Answered by AI
  • Q3. Steel and cement Reconciliation?
  • Q4. Good knowledge in foot and inche measurment for Punjab Site.
  • Q5. What is diffence between OHC and Wege Excalation?
  • Ans. 

    OHC stands for Over Head Charges while Wege Escalation is a term used in construction projects.

    • OHC refers to additional charges incurred during a project that are not directly related to labor or materials

    • Wege Escalation refers to the increase in costs due to delays or changes in the project timeline

    • OHC can include expenses like equipment rental, permits, or insurance

    • Wege Escalation can occur when there are unexpected ...

  • Answered by AI
  • Q6. Good knowlege of DAR and there veriables.
  • Q7. Mode of measurment of brick work, shuttering, Scaffolding, plaster, and painting.
  • Ans. 

    Measurement of brick work, shuttering, scaffolding, plaster, and painting is typically done in square meters or cubic meters depending on the item.

    • Brick work is measured in square meters (m²)

    • Shuttering is measured in square meters (m²)

    • Scaffolding is measured in cubic meters (m³)

    • Plaster is measured in square meters (m²)

    • Painting is measured in square meters (m²)

  • Answered by AI
  • Q8. Good knowledge of IS 1200 for billing and Quantity Surveyor.
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection

Shree Krishnanand Infrastructure & Developers Interview FAQs

How many rounds are there in Shree Krishnanand Infrastructure & Developers Billing Engineer interview?
Shree Krishnanand Infrastructure & Developers interview process usually has 1 rounds. The most common rounds in the Shree Krishnanand Infrastructure & Developers interview process are Technical.
What are the top questions asked in Shree Krishnanand Infrastructure & Developers Billing Engineer interview?

Some of the top questions asked at the Shree Krishnanand Infrastructure & Developers Billing Engineer interview -

  1. What is the density of ste...read more
  2. Site related questio...read more

Tell us how to improve this page.

Shree Krishnanand Infrastructure & Developers Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sunteck Realty Interview Questions
3.3
 • 23 Interviews
ASSA ABLOY Interview Questions
3.6
 • 17 Interviews
Pittie Group Interview Questions
2.7
 • 16 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
Alpha Corp Interview Questions
4.4
 • 13 Interviews
Pin Click Interview Questions
3.2
 • 12 Interviews
91springboard Interview Questions
3.5
 • 11 Interviews
View all
Project Manager
5 salaries
unlock blur

₹4.8 L/yr - ₹8.5 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Senior Site Engineer
4 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Site Engineer and Billing Engineer
4 salaries
unlock blur

₹5.4 L/yr - ₹8.4 L/yr

Senior Engineer
3 salaries
unlock blur

₹3 L/yr - ₹4.6 L/yr

Explore more salaries
Compare Shree Krishnanand Infrastructure & Developers with

Lulu International Shopping Mall

3.9
Compare

Signature Global

3.9
Compare

Sunteck Realty

3.3
Compare

Pittie Group

2.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview