Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Saakaar Constructions Team. If you also belong to the team, you can get access from here

Saakaar Constructions Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 45 Reviews

Filter interviews by

Saakaar Constructions Interview Questions, Process, and Tips

Updated 15 Dec 2023

Top Saakaar Constructions Interview Questions and Answers

View all 6 questions

Saakaar Constructions Interview Experiences

Popular Designations

2 interviews found

Civil Foreman Interview Questions & Answers

user image Sunil Singh

posted on 16 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How to start the Tile work
  • Ans. 

    To start the Tile work, first prepare the surface, gather necessary materials and tools, plan the layout, mix the adhesive, and begin setting the tiles.

    • Prepare the surface by ensuring it is clean, dry, and level

    • Gather necessary materials such as tiles, adhesive, grout, spacers, and tools like trowels, tile cutter, and level

    • Plan the layout by measuring and marking guidelines on the surface

    • Mix the adhesive according to m...

  • Answered by AI
  • Q2. What to check in the plaster
  • Ans. 

    Check for cracks, consistency, smoothness, adhesion, and overall quality in plaster.

    • Inspect for any cracks or damage in the plaster surface.

    • Ensure the consistency of the plaster mixture is correct for proper application.

    • Check for smoothness in the finished plaster surface.

    • Test the adhesion of the plaster to the substrate.

    • Overall, assess the quality of the plaster for durability and aesthetics.

  • Answered by AI
  • Q3. What to check before starting the plaster
  • Ans. 

    Before starting the plaster, it is important to check the surface for cleanliness, moisture content, and proper bonding.

    • Check the surface for cleanliness to ensure proper adhesion of the plaster.

    • Ensure the surface is free of dust, dirt, grease, and loose particles.

    • Check the moisture content of the surface to prevent issues with drying and cracking of the plaster.

    • Test the surface for proper bonding by applying a small a...

  • Answered by AI
  • Q4. What to check in the Tile work
  • Ans. 

    Check for proper alignment, level, spacing, quality of materials, and grout consistency in tile work.

    • Ensure tiles are aligned properly and level

    • Check spacing between tiles for consistency

    • Inspect quality of materials used for tiles

    • Verify grout consistency and application

    • Look for any cracks or chips in the tiles

  • Answered by AI
  • Q5. Please explain the painting work, inside and outer side both
  • Ans. 

    Painting work involves applying paint to surfaces, both inside and outside of buildings.

    • Prepare the surface by cleaning, sanding, and priming before painting

    • Choose the appropriate type of paint for the surface being painted

    • Apply paint evenly using brushes, rollers, or sprayers

    • Ensure proper ventilation when painting indoors to prevent fumes

    • Protect surrounding areas from paint splatter with tape or drop cloths

    • Inspect the...

  • Answered by AI
  • Q6. Explain the waterproofing process in Toilets and their chemicals also
  • Ans. 

    Waterproofing process in toilets involves applying chemicals to prevent water leakage and damage.

    • The first step is to clean and prepare the surface by removing any dirt, grease, or old waterproofing material.

    • Next, a primer is applied to ensure proper adhesion of the waterproofing membrane.

    • Then, a waterproofing membrane is applied to the surface. This can be in the form of liquid-applied membranes, sheet membranes, or c...

  • Answered by AI

Top Saakaar Constructions Civil Foreman Interview Questions and Answers

Q1. What to check before starting the plaster
View answer (1)

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. TMT bars, cement components, structural rates, and one more ABC analysis questions

Manager Purchase & Stores Interview Questions asked at other Companies

Q1. When negotiation with a suppliers,what is your process for determining if the price is fair?
View answer (2)

Jobs at Saakaar Constructions

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Roles and responsibility?
  • Q2. Major incident the chiller and DG past 1 year, how could handle in your part?
Round 2 - Technical 

(2 Questions)

  • Q1. What is statutory documents
  • Q2. Who invented Electricity
Round 3 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Why we hired you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Learning new things and think innovative and face new challenge as new role for carrier growth.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions on PPC
  • Q2. Approach in handling real estate clients
  • Ans. 

    I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.

    • Building trust through transparency and honesty

    • Understanding client needs and preferences

    • Providing personalized service tailored to each client

    • Maintaining open communication throughout the process

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Casual discussion on technical skills

Interview Preparation Tips

Interview preparation tips for other job seekers - They processed my profile even after knowing that it was 60 days and after going through 2 rounds of interview, they just rejected me saying they're looking for an immediate joiner. This isn't cool considering I went f2f round which is 30kms far.

Assistant Manager- Audit & Billing Interview Questions & Answers

Signature Global user image Anonymous

posted on 16 Dec 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Refer to the IS Codes & relevant Specifications.
  • Q2. Should have basic knowledge like consumption, wastage & as per projects
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. About past experience
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Family background
  • Q2. Previous organisations
  • Q3. Road map of railway
  • Ans. 

    The road map of a railway system outlines the network of tracks, stations, and connections for trains to travel on.

    • The road map includes all the tracks, stations, and junctions in the railway system

    • It shows the routes that trains can take to reach different destinations

    • The road map may also include information on train schedules, stops, and connections

    • Railway companies often update their road maps to reflect changes in

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have given the interview but the response for HR has not come and they just called be back again and again but then also there is no response. Almost i have given 4round of interview then also it has not come to result.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Discuss about salary
  • Q2. Discuss about work opportunities
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
No response

I applied via Approached by Company and was interviewed in May 2024. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me About Yourself
  • Ans. 

    Experienced executive accountant with a strong track record in financial management and strategic planning.

    • Over 10 years of experience in accounting and finance

    • Expertise in budgeting, forecasting, and financial analysis

    • Proven ability to streamline processes and improve efficiency

    • Strong communication and leadership skills

    • Previously managed a team of accountants at XYZ Corporation

  • Answered by AI
  • Q2. Tell us About your experience
Round 2 - Technical 

(1 Question)

  • Q1. GST,TDS and Journal Entries questions
Round 3 - HR 

(2 Questions)

  • Q1. Tell us about yourself
  • Q2. Tell us about your experiance
Round 4 - HR 

(4 Questions)

  • Q1. Tell us about Yourself
  • Q2. Tell Us about your company
  • Q3. Tell us about your role & responsibility
  • Q4. What do you know about the company

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear all, If you are applying the job in this organization then please be aware because they are scammers they only wasting your time. I have done 3 rounds but when i give 4th round the HR Head said we are looking Account Receivable.Look they don't know which position they are hiring they just wasting your time.

Physical Security executive Interview Questions & Answers

Pittie Group user image Anonymous

posted on 7 Nov 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Depend of ur profile
  • Q2. Depends on ur profile
  • Q3. Last and finally selected by kkp. And that is just like “muh dikhai ki rasam” nothing much thy confirm. HR already done everything before sending to thm.

Interview Preparation Tips

Interview preparation tips for other job seekers - Everything is depends on company head KKPittie.
HRs scheduled interview according to the mood & availability of KKPittie.
Employees get fired on any silly nd single mistakes.
Company is always in hiring nd hiring position (toxic sign)
Comp. is in depth nd always found in illegal matters. (Purely nt a white collar)
I better say if anyone nt selected thr thnx for god . Hell is better thn this comp.

Saakaar Constructions Interview FAQs

How many rounds are there in Saakaar Constructions interview?
Saakaar Constructions interview process usually has 2 rounds. The most common rounds in the Saakaar Constructions interview process are Resume Shortlist and Technical.
How to prepare for Saakaar Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Saakaar Constructions. The most common topics and skills that interviewers at Saakaar Constructions expect are Residential, township, Finishing, Construction and Billing.
What are the top questions asked in Saakaar Constructions interview?

Some of the top questions asked at the Saakaar Constructions interview -

  1. What to check before starting the plas...read more
  2. Explain the waterproofing process in Toilets and their chemicals a...read more
  3. Please explain the painting work, inside and outer side b...read more

Tell us how to improve this page.

Saakaar Constructions Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more

Saakaar Constructions Reviews and Ratings

based on 45 reviews

3.8/5

Rating in categories

3.3

Skill development

3.6

Work-life balance

3.8

Salary

3.1

Job security

3.2

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 45 Reviews and Ratings
Saakaar Constructions Pvt. Ltd.

Bokaro,

Dhanbad

+2

5-8 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
14 salaries
unlock blur

₹4.8 L/yr - ₹7.2 L/yr

Civil Foreman
9 salaries
unlock blur

₹3.4 L/yr - ₹4.2 L/yr

Planning Engineer
8 salaries
unlock blur

₹3.9 L/yr - ₹8.5 L/yr

Customer Relationship Manager
7 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Senior Site Engineer
7 salaries
unlock blur

₹4.2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Saakaar Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview