Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Saakaar Constructions Team. If you also belong to the team, you can get access from here

Saakaar Constructions Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Saakaar Constructions Interview Questions, Process, and Tips

Updated 15 Dec 2023

Top Saakaar Constructions Interview Questions and Answers

View all 6 questions

Saakaar Constructions Interview Experiences

Popular Designations

2 interviews found

Civil Foreman Interview Questions & Answers

user image Sunil Singh

posted on 16 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How to start the Tile work
  • Ans. 

    To start the Tile work, first prepare the surface, gather necessary materials and tools, plan the layout, mix the adhesive, and begin setting the tiles.

    • Prepare the surface by ensuring it is clean, dry, and level

    • Gather necessary materials such as tiles, adhesive, grout, spacers, and tools like trowels, tile cutter, and level

    • Plan the layout by measuring and marking guidelines on the surface

    • Mix the adhesive according to m...

  • Answered by AI
  • Q2. What to check in the plaster
  • Ans. 

    Check for cracks, consistency, smoothness, adhesion, and overall quality in plaster.

    • Inspect for any cracks or damage in the plaster surface.

    • Ensure the consistency of the plaster mixture is correct for proper application.

    • Check for smoothness in the finished plaster surface.

    • Test the adhesion of the plaster to the substrate.

    • Overall, assess the quality of the plaster for durability and aesthetics.

  • Answered by AI
  • Q3. What to check before starting the plaster
  • Ans. 

    Before starting the plaster, it is important to check the surface for cleanliness, moisture content, and proper bonding.

    • Check the surface for cleanliness to ensure proper adhesion of the plaster.

    • Ensure the surface is free of dust, dirt, grease, and loose particles.

    • Check the moisture content of the surface to prevent issues with drying and cracking of the plaster.

    • Test the surface for proper bonding by applying a small a...

  • Answered by AI
  • Q4. What to check in the Tile work
  • Ans. 

    Check for proper alignment, level, spacing, quality of materials, and grout consistency in tile work.

    • Ensure tiles are aligned properly and level

    • Check spacing between tiles for consistency

    • Inspect quality of materials used for tiles

    • Verify grout consistency and application

    • Look for any cracks or chips in the tiles

  • Answered by AI
  • Q5. Please explain the painting work, inside and outer side both
  • Ans. 

    Painting work involves applying paint to surfaces, both inside and outside of buildings.

    • Prepare the surface by cleaning, sanding, and priming before painting

    • Choose the appropriate type of paint for the surface being painted

    • Apply paint evenly using brushes, rollers, or sprayers

    • Ensure proper ventilation when painting indoors to prevent fumes

    • Protect surrounding areas from paint splatter with tape or drop cloths

    • Inspect the...

  • Answered by AI
  • Q6. Explain the waterproofing process in Toilets and their chemicals also
  • Ans. 

    Waterproofing process in toilets involves applying chemicals to prevent water leakage and damage.

    • The first step is to clean and prepare the surface by removing any dirt, grease, or old waterproofing material.

    • Next, a primer is applied to ensure proper adhesion of the waterproofing membrane.

    • Then, a waterproofing membrane is applied to the surface. This can be in the form of liquid-applied membranes, sheet membranes, or c...

  • Answered by AI

Top Saakaar Constructions Civil Foreman Interview Questions and Answers

Q1. What to check before starting the plaster
View answer (1)

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. TMT bars, cement components, structural rates, and one more ABC analysis questions

Manager Purchase & Stores Interview Questions asked at other Companies

Q1. When negotiation with a suppliers,what is your process for determining if the price is fair?
View answer (2)

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions on PPC
  • Q2. Approach in handling real estate clients
  • Ans. 

    I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.

    • Building trust through transparency and honesty

    • Understanding client needs and preferences

    • Providing personalized service tailored to each client

    • Maintaining open communication throughout the process

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Casual discussion on technical skills

Interview Preparation Tips

Interview preparation tips for other job seekers - They processed my profile even after knowing that it was 60 days and after going through 2 rounds of interview, they just rejected me saying they're looking for an immediate joiner. This isn't cool considering I went f2f round which is 30kms far.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Why real estate?
  • Ans. 

    Passion for helping people find their dream homes and investment opportunities.

    • Enjoy working with people and helping them achieve their real estate goals

    • Fascinated by the ever-changing market trends and opportunities

    • Thrilled by the challenge of negotiating deals and closing sales

    • Passionate about the potential for financial growth and investment in real estate

  • Answered by AI
  • Q2. What is EBITDA ?
  • Ans. 

    EBITDA stands for Earnings Before Interest, Taxes, Depreciation, and Amortization. It is a measure of a company's operating performance.

    • EBITDA is calculated by adding back interest, taxes, depreciation, and amortization to net income.

    • It is used to analyze and compare profitability between companies and industries.

    • EBITDA helps in assessing a company's ability to generate cash flow.

    • Investors often use EBITDA to evaluate ...

  • Answered by AI
  • Q3. Draw the map of north Bangalore with utmost accuracy and project.
  • Ans. 

    I am unable to draw the map of north Bangalore with utmost accuracy and project without the necessary tools or resources.

    • I do not have the necessary tools or resources to accurately draw the map of north Bangalore.

    • Without access to a map or satellite imagery, it would be challenging to accurately depict the area.

    • I recommend using online mapping tools or physical maps for accurate representation.

  • Answered by AI
  • Q4. Pitch a project of your choice and depitch it's one strong competitor.
  • Ans. 

    Pitching a project to implement a customer loyalty program for a retail store and depitching a competitor's similar program.

    • Propose a customer loyalty program that rewards customers for repeat purchases and referrals.

    • Utilize a points-based system where customers can earn points for each purchase and redeem them for discounts or free products.

    • Implement personalized offers and discounts based on customer shopping habits ...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Calculate the final value a customer has to pay for project Nikoo 5
  • Ans. 

    To calculate the final value a customer has to pay for project Nikoo 5

    • Determine the initial cost of project Nikoo 5

    • Add any additional costs such as taxes, fees, or upgrades

    • Subtract any discounts or promotions

    • Consider any financing options or payment plans

    • Calculate the total amount the customer has to pay

  • Answered by AI
  • Q2. What is the difference between godrej finance plan and normal bank loan plan with example.
  • Ans. 

    Godrej finance plan offers customized financial solutions with flexible repayment options, while normal bank loan plan follows standard procedures and terms.

    • Godrej finance plan offers personalized financial solutions tailored to individual needs, while normal bank loan plan may have fixed terms and conditions.

    • Godrej finance plan may provide more flexible repayment options such as lower interest rates or longer repaymen...

  • Answered by AI
  • Q3. Tell me what you know about RERA and its major acts.
  • Ans. 

    RERA stands for Real Estate (Regulation and Development) Act, which aims to regulate the real estate sector and protect the interests of homebuyers.

    • RERA was enacted in 2016 to bring transparency and accountability in the real estate sector.

    • It mandates the registration of real estate projects and real estate agents with the regulatory authority.

    • RERA ensures timely completion of projects and protects buyers from unfair p...

  • Answered by AI
Round 3 - Aptitude Test 

It is combination of logical reasoning, quant, and english. Honestly it is quite tough being prepared is suggested.

Interview Preparation Tips

Topics to prepare for Prop Solutions4u Private Limited Assistant Manager interview:
  • Real Estate Sales
  • RERA Act
  • Commercial calculation
Interview preparation tips for other job seekers - Be prepared before you appear for the test.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Family background
  • Q2. Previous organisations
  • Q3. Road map of railway
  • Ans. 

    The road map of a railway system outlines the network of tracks, stations, and connections for trains to travel on.

    • The road map includes all the tracks, stations, and junctions in the railway system

    • It shows the routes that trains can take to reach different destinations

    • The road map may also include information on train schedules, stops, and connections

    • Railway companies often update their road maps to reflect changes in

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have given the interview but the response for HR has not come and they just called be back again and again but then also there is no response. Almost i have given 4round of interview then also it has not come to result.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How many types of waterproofing
  • Ans. 

    There are several types of waterproofing methods used in construction to protect buildings from water damage.

    • Membrane waterproofing

    • Cementitious waterproofing

    • Crystalline waterproofing

    • Bituminous waterproofing

    • Polyurethane liquid membrane waterproofing

  • Answered by AI
  • Q2. What is the laying process of Italian marble and what is the difference between dry and wet cladding.
  • Ans. 

    The laying process of Italian marble involves preparing the surface, applying adhesive, placing the marble, and grouting. Dry cladding involves fixing marble without water, while wet cladding involves using water during installation.

    • Prepare the surface by cleaning and leveling it

    • Apply adhesive on the back of the marble slab

    • Place the marble slab carefully on the surface

    • Grout the joints to fill in any gaps

    • Dry cladding do...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Advance India Projects Assistant Finishing Manager interview:
  • Waterproofing
  • Italian marble
  • False ceiling
  • Pannaling
  • Dry cladding
  • Wet cladding
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about your experience
  • Q2. What is the contribution that you made to the company
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Can you introduce yourself?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Share your strength
  • Ans. 

    My strength lies in my ability to analyze complex structural problems and come up with innovative solutions.

    • Strong analytical skills to identify key issues

    • Ability to think creatively to find unique solutions

    • Experience in using advanced structural analysis software

    • Effective communication skills to collaborate with team members and clients

  • Answered by AI
  • Q2. Explain how do you overcome your weakness
  • Ans. 

    I overcome my weaknesses by acknowledging them, seeking feedback, setting goals for improvement, and continuously working on them.

    • Acknowledge the weakness and accept it as a part of personal growth

    • Seek feedback from mentors, colleagues, or supervisors to gain different perspectives

    • Set specific and achievable goals for improvement

    • Develop a plan or strategy to work on the weakness consistently

    • Reflect on progress regularl

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2020.

Round 1 - HR 

(5 Questions)

  • Q1. TDS, Adjustment Entry
  • Q2. GST Output & Input Entry
  • Q3. Section of TDS 194C limit rate of dudction
  • Ans. 

    Section 194C of TDS sets the limit for deduction rates.

    • Section 194C of TDS pertains to payments to contractors/sub-contractors.

    • The current rate of TDS deduction under section 194C is 1% for individual or HUF payers and 2% for others.

    • If the payee does not provide PAN, the TDS rate under section 194C is 20%.

    • The threshold limit for TDS deduction under section 194C is Rs. 30,000 for a single payment and Rs. 1,00,000 for ag

  • Answered by AI
  • Q4. GST Input & GST output of Adjustment Entry
  • Ans. 

    GST Input & Output Adjustment Entry is used to correct errors in reporting GST liabilities and claiming input tax credits.

    • GST Input Adjustment Entry is used to correct errors in claiming input tax credits for purchases subject to GST.

    • GST Output Adjustment Entry is used to correct errors in reporting GST liabilities for sales subject to GST.

    • These adjustments are necessary to ensure accurate reporting and compliance with...

  • Answered by AI
  • Q5. Gst Input show in which side of balance sheet
  • Ans. 

    GST input is shown on the asset side of the balance sheet.

    • GST input is considered as an asset because it represents the amount of GST paid on purchases that can be claimed back.

    • It is typically shown under current assets if it is expected to be recovered within one year.

    • For example, if a company has paid $1,000 in GST on purchases, it would show as GST input $1,000 under current assets on the balance sheet.

  • Answered by AI

Saakaar Constructions Interview FAQs

How many rounds are there in Saakaar Constructions interview?
Saakaar Constructions interview process usually has 2 rounds. The most common rounds in the Saakaar Constructions interview process are Resume Shortlist and Technical.
How to prepare for Saakaar Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Saakaar Constructions. The most common topics and skills that interviewers at Saakaar Constructions expect are Residential, township, Finishing, Construction and Billing.
What are the top questions asked in Saakaar Constructions interview?

Some of the top questions asked at the Saakaar Constructions interview -

  1. What to check before starting the plas...read more
  2. Explain the waterproofing process in Toilets and their chemicals a...read more
  3. Please explain the painting work, inside and outer side b...read more

Tell us how to improve this page.

Saakaar Constructions Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
4.0
 • 1.4k Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
Shapoorji Pallonji Group Interview Questions
4.1
 • 328 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Simplex Infrastructures Interview Questions
3.3
 • 66 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Saakaar Constructions Reviews and Ratings

based on 46 reviews

3.7/5

Rating in categories

3.2

Skill development

3.5

Work-life balance

3.8

Salary

3.0

Job security

3.1

Company culture

3.2

Promotions

3.3

Work satisfaction

Explore 46 Reviews and Ratings
Senior Engineer
14 salaries
unlock blur

â‚ą4.8 L/yr - â‚ą7.2 L/yr

Senior Site Engineer
9 salaries
unlock blur

â‚ą4.2 L/yr - â‚ą8.4 L/yr

Civil Foreman
9 salaries
unlock blur

â‚ą3.4 L/yr - â‚ą4.2 L/yr

Planning Engineer
8 salaries
unlock blur

â‚ą3.9 L/yr - â‚ą8.5 L/yr

Site Engineer
7 salaries
unlock blur

â‚ą2 L/yr - â‚ą4.6 L/yr

Explore more salaries
Compare Saakaar Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview