i
Prop Solutions4u Private Limited
Filter interviews by
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Passion for helping people find their dream homes and investment opportunities.
Enjoy working with people and helping them achieve their real estate goals
Fascinated by the ever-changing market trends and opportunities
Thrilled by the challenge of negotiating deals and closing sales
Passionate about the potential for financial growth and investment in real estate
EBITDA stands for Earnings Before Interest, Taxes, Depreciation, and Amortization. It is a measure of a company's operating performance.
EBITDA is calculated by adding back interest, taxes, depreciation, and amortization to net income.
It is used to analyze and compare profitability between companies and industries.
EBITDA helps in assessing a company's ability to generate cash flow.
Investors often use EBITDA to evaluate ...
I am unable to draw the map of north Bangalore with utmost accuracy and project without the necessary tools or resources.
I do not have the necessary tools or resources to accurately draw the map of north Bangalore.
Without access to a map or satellite imagery, it would be challenging to accurately depict the area.
I recommend using online mapping tools or physical maps for accurate representation.
Pitching a project to implement a customer loyalty program for a retail store and depitching a competitor's similar program.
Propose a customer loyalty program that rewards customers for repeat purchases and referrals.
Utilize a points-based system where customers can earn points for each purchase and redeem them for discounts or free products.
Implement personalized offers and discounts based on customer shopping habits ...
To calculate the final value a customer has to pay for project Nikoo 5
Determine the initial cost of project Nikoo 5
Add any additional costs such as taxes, fees, or upgrades
Subtract any discounts or promotions
Consider any financing options or payment plans
Calculate the total amount the customer has to pay
Godrej finance plan offers customized financial solutions with flexible repayment options, while normal bank loan plan follows standard procedures and terms.
Godrej finance plan offers personalized financial solutions tailored to individual needs, while normal bank loan plan may have fixed terms and conditions.
Godrej finance plan may provide more flexible repayment options such as lower interest rates or longer repaymen...
RERA stands for Real Estate (Regulation and Development) Act, which aims to regulate the real estate sector and protect the interests of homebuyers.
RERA was enacted in 2016 to bring transparency and accountability in the real estate sector.
It mandates the registration of real estate projects and real estate agents with the regulatory authority.
RERA ensures timely completion of projects and protects buyers from unfair p...
It is combination of logical reasoning, quant, and english. Honestly it is quite tough being prepared is suggested.
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
I want to join Propsolutions4U because of their reputation for providing top-notch property management services.
Impressed by the company's track record of successful property management
Excited about the opportunity to work with a team of experienced professionals
Believe in the company's commitment to excellence and customer satisfaction
I have extensive experience in retail management, leading teams to achieve sales targets and provide excellent customer service.
Managed a team of 15 sales associates in a busy retail store
Implemented strategies to increase sales by 20% within 6 months
Resolved customer complaints and ensured high levels of customer satisfaction
Trained new staff on product knowledge and sales techniques
Top trending discussions
I applied via Campus Placement and was interviewed in Jan 2024. There were 3 interview rounds.
The communication system in a Power Substation involves various technologies and protocols to ensure efficient and reliable transmission of data.
Communication between control room and substation equipment
SCADA systems for monitoring and control
Fiber optic cables for high-speed data transmission
Protocols like DNP3, Modbus, and IEC 61850 for data exchange
Remote terminal units (RTUs) for collecting data from field devices
SLD of a Power Substation is a graphical representation of the electrical system showing how different components are connected and interact.
SLD typically includes transformers, circuit breakers, switches, relays, and other electrical equipment.
It shows the flow of electricity from the power source to the distribution lines and various loads.
Components are represented by standardized symbols and lines indicating connec...
Wave traps are devices used in electrical systems to prevent the passage of high-frequency currents while allowing the flow of power frequency currents.
Wave traps are typically used in power systems to protect equipment from high-frequency currents generated by lightning strikes or switching operations.
They work by providing a low impedance path for power frequency currents to flow through, while blocking high-frequenc...
I have a strong background in renewable energy and project management, with a passion for sustainability and innovation.
I have a degree in Environmental Science with a focus on renewable energy technologies.
I have previous experience working on solar power projects, including overseeing installation and maintenance.
I am familiar with industry regulations and standards related to solar power projects.
I have a track reco...
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jan 2024. There were 3 interview rounds.
The communication system in a Power Substation involves various technologies and protocols to ensure efficient and reliable transmission of data.
Communication between control room and substation equipment
SCADA systems for monitoring and control
Fiber optic cables for high-speed data transmission
Protocols like DNP3, Modbus, and IEC 61850 for data exchange
Remote terminal units (RTUs) for collecting data from field devices
SLD of a Power Substation is a graphical representation of the electrical system showing how different components are connected and interact.
SLD typically includes transformers, circuit breakers, switches, relays, and other electrical equipment.
It shows the flow of electricity from the power source to the distribution lines and various loads.
Components are represented by standardized symbols and lines indicating connec...
Wave traps are devices used in electrical systems to prevent the passage of high-frequency currents while allowing the flow of power frequency currents.
Wave traps are typically used in power systems to protect equipment from high-frequency currents generated by lightning strikes or switching operations.
They work by providing a low impedance path for power frequency currents to flow through, while blocking high-frequenc...
I have a strong background in renewable energy and project management, with a passion for sustainability and innovation.
I have a degree in Environmental Science with a focus on renewable energy technologies.
I have previous experience working on solar power projects, including overseeing installation and maintenance.
I am familiar with industry regulations and standards related to solar power projects.
I have a track reco...
I was interviewed before Jul 2020.
Interview experience
based on 9 reviews
Rating in categories
Assistant Sales Manager
10
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Assistant Manager
7
salaries
| ₹3.7 L/yr - ₹6.2 L/yr |
Sales Manager
6
salaries
| ₹3.5 L/yr - ₹6.3 L/yr |
Deputy Manager
4
salaries
| ₹4.8 L/yr - ₹5.8 L/yr |
Senior Manager
4
salaries
| ₹6.7 L/yr - ₹11 L/yr |
MagicBricks
99acres
CommonFloor
Square Yards