Saakaar Constructions
FinacPlus Interview Questions and Answers
Q1. What to check before starting the plaster
Before starting the plaster, it is important to check the surface for cleanliness, moisture content, and proper bonding.
Check the surface for cleanliness to ensure proper adhesion of the plaster.
Ensure the surface is free of dust, dirt, grease, and loose particles.
Check the moisture content of the surface to prevent issues with drying and cracking of the plaster.
Test the surface for proper bonding by applying a small amount of plaster and checking for adhesion.
Make sure the s...read more
Q2. Explain the waterproofing process in Toilets and their chemicals also
Waterproofing process in toilets involves applying chemicals to prevent water leakage and damage.
The first step is to clean and prepare the surface by removing any dirt, grease, or old waterproofing material.
Next, a primer is applied to ensure proper adhesion of the waterproofing membrane.
Then, a waterproofing membrane is applied to the surface. This can be in the form of liquid-applied membranes, sheet membranes, or cementitious coatings.
Finally, sealants are used to seal jo...read more
Q3. Please explain the painting work, inside and outer side both
Painting work involves applying paint to surfaces, both inside and outside of buildings.
Prepare the surface by cleaning, sanding, and priming before painting
Choose the appropriate type of paint for the surface being painted
Apply paint evenly using brushes, rollers, or sprayers
Ensure proper ventilation when painting indoors to prevent fumes
Protect surrounding areas from paint splatter with tape or drop cloths
Inspect the painted surface for any imperfections and touch up as nee...read more
Q4. How to start the Tile work
To start the Tile work, first prepare the surface, gather necessary materials and tools, plan the layout, mix the adhesive, and begin setting the tiles.
Prepare the surface by ensuring it is clean, dry, and level
Gather necessary materials such as tiles, adhesive, grout, spacers, and tools like trowels, tile cutter, and level
Plan the layout by measuring and marking guidelines on the surface
Mix the adhesive according to manufacturer's instructions
Begin setting the tiles starting...read more
Q5. What to check in the plaster
Check for cracks, consistency, smoothness, adhesion, and overall quality in plaster.
Inspect for any cracks or damage in the plaster surface.
Ensure the consistency of the plaster mixture is correct for proper application.
Check for smoothness in the finished plaster surface.
Test the adhesion of the plaster to the substrate.
Overall, assess the quality of the plaster for durability and aesthetics.
Q6. What to check in the Tile work
Check for proper alignment, level, spacing, quality of materials, and grout consistency in tile work.
Ensure tiles are aligned properly and level
Check spacing between tiles for consistency
Inspect quality of materials used for tiles
Verify grout consistency and application
Look for any cracks or chips in the tiles
Interview Process at FinacPlus
Reviews
Interviews
Salaries
Users/Month