Upload Button Icon Add office photos

Filter interviews by

Renaatus Projects MEP Engineer Interview Questions and Answers

Updated 8 Nov 2024

Renaatus Projects MEP Engineer Interview Experiences

1 interview found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 8 Nov 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Area of interest
  • Ans. 

    My area of interest is in sustainable design and energy efficiency in MEP systems.

    • Passionate about incorporating renewable energy sources into building designs

    • Experienced in optimizing HVAC systems for energy efficiency

    • Interested in utilizing smart building technologies to reduce energy consumption

    • Familiar with LEED certification requirements for sustainable building design

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Ducting types youed
  • Q2. Ducting any types of material
  • Q3. Mep for explain
  • Q4. Mep basic form housed property
  • Q5. Electrical line
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at SVPM's College Pune University, Pune and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

First round is of aptitude test in which There are four parts Quant , Verbal , Reasoning

Round 2 - Technical 

(3 Questions)

  • Q1. In Technical interview 1- Introduce yourself 2- What is MEP 3- Which skills you have 4- Basic of electrical engineering like Transformer and circuit Breaker 5- Building Codes 6- AutoCAD commands
  • Q2. About MEP And the basic about Transformer and circuit breaker
  • Q3. BUILDING codes and basic commands in AutoCAD
  • Ans. 

    Building codes and basic commands in AutoCAD are essential for MEP Engineers.

    • Building codes ensure compliance with safety and structural standards

    • Basic commands in AutoCAD include line, circle, trim, and extend

    • Understanding building codes helps in designing MEP systems efficiently

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. In Hr round again Introduce yourself
  • Q2. Strength and Week ness How was the interview process Which prodcast you have watched recently And again about family and terms and conditions about the company and that's all. Be confident about your an...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your answer if you clear the technical interview then the 90% You are selected so just be confident and motivated and the time of interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the responsibility of MEP Engineer?
  • Ans. 

    MEP Engineers are responsible for designing, coordinating, and overseeing the mechanical, electrical, and plumbing systems in buildings.

    • Designing and planning mechanical, electrical, and plumbing systems for buildings

    • Coordinating with architects, contractors, and other engineers to ensure systems are integrated properly

    • Overseeing installation and maintenance of MEP systems to ensure they meet safety and efficiency stan...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for any situation at interview board.

I applied via campus placement at Dr Mahalingam College of Engineering & Technology, Coimbatore and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 
Round 2 - One-on-one 

(1 Question)

  • Q1. Introduction,project,hoobies

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and Good in communication.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much your Salary
  • Ans. 

    My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.

    • My salary is determined by factors such as my level of experience in the field.

    • Qualifications and certifications also play a role in determining my salary.

    • Market rates for Civil Site Engineers in the specific location where I work also influence my salary.

    • I am open to discussing salary expectations

  • Answered by AI
  • Q2. When you Join, We need urgent requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - Bakwas
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me M25 ratio
  • Ans. 

    M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.

    • M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This mix is commonly used for structural concrete works like columns, beams, and slabs.

    • The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview

Renaatus Projects Interview FAQs

How many rounds are there in Renaatus Projects MEP Engineer interview?
Renaatus Projects interview process usually has 1 rounds. The most common rounds in the Renaatus Projects interview process are HR.

Tell us how to improve this page.

Renaatus Projects MEP Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
8 salaries
unlock blur

₹5.1 L/yr - ₹9 L/yr

Project Manager
8 salaries
unlock blur

₹6.6 L/yr - ₹15.3 L/yr

Junior Executive
7 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Site Engineer
7 salaries
unlock blur

₹1.7 L/yr - ₹6.1 L/yr

Inventory Executive
7 salaries
unlock blur

₹3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Renaatus Projects with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

DLF

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview