Filter interviews by
I applied via Naukri.com and was interviewed before Jul 2020. There were 4 interview rounds.
Chiller plant operation involves a process of cooling water using a refrigerant and circulating it through a closed loop system.
The chiller plant consists of a compressor, condenser, evaporator, and expansion valve.
The compressor compresses the refrigerant gas, which then flows to the condenser where it is cooled and condensed into a liquid.
The liquid refrigerant then flows to the evaporator where it absorbs heat from ...
DG sets are safe if maintained properly. They work by converting fuel into electrical energy through combustion.
DG sets should be installed in well-ventilated areas to prevent carbon monoxide poisoning.
Regular maintenance and servicing is necessary to ensure safe operation.
Proper grounding and earthing is essential to prevent electrical hazards.
DG sets should be equipped with safety features such as automatic shutdown ...
Dry transformers are safe due to their insulation system and lack of flammable liquids.
Dry transformers use solid insulation materials to prevent electrical arcing and fires.
They do not contain flammable liquids like oil-filled transformers.
Dry transformers are often used in indoor settings where fire safety is a concern.
Regular maintenance and testing is important to ensure the safety and efficiency of dry transformer
Dry type transformers are considered for safety, environmental, and maintenance reasons.
Dry type transformers are safer than oil-filled transformers as they do not pose a fire hazard.
They are also more environmentally friendly as they do not contain oil that can leak and cause pollution.
Dry type transformers require less maintenance than oil-filled transformers as they do not need oil testing or replacement.
They are al...
Fire alarm system detects fire and alerts occupants and emergency services.
Fire alarm system consists of smoke detectors, heat detectors, and manual pull stations.
When smoke or heat is detected, the alarm sounds and alerts occupants to evacuate.
The alarm also sends a signal to the monitoring station, which alerts emergency services.
Regular maintenance and testing of the system is necessary to ensure proper functioning.
The main contactor is connected first in a star delta starter.
The main contactor is connected to the three-phase power supply.
The main contactor is responsible for supplying power to the motor.
The delta contactor is then connected to the motor windings.
The star contactor is connected last to complete the circuit.
This method is used to reduce the starting current of the motor.
Chiller plant de-scaling process involves removing mineral deposits from the chiller tubes to improve efficiency.
The process involves shutting down the chiller plant and draining the water from the system.
Acidic solutions are then circulated through the chiller tubes to dissolve the mineral deposits.
After the solution has been circulated for a specific amount of time, it is drained and the chiller tubes are flushed wit...
Elevator flywheel stores kinetic energy to provide backup power during power outages.
Flywheel is connected to the elevator motor and spins continuously.
During normal operation, the flywheel stores kinetic energy.
In case of a power outage, the flywheel continues to spin and provides backup power to the elevator motor.
This allows the elevator to safely descend to the nearest floor and open its doors.
Flywheels are commonl...
To connect a LAN cable connector, follow these steps:
Identify the LAN port on your device
Insert the connector into the port until it clicks into place
Ensure the connector is securely connected by gently tugging on the cable
Repeat the process on the other end of the cable, connecting it to the router or modem
Check for a stable internet connection
Oil based transformer BDV test unit is a device used to measure the breakdown voltage of transformer oil.
BDV test unit is used to determine the quality of transformer oil.
It measures the voltage at which the oil breaks down and becomes conductive.
This test is important to ensure the proper functioning of the transformer.
The test unit applies a voltage to the oil and measures the current flow.
If the current exceeds a ce...
I appeared for an interview in Mar 2025, where I was asked the following questions.
Interested in this field and to expose my talents and knowledge.
I know that PVR company is a over all good brand.
I am actually expecting atleast 25,000 per month
PVR Inox interview questions for popular designations
I applied via Walk-in
Hhjejeirorir neurodiverse ins eu
Heir f irks rod d euro one
Get interview-ready with Top PVR Inox Interview Questions
I appeared for an interview in Sep 2024.
Handle bulk customers by ensuring efficient service, managing queues, and maintaining communication.
Implement a ticketing system to manage queues and wait times.
Train staff to efficiently handle high volumes of customers.
Maintain open communication with customers about wait times and service expectations.
Offer incentives for customers to visit during off-peak hours.
Utilize technology such as online booking systems to s
Handling problems in a cinema requires quick thinking, effective communication, and a calm demeanor.
Stay calm and assess the situation
Communicate with staff and customers to gather information
Take appropriate action to resolve the issue, such as offering refunds or vouchers
Follow up with customers to ensure satisfaction
Implement measures to prevent similar problems in the future
Calculating P&L involves subtracting total expenses from total revenue.
Calculate total revenue by adding up all sales and income generated.
Calculate total expenses by adding up all costs incurred.
Subtract total expenses from total revenue to get the profit or loss.
Formula: P&L = Total Revenue - Total Expenses
Example: Total Revenue = $10,000, Total Expenses = $8,000, P&L = $2,000
Controlling food cost involves monitoring inventory, portion control, menu engineering, and supplier negotiation.
Regularly monitor inventory levels to prevent waste and identify cost-saving opportunities.
Implement portion control measures to ensure consistent serving sizes and minimize food waste.
Utilize menu engineering techniques to highlight high-profit items and adjust pricing accordingly.
Negotiate with suppliers t...
PVR is a leading cinema exhibition company in India.
PVR stands for Priya Village Roadshow
It is the largest cinema chain in India
PVR has over 800 screens in more than 175 locations across India
They offer a premium movie-watching experience with state-of-the-art technology and amenities
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
How to make relationships with guests
I appeared for an interview in Feb 2025, where I was asked the following questions.
Top trending discussions
The duration of PVR Inox interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 216 interviews
Interview experience
based on 3.2k reviews
Rating in categories
Madurai,
Tiruchirappalli
+1₹ 2.75-3.5 LPA
Duty Manager
616
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Finance Executive
264
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Duty Officer
261
salaries
| ₹1.4 L/yr - ₹4.4 L/yr |
Assistant Manager
218
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Entertainment Service Provider
216
salaries
| ₹0.9 L/yr - ₹3.8 L/yr |
Cinépolis
HT Media
Zee Entertainment Enterprises
The Times of India