Filter interviews by
I applied via Naukri.com
We can increase the performance of the company by implementing efficient project management techniques and investing in employee training and development.
Implement efficient project management techniques
Invest in employee training and development
Encourage innovation and creativity
Streamline processes and procedures
Regularly review and evaluate performance metrics
Steel can be made strong by controlling its composition and heat treatment.
Increasing the carbon content and adding other alloying elements like manganese, chromium, and nickel can improve strength.
Heat treatment processes like quenching and tempering can also increase strength.
Proper quality control during manufacturing and testing can ensure the steel meets strength requirements.
Examples of high-strength steels inclu...
Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
SOP for basic activities at site includes inspection, testing, documentation, and reporting.
Inspection of materials and equipment
Testing of materials for quality control
Documentation of test results and findings
Reporting any deviations or non-conformities
Ensuring compliance with project specifications and standards
Psp Projects interview questions for popular designations
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
RMC PLANT DISHPECHAR
Get interview-ready with Top Psp Projects Interview Questions
I was interviewed before Jan 2024.
Resource allocation for utilities manpower and services can be costly but is essential for ensuring safety and compliance.
Allocate resources based on risk assessment and regulatory requirements
Consider outsourcing certain services to reduce costs
Implement energy efficiency measures to reduce utility expenses
Invest in training and development of in-house manpower to improve efficiency
Regularly review and optimize resour
The multiple work program in my workplace involves managing and coordinating various projects and tasks simultaneously to ensure efficiency and productivity.
Assigning priorities to different projects based on deadlines and importance
Utilizing project management tools to track progress and allocate resources
Communicating effectively with team members to ensure alignment and collaboration
Adapting to changing priorities a...
Anyone type of farmwork, structure, designer, progress and process, professional work, achivement goal, safe end of the project
SAP Hana is an in-memory database management system used for real-time data processing and analytics.
SAP Hana is a high-performance database platform developed by SAP.
It allows businesses to process large volumes of data in real-time.
SAP Hana uses in-memory computing, which means data is stored in RAM for faster access.
It supports advanced analytics, machine learning, and predictive modeling.
SAP Hana versions include S...
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.
A waist slab is a horizontal slab constructed at waist level to provide support and stability to a structure.
Waist slabs are commonly used in construction to reinforce walls or columns at waist height.
They help distribute the load evenly and prevent structural failure.
Examples include waist slabs in retaining walls or in reinforced concrete buildings.
To make stirrups for a beam 230x700 with clear cover top 25mm and bottom 40mm, follow these steps.
Calculate the total length of the beam to determine the number of stirrups needed
Determine the spacing between each stirrup based on structural requirements
Cut the stirrups to the required length and bend them to the appropriate shape
Place the stirrups at the designated locations on the beam and secure them in place
Shuttering work can be checked by inspecting the alignment, levelness, and quality of materials used.
Inspect the alignment of the shuttering to ensure it is straight and properly positioned.
Check the levelness of the shuttering to ensure it is even and at the correct height.
Examine the quality of materials used in the shuttering work to ensure they are sturdy and durable.
Ensure that the shuttering is securely fixed in ...
Concrete quantity for tread and riser can be calculated by determining the volume of each component and adding them together.
Calculate the volume of the tread by multiplying the length, width, and thickness.
Calculate the volume of the riser by multiplying the height, width, and thickness.
Add the volumes of the tread and riser to get the total concrete quantity needed.
Consider any additional factors such as wastage or r
The duration of Psp Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 84 interviews
Interview experience
based on 624 reviews
Rating in categories
Assistant Engineer
149
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited