Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Interview Questions, Process, and Tips

Updated 19 Mar 2025

Top Psp Projects Interview Questions and Answers

View all 54 questions

Psp Projects Interview Experiences

Popular Designations

51 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. 1) different between diafraam wall and retaining wall
  • Ans. 

    Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.

    • Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.

    • Retaining walls are used to hold back soil and prevent it from sliding or eroding.

    • Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.

    • Retaining walls can be made of v...

  • Answered by AI
  • Q2. Which type of material used for shuttering
  • Ans. 

    Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.

    • Plywood is the most commonly used material for shuttering due to its durability and affordability.

    • Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.

    • Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.

    • Plastic is a cost-effective option for simple construction pro...

  • Answered by AI
  • Q3. Calculate the bbs of 4 by 3m footing, d = 300mm , dia of steel = 12mm
  • Ans. 

    Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.

    • Calculate the total length of steel required

    • Determine the spacing between the bars

    • Prepare a detailed bar bending schedule

  • Answered by AI
  • Q4. Hot to calculate the quantity of concrete for trapezoidal footing
  • Ans. 

    To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.

    • Measure the length, width, and height of the trapezoidal footing

    • Calculate the area of the trapezoidal base using the formula (a+b)/2 * h

    • Calculate the volume of the trapezoidal prism using the formula area of base * height

    • Multiply the volume by the number of trapezoidal footings needed

    • Add an additi

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and tell about your experience then they ask questions from you work experience

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to prepare bbs
  • Q2. How much amount billing you have completed.

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Stone work pop paint work Timex flooring tiles waterproofing flat hand over
  • Q2. RCC PCC exwasion work Steel work
  • Q3. Honestly respect teme work

Interview Preparation Tips

Topics to prepare for Psp Projects Finishing Supervisor interview:
  • 11 years
  • 10th class
  • Networking
Interview preparation tips for other job seekers - Teams work from pm report honestly respect plaster work stone work pop paint work Timex flooring tiles waterproofing flat hand over work

Finishing Supervisor Interview Questions asked at other Companies

Q1. M30 concrete description about this
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Can you make bbs?
  • Ans. 

    Yes, I can make bbs.

    • I have experience in creating project schedules and budgets.

    • I am skilled in coordinating with team members and stakeholders.

    • I can effectively manage resources to ensure project success.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Personal details
  • Q2. Any work experience which is memorable?
  • Ans. 

    Working on a high-profile construction project with tight deadlines and complex requirements.

    • Coordinating with multiple stakeholders to ensure project milestones were met

    • Managing a team of subcontractors and ensuring quality control

    • Problem-solving on the fly to address unexpected challenges

    • Presenting project updates to senior management and clients

  • Answered by AI

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)

Psp Projects interview questions for popular designations

 Senior Engineer

 (5)

 Senior Billing Engineer

 (4)

 Assistant Engineer

 (3)

 Assistant Project Manager

 (2)

 Billing Engineer

 (2)

 Deputy Manager

 (2)

 Project Manager

 (1)

 HR Executive

 (1)

Interview experience
4
Good
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Type of Past Work Experience
  • Q2. HOW TO HANDLE PROJECT OPERATIONS
  • Ans. 

    Project operations can be handled effectively by setting clear goals, establishing timelines, assigning tasks, monitoring progress, and adapting to changes.

    • Set clear goals and objectives for the project

    • Establish timelines and deadlines for each phase of the project

    • Assign tasks and responsibilities to team members based on their skills and expertise

    • Monitor progress regularly to ensure that the project is on track

    • Adapt t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to Conduct Interview Experience Based For Future

General Manager Operations Interview Questions asked at other Companies

Q1. Can you name gypsum board makes, cost and sizes available. Which glass make and thickness used by you currently.
View answer (1)

Get interview-ready with Top Psp Projects Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)

Jobs at Psp Projects

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about your self?
Round 3 - Group Discussion 

Bocw act
Factory act
Work at height
Scaffolding standard
Others

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary negotiation

EHS Engineer Interview Questions asked at other Companies

Q1. Safety Head: Have your done any accident investigation? what are the things to check?
View answer (1)
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions regarding our branch and field work
Round 3 - HR 

(1 Question)

  • Q1. Regarding experience and salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - This is just a formal advice to everyone those who are looking for PSP project limited joining their 2 round interview will be held one is our technical round and another one is hr round.

Assistant Engineer Interview Questions asked at other Companies

Q1. 1.Define the term capacitance & inductance 2.what is Rectifier 3. What is referred to the electron in the outer orbit 4.what kind of cable used in transmission line 5.Explain Rlc circuit 6.what happen if series current is double
View answer (4)

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Shuttering area,RMC pour card etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Work culture is very tough, so if u are joining then be ready

Assistant Engineer Interview Questions asked at other Companies

Q1. 1.Define the term capacitance & inductance 2.what is Rectifier 3. What is referred to the electron in the outer orbit 4.what kind of cable used in transmission line 5.Explain Rlc circuit 6.what happen if series current is double
View answer (4)

Psp Projects Interview FAQs

How many rounds are there in Psp Projects interview?
Psp Projects interview process usually has 2-3 rounds. The most common rounds in the Psp Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Psp Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Psp Projects. The most common topics and skills that interviewers at Psp Projects expect are Scheduling, Building Construction, Cost Estimation, MSP and Planning.
What are the top questions asked in Psp Projects interview?

Some of the top questions asked at the Psp Projects interview -

  1. Tell me About EPC pattern billing, item wise Billing e...read more
  2. What's the is code for Billing, What's the extra items, what's the deduction ru...read more
  3. Tell me about finishing items bill...read more
How long is the Psp Projects interview process?

The duration of Psp Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Psp Projects Interview Process

based on 87 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all

Psp Projects Reviews and Ratings

based on 648 reviews

3.9/5

Rating in categories

3.7

Skill development

3.5

Work-life balance

3.6

Salary

3.6

Job security

3.5

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 648 Reviews and Ratings
Planning Engineer

Ahmedabad

2-7 Yrs

₹ 3-8 LPA

Executive - Accounts

Ahmedabad

2-5 Yrs

₹ 2.33724-3.96 LPA

Explore more jobs
Assistant Engineer
151 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Senior Engineer
137 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Junior Engineer
81 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Senior Civil Engineer
50 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview