I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.
Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.
Retaining walls are used to hold back soil and prevent it from sliding or eroding.
Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.
Retaining walls can be made of v...
Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.
Plywood is the most commonly used material for shuttering due to its durability and affordability.
Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.
Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.
Plastic is a cost-effective option for simple construction pro...
Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.
Calculate the total length of steel required
Determine the spacing between the bars
Prepare a detailed bar bending schedule
To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.
Measure the length, width, and height of the trapezoidal footing
Calculate the area of the trapezoidal base using the formula (a+b)/2 * h
Calculate the volume of the trapezoidal prism using the formula area of base * height
Multiply the volume by the number of trapezoidal footings needed
Add an additi
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Yes, I can make bbs.
I have experience in creating project schedules and budgets.
I am skilled in coordinating with team members and stakeholders.
I can effectively manage resources to ensure project success.
Working on a high-profile construction project with tight deadlines and complex requirements.
Coordinating with multiple stakeholders to ensure project milestones were met
Managing a team of subcontractors and ensuring quality control
Problem-solving on the fly to address unexpected challenges
Presenting project updates to senior management and clients
Psp Projects interview questions for popular designations
I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.
Project operations can be handled effectively by setting clear goals, establishing timelines, assigning tasks, monitoring progress, and adapting to changes.
Set clear goals and objectives for the project
Establish timelines and deadlines for each phase of the project
Assign tasks and responsibilities to team members based on their skills and expertise
Monitor progress regularly to ensure that the project is on track
Adapt t...
Get interview-ready with Top Psp Projects Interview Questions
I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.
EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.
EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.
It includes implementing measures to control and mitigate these risks, such as providing proper training,...
I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.
Bocw act
Factory act
Work at height
Scaffolding standard
Others
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
The duration of Psp Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 87 interviews
Interview experience
based on 648 reviews
Rating in categories
Ahmedabad
5-8 Yrs
₹ 0.5-0.8 LPA
Assistant Engineer
151
salaries
| ₹3 L/yr - ₹6 L/yr |
Senior Engineer
137
salaries
| ₹3 L/yr - ₹10 L/yr |
Junior Engineer
81
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
50
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
Senior Civil Engineer
50
salaries
| ₹4 L/yr - ₹8.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem