Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Q2. What are the methods for managing floods?
  • Q3. What is prestress concrete?
  • Q4. What is Flood Wall?

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is Total Float (TF) and Free Float(FF)?
  • Q2. What is your understanding of Earned Value Analysis (EVA)?
  • Q3. What are the key aspects to consider in delay analysis?
  • Q4. How would you rate your proficiency in P6/MSP on a scale of 1 to 10?
  • Q5. What are the different types of contracts?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 5 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Store work details
  • Q2. Store inventory
Round 2 - One-on-one 

(2 Questions)

  • Q1. Job change reason
  • Ans. 

    Seeking new challenges and opportunities for growth

    • Desire to expand skill set and knowledge in a new environment

    • Opportunity for career advancement and professional development

    • Seeking a more challenging and rewarding role

    • Interest in exploring different aspects of the industry

  • Answered by AI
  • Q2. Self growth
Round 3 - One-on-one 

(2 Questions)

  • Q1. Site job work ready
  • Q2. Guest house facility
Round 4 - One-on-one 

(2 Questions)

  • Q1. Ready work 10 hours
  • Q2. Good waking in hitech
Round 5 - One-on-one 

(2 Questions)

  • Q1. Working system is good
  • Q2. Job time is good

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in hitech in all site
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Labour rate of shuttering
  • Q2. Productivity of shuttering and Reinforcement
Round 2 - HR 

(1 Question)

  • Q1. Regarding CTC discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, as you will be asked very straightforward and practical engineering questions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via campus placement at Hooghly Engineering & Technology College, Hoogly and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

All basic quantitative aptitude.

Round 2 - Group Discussion 

Topic was "Automation creating or destroing jobs."

Round 3 - Technical 

(2 Questions)

  • Q1. Shear stress, Theory of failures, FOS, How Fusion word is related to mechanical engineering, Why we use thermodynamics,
  • Q2. Allowing elements compositions of steel and there properties,Welding technology basic data based question,
Round 4 - HR 

(1 Question)

  • Q1. Why this company over other.(this will be a bit tricky 🤔 be honest and gather some knoledge about the company). What you prefer more job security or money.(be honest)- I told job security,further they a...
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. QC procedures and experiences as Quality control inspector
  • Q2. Verified documents for previous submission and approval
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What are the details regarding different types of shuttering materials?
  • Q2. What is inventory?
  • Q3. What is the process for receiving materials?
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - One-on-one 

(10 Questions)

  • Q1. How is your previous role relevant to this?
  • Q2. Why switching to a different vertical?
  • Q3. What is LOD 300/400?
  • Q4. Dimensions of BIM?
  • Q5. What are Worksets, View Range, View template in Revit?
  • Q6. Have you worked on central file? What is the CDE in your previous organisation?
  • Q7. What are layouts in AutoCAD?
  • Q8. Layers, block attributes in Revit?
  • Q9. Experience in family creation in Revit?
  • Q10. Detail out your process of generating RFIs to the client.

Interview Preparation Tips

Interview preparation tips for other job seekers - Negotiate firmly with the HR representatives about your salary if you have successfully passed the interview and answered all questions accurately. Additionally, possessing strong prior experience is essential to obtain the salary you desire.

Overseas Infrastructure Alliance Interview FAQs

How to prepare for Overseas Infrastructure Alliance interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Overseas Infrastructure Alliance. The most common topics and skills that interviewers at Overseas Infrastructure Alliance expect are Project Management, Administrative Assistance, MIS, Project Execution and Relationship Management.

Tell us how to improve this page.

Overseas Infrastructure Alliance Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Overseas Infrastructure Alliance Reviews and Ratings

based on 29 reviews

2.6/5

Rating in categories

2.8

Skill development

2.6

Work-life balance

2.7

Salary

2.6

Job security

2.6

Company culture

2.9

Promotions

3.1

Work satisfaction

Explore 29 Reviews and Ratings
EA To Chairman

Mumbai

5-10 Yrs

Not Disclosed

Accountant with Banking Experience  

Delhi/Ncr

10-15 Yrs

₹ 5-10 LPA

Admin Executive

New Delhi

3-5 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
8 salaries
unlock blur

₹9 L/yr - ₹10 L/yr

Project Manager
8 salaries
unlock blur

₹15.5 L/yr - ₹40 L/yr

Project Engineer
5 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Project Manager
4 salaries
unlock blur

₹4 L/yr - ₹15.5 L/yr

Senior Accounts Executive
4 salaries
unlock blur

₹4.2 L/yr - ₹16.1 L/yr

Explore more salaries
Compare Overseas Infrastructure Alliance with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.5
Compare

Navayuga Engineering Company

4.0
Compare

B.L. Kashyap & Sons

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview