Orange Business
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
I want to join your organization because of its strong reputation, opportunities for growth, and alignment with my career goals.
Your organization has a strong reputation in the industry, which is appealing to me as a graduate trainee.
I am impressed by the growth opportunities your organization offers, such as training programs and mentorship.
The values and mission of your organization align with my own career goals and...
An IP address is a unique numerical identifier assigned to every device connected to the internet.
IP stands for Internet Protocol
It consists of a series of numbers separated by dots
There are two types of IP addresses: IPv4 and IPv6
IPv4 addresses are 32-bit numbers and IPv6 addresses are 128-bit numbers
Example of IPv4 address: 192.168.0.1
Example of IPv6 address: 2001:0db8:85a3:0000:0000:8a2e:0370:7334
I applied via Campus Placement and was interviewed before Aug 2022. There were 4 interview rounds.
Networking question
Orange Business interview questions for popular designations
I applied via Campus Placement and was interviewed before Jul 2022. There were 2 interview rounds.
Basic apti test. Focused on logical and reasoning questions at college placements.
Get interview-ready with Top Orange Business Interview Questions
I applied via Recruitment Consulltant and was interviewed in Sep 2021. There was 1 interview round.
Designing a datacenter involves careful planning and consideration of various factors.
Determine the purpose and requirements of the datacenter
Select appropriate hardware and software
Consider power and cooling requirements
Ensure redundancy and backup systems are in place
Plan for scalability and future growth
Ensure security measures are implemented
Test and validate the design before implementation
Prerequisites for a data center include power supply, cooling system, network connectivity, and security measures.
Sufficient power supply to support all equipment
Effective cooling system to prevent overheating
Reliable network connectivity for data transfer
Robust security measures to protect against cyber threats
Backup power source to ensure uninterrupted operation
Proper fire suppression system to prevent damage
Monitori...
IT infrastructure for Data Center
The IT infrastructure for a data center should be designed to support the needs of the organization.
It should include servers, storage, networking equipment, and power and cooling systems.
The infrastructure should be scalable and flexible to accommodate future growth and changes in technology.
Security measures should be in place to protect the data center from unauthorized access and cy...
I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
WAN stands for Wide Area Network and routing protocols are used to determine the path for data to travel in a network.
WAN is a network that spans over a large geographical area
Routing protocols are used to determine the best path for data to travel in a network
Examples of routing protocols include OSPF, BGP, and EIGRP
Data packet traffic movement refers to the flow of data packets between devices on a network.
Data packets are units of data that are transmitted over a network.
Traffic movement refers to the movement of these data packets between devices on the network.
This movement is controlled by network protocols and routing algorithms.
Examples of data packet traffic movement include sending an email, streaming a video, or download
To troubleshoot application issue from the Network proactive, follow these steps:
Check network connectivity
Verify DNS settings
Check firewall settings
Check for any recent changes made to the network or application
Use network monitoring tools to identify any issues
Check application logs for any errors or warnings
Try restarting the application or server
Contact the application vendor for support
Handling a P1 case involves immediate response and resolution to minimize impact on users.
Acknowledge the P1 case promptly and inform the user about the priority level.
Gather all necessary information from the user to understand the issue.
Escalate the case to the appropriate team or individual with the required expertise.
Provide regular updates to the user regarding the progress and estimated resolution time.
Ensure pro...
I applied via Recruitment Consultant and was interviewed in Aug 2021. There was 1 interview round.
Top trending discussions
The duration of Orange Business interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 61 interviews
Interview experience
based on 1.4k reviews
Rating in categories
Network Engineer
360
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Consultant
312
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Technical Consultant
276
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
233
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
230
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Communications
Tech Mahindra
Wipro
HCLTech