Upload Button Icon Add office photos

Filter interviews by

Nitco Production Operations Engineer Interview Questions and Answers

Updated 18 Aug 2022

Nitco Production Operations Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Work Experience in relevant field.
  • Q2. Total Experience along with Educational Qualification.
  • Q3. Experience at construction sites and understanding of drawings using AUTO CADD.
  • Ans. 

    I have experience working at construction sites and using AUTO CADD to understand drawings.

    • I have worked on several construction sites and have experience with various aspects of construction.

    • I am proficient in using AUTO CADD to read and interpret drawings.

    • I have experience collaborating with architects and engineers to ensure accurate implementation of designs.

    • I am familiar with industry standards and regulations rel...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and cool else everting is as always;
Excellent and Fabulous.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which type of pc firing
  • Ans. 

    PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.

    • PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber

    • It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production

    • Other types of firing systems include fluidized bed combustion

  • Answered by AI
  • Q2. Witch type of cooler house
  • Ans. 

    The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.

    • Cooling towers for large-scale industrial production

    • Air conditioning units for smaller production facilities

    • Evaporative coolers for energy-efficient cooling solutions

    • Refrigeration units for temperature-sensitive production processes

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Witch stage of preheater
  • Ans. 

    The preheater stage in cement production is the calciner stage.

    • The preheater typically consists of several stages including the cyclones and the calciner.

    • The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.

    • The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.

    • An example of a preheater configuration is a 4-st

  • Answered by AI
  • Q2. How much capacity
  • Ans. 

    Capacity planning is crucial for ensuring optimal production output and resource utilization.

    • Capacity planning involves assessing current production capacity and forecasting future needs.

    • Factors to consider include equipment capabilities, workforce availability, and production demand.

    • Examples of capacity planning tools include production scheduling software and simulation models.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical plant operations and job responsibilities
Round 3 - One-on-one 

(1 Question)

  • Q1. Kiln operation and your organization
  • Ans. 

    I have experience in kiln operation and have implemented efficient processes in my organization.

    • Implemented temperature monitoring system to ensure optimal kiln operation

    • Developed maintenance schedule to prevent breakdowns and minimize downtime

    • Trained staff on proper kiln operation techniques

    • Utilized data analysis to improve kiln efficiency and reduce energy consumption

  • Answered by AI
Round 4 - Unit head round 

(1 Question)

  • Q1. Plant and equipment knowledge and family background
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About heat treatment process
  • Q2. About casting process
  • Q3. Mechanical metallurgy

Interview Preparation Tips

Topics to prepare for India Cements Production Engineer interview:
  • Welding Metallurgy
Interview preparation tips for other job seekers - I am fresher and hardworker.My integrated to do any technical of job in company.Flexibility and adaptability to work in any environment.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Type of casting defect and it's solution.
  • Ans. 

    Shrinkage defect caused by improper cooling. Solution is to increase cooling rate or add risers.

    • Shrinkage defect occurs due to improper cooling causing the metal to shrink and leave voids in the casting.

    • Solution is to increase cooling rate or add risers to provide additional molten metal to compensate for the shrinkage.

    • Other types of casting defects include porosity, cold shuts, misruns, and hot tears.

    • Porosity is cause...

  • Answered by AI
  • Q2. Getting design and die devlopment .
  • Q3. Degassing process and why it's necessary.
  • Ans. 

    Degassing is the process of removing dissolved gases from liquids to prevent defects and improve product quality.

    • Dissolved gases can cause defects in products such as bubbles or porosity.

    • Degassing is commonly used in the production of metals, plastics, and electronics.

    • Methods of degassing include vacuum degassing, sparging, and membrane degassing.

    • Degassing can also improve the shelf life and taste of food and beverages...

  • Answered by AI
  • Q4. Die casting process parameters and it's calculation.
  • Ans. 

    Die casting process parameters include temperature, pressure, and cycle time.

    • Temperature: affects the fluidity of the metal and the quality of the casting.

    • Pressure: determines the filling speed and the density of the casting.

    • Cycle time: affects the productivity and the quality of the casting.

    • Calculation involves determining the optimal values for each parameter based on the specific alloy and part design.

    • Factors such a...

  • Answered by AI
  • Q5. Mejor improvement project.
  • Q6. Shrinkage defect and it's prevention process.
  • Ans. 

    Shrinkage defect is a common casting defect caused by the solidification of metal.

    • Shrinkage defect occurs when the metal solidifies and shrinks before filling the entire mold cavity.

    • It can be prevented by increasing the pouring temperature, using risers, and modifying the mold design.

    • Proper gating and venting can also help prevent shrinkage defects.

    • Examples of shrinkage defects include shrinkage porosity and shrinkage

  • Answered by AI
  • Q7. HPDC pressure and velocity calculation.
Round 3 - HR 

(1 Question)

  • Q1. Why do you want to change this job.
  • Ans. 

    Looking for new challenges and opportunities to grow professionally.

    • Seeking a more challenging role that aligns with my career goals

    • Interested in exploring new technologies and industries

    • Want to work in a more collaborative and innovative environment

    • Looking for better work-life balance and career advancement opportunities

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically sound you will crack the interview.

I applied via Naukri.com and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Production article process
  • Q2. Plastic material properties
  • Ans. 

    Plastic material properties are important for production engineers to understand.

    • Plastics can be classified as thermoplastics or thermosetting plastics.

    • Thermoplastics can be melted and reformed multiple times, while thermosetting plastics cannot.

    • Plastics have different properties such as strength, flexibility, and resistance to heat and chemicals.

    • The properties of plastics can be altered by adding fillers or additives.

    • ...

  • Answered by AI
  • Q3. How many sizes used production in machine
  • Ans. 

    The number of sizes used in production depends on the machine and the product being manufactured.

    • The number of sizes used in production varies depending on the machine and product

    • Different machines may require different sizes for production

    • The number of sizes used can be determined by analyzing the production process and the machine specifications

  • Answered by AI
  • Q4. Cutting size maintain proper

Interview Preparation Tips

Interview preparation tips for other job seekers - Machine die change also injection molding machine mould change and startup.and good quality and more Quantity production.good manpower control.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What made you think you will be employed? Ans: I have the right insights needed for the job
  • Q2. Hope you won't quit a month after being employed? Ans: No,I won't
  • Q3. What made you apply for this job? Ans: I really want to help this company grow.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always appear neat and be a reserved person.
Always work smart

I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. Tell me about process ?. Raw materials?
  • Ans. 

    Raw materials are the inputs used in a production process.

    • Raw materials are the basic components used in a production process.

    • They can be natural resources like wood, minerals, or agricultural products like wheat, cotton, etc.

    • They can also be synthetic materials like plastics, chemicals, etc.

    • The quality of raw materials affects the quality of the final product.

    • Raw materials need to be sourced, inspected, and stored pro

  • Answered by AI
  • Q3. How many workers handling?
  • Q4. Salary exceptional? Are u know hindi

Interview Preparation Tips

Interview preparation tips for other job seekers - Average..
Tell me about yourself
Tell me about process?.
Salary exception?

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Questions about casting welding and steel .
  • Q2. Questions from steel and casting
Round 2 - HR 

(1 Question)

  • Q1. About yourself and your family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest calm and try to avoid wrong answers.
Study more about technical subjects.

Interview Questionnaire 

2 Questions

  • Q1. Why do u want to leave the present company??
  • Q2. How much do u want money?

Nitco Interview FAQs

How many rounds are there in Nitco Production Operations Engineer interview?
Nitco interview process usually has 2 rounds. The most common rounds in the Nitco interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

JK Cement Interview Questions
4.1
 • 243 Interviews
ACC Interview Questions
3.9
 • 184 Interviews
Shree Cement Interview Questions
3.8
 • 149 Interviews
Ambuja Cements Interview Questions
3.9
 • 106 Interviews
Star Cement Interview Questions
4.0
 • 63 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
India Cements Interview Questions
3.9
 • 47 Interviews
View all

Nitco Production Operations Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Area Sales Manager
54 salaries
unlock blur

₹4.8 L/yr - ₹10.5 L/yr

Assistant Manager
38 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Sales Executive
36 salaries
unlock blur

₹2.8 L/yr - ₹5.5 L/yr

Regional Sales Manager
25 salaries
unlock blur

₹12 L/yr - ₹21 L/yr

Senior Sales Executive
25 salaries
unlock blur

₹3.5 L/yr - ₹6.3 L/yr

Explore more salaries
Compare Nitco with

Kajaria Ceramics

4.1
Compare

Somany Ceramics

4.2
Compare

Asian Granito India

3.7
Compare

Orient Bell

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview