Orient Cement Production Engineer Interview Questions and Answers

Updated 5 Sep 2023

Orient Cement Production Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical plant operations and job responsibilities
Round 3 - One-on-one 

(1 Question)

  • Q1. Kiln operation and your organization
  • Ans. 

    I have experience in kiln operation and have implemented efficient processes in my organization.

    • Implemented temperature monitoring system to ensure optimal kiln operation

    • Developed maintenance schedule to prevent breakdowns and minimize downtime

    • Trained staff on proper kiln operation techniques

    • Utilized data analysis to improve kiln efficiency and reduce energy consumption

  • Answered by AI
Round 4 - Unit head round 

(1 Question)

  • Q1. Plant and equipment knowledge and family background

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About heat treatment process
  • Q2. About casting process
  • Q3. Mechanical metallurgy

Interview Preparation Tips

Topics to prepare for India Cements Production Engineer interview:
  • Welding Metallurgy
Interview preparation tips for other job seekers - I am fresher and hardworker.My integrated to do any technical of job in company.Flexibility and adaptability to work in any environment.
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Kiln Operations
  • Q2. About VRM Operations
Round 2 - HR 

(2 Questions)

  • Q1. What's ur Expectations
  • Q2. When u will Join

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Come to Dalmia,Ariyalur..When u Come u Will Feel Hard....Worst Management,Worst Work Culture
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Manufacturing process
  • Q2. What is raw material
  • Ans. 

    Raw material is the basic material used in the production of goods.

    • Raw material is the primary substance or component used to manufacture products.

    • It can be natural resources like wood, metal, or minerals.

    • It can also be processed materials like chemicals or plastics.

    • Raw materials are transformed into finished products through manufacturing processes.

  • Answered by AI
  • Q3. What is clinker
  • Ans. 

    Clinker is a nodular material produced during the cement manufacturing process.

    • Clinker is a key ingredient in the production of cement.

    • It is formed by heating limestone, clay, and other materials in a kiln.

    • The cooled clinker is then ground into a fine powder to produce cement.

    • The quality of clinker greatly affects the quality of the final cement product.

  • Answered by AI
  • Q4. What is packing plant kapisity
  • Ans. 

    Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.

    • Packing plant capacity is usually measured in units per hour or units per day.

    • It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.

    • Factors that can affect packing plant capacity include equipment efficiency, productio

  • Answered by AI
  • Q5. What is coal mill kapisity
  • Ans. 

    Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.

    • Coal mill capacity is typically measured in tons per hour or tons per day.

    • It is important for production engineers to optimize coal mill capacity to meet production demands.

    • Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.

    • Increasing coal mill capacity can invol...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is ball mill
  • Ans. 

    A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.

    • Consists of a hollow cylindrical shell rotating about its axis

    • The axis of the shell may be horizontal or at a small angle to the horizontal

    • The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber

    • The inner surface o...

  • Answered by AI
  • Q2. What is raw mill
  • Ans. 

    Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.

    • Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.

    • The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.

    • Common types of raw mills include ball mills, ro...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement Production Engineer interview:
  • Production Engineering
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Process parameters
  • Q2. Manufacturing process cement
Round 3 - Technical 

(2 Questions)

  • Q1. CCR OPERATION in cement plant
  • Ans. 

    CCR operation in a cement plant involves monitoring and controlling the process parameters to ensure efficient production.

    • CCR stands for Central Control Room, where operators monitor and control the entire cement production process.

    • Operators in the CCR are responsible for adjusting process parameters such as kiln feed, fuel consumption, and raw material composition.

    • Efficient CCR operation is crucial for maintaining qua...

  • Answered by AI
  • Q2. Plant optimization in cement plant
  • Ans. 

    Plant optimization in cement plant involves improving efficiency, reducing costs, and maximizing output.

    • Implementing advanced process control systems to optimize production

    • Regularly monitoring equipment performance and conducting maintenance to prevent breakdowns

    • Utilizing alternative fuels and raw materials to reduce energy consumption

    • Optimizing the use of additives to improve cement quality and reduce clinker usage

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Good training provided and course designed as per plant requirements.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical manufacturing process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How you beneficial to our organisation ?
  • Q2. What is your previous company achievement?
Round 3 - HR 

(2 Questions)

  • Q1. Why you switch your current organisation?
  • Q2. What is your acceptance salary

I applied via Company Website and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Diplom cement technology, cement is a most useful resource.

Round 3 - Technical 

(3 Questions)

  • Q1. 1. Cement manufacturing process .
  • Ans. Crossing, screening, stacking,reclaiming,grounding,free heating,burning,cooling,grainding,add materials prosentes.
  • Answered Anonymously
  • Q2. 2. Cement Row materials
  • Q3. Raw mill vrm boll mill
  • Ans. Grinding unit vrm speed and rpm , boll mill speed
  • Answered Anonymously
Round 4 - Group Discussion 

Vrm rpm speed 20-25 and boll mill rpm speed 25-27

Interview Preparation Tips

Topics to prepare for JK Cement Production Engineer interview:
  • Diploma in Cement technology
Interview preparation tips for other job seekers - Please find the attechment of resume of diploma in cement technology.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry

Orient Cement Interview FAQs

How many rounds are there in Orient Cement Production Engineer interview?
Orient Cement interview process usually has 4 rounds. The most common rounds in the Orient Cement interview process are Resume Shortlist, Technical and One-on-one Round.
What are the top questions asked in Orient Cement Production Engineer interview?

Some of the top questions asked at the Orient Cement Production Engineer interview -

  1. Kiln operation and your organizat...read more
  2. Technical plant operations and job responsibilit...read more

Tell us how to improve this page.

Orient Cement Production Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Orient Cement Production Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.0

Salary

4.0

Job security

3.9

Company culture

4.0

Promotions

3.9

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
115 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Sales Officer
76 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Area Sales Manager
75 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
50 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Orient Cement with

UltraTech Cement

4.2
Compare

ACC

3.9
Compare

Ambuja Cements

3.9
Compare

Shree Cement

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview