I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Apr 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
BBS in construction stands for Bar Bending Schedule.
BBS is a document that provides details about the reinforcement steel bars used in a construction project.
It includes information about the size, shape, quantity, and placement of the bars.
BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.
Example: BBS for a column may spec...
Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.
M 25 mix ratio is commonly used in construction for structural applications.
The mix ratio represents the proportions of different materials used in the concrete mix.
For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...
The number of zones in a u grider varies depending on the specific design and requirements.
The number of zones in a u grider can range from 1 to multiple zones.
Zones are typically created to divide the grider into sections for better load distribution and structural stability.
The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...
To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.
Determine the total area of the site
Calculate the area of zone A by subtracting the combined area of zones B and C from the total area
Calculate the area of zone B using the given dimension
Calculate the area of zone C by subtracting the area of zone B from the total area
Ensure the units of measurement are consistent
Working at heights requires proper safety measures and equipment.
Use appropriate safety harnesses and fall protection systems.
Ensure scaffolding and ladders are secure and stable.
Follow safety guidelines and regulations.
Provide proper training to workers on working at heights.
Regularly inspect and maintain equipment and tools.
Implement safety barriers and guardrails.
Use aerial lifts or platforms for safe access to elev...
I behave as a civil engineer by being professional, organized, and detail-oriented.
I maintain a professional demeanor at all times, treating colleagues and clients with respect.
I am organized in my work, keeping track of project timelines, budgets, and resources.
I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.
I communicate effectively with team members, subcontractors, and...
I applied via Walk-in and was interviewed before Feb 2023. There were 6 interview rounds.
Any questions asking related civil construction
Behavior is must be staff & company
Safety related questions
posted on 28 Apr 2022
I was interviewed in Oct 2021.
posted on 10 Mar 2021
I applied via Job Portal
Junior Engineer
870
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
799
salaries
| ₹3 L/yr - ₹9 L/yr |
Junior Engineer Civil
459
salaries
| ₹1.8 L/yr - ₹6.5 L/yr |
Senior Engineer
358
salaries
| ₹4 L/yr - ₹11 L/yr |
Civil Site Engineer
258
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys