Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Shuttering Foreman Interview Questions and Answers

Updated 22 Mar 2021

KEC International Shuttering Foreman Interview Experiences

1 interview found

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide jack lapping in cuplock system...
  • Ans. 

    The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.

    • To determine the number of manpower required, consider the efficiency and productivity of the workers.

    • Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.

    • For example, if each worker can cover 50 sqmt per day, then 1...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Working with different methods
  • Q2. Civil construction work
Round 2 - Group Discussion 

About the work at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil construction work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experience
  • Q2. Which work completed in your supervision

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your work knowledge
Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Site supervisor
  • Q2. Manpower handling, lobur salary preparation and calculation progress montering
  • Q3. Working location
  • Q4. Mechanical civil work
  • Q5. No ather cuntry

Interview Preparation Tips

Interview preparation tips for other job seekers - Naukari.com
Live job MAHSR c-3 sec-2
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is full form of SBC
  • Q2. Density of concrete
Round 2 - Technical 

(1 Question)

  • Q1. Diameter of TBM
Round 3 - HR 

(1 Question)

  • Q1. Tell me something about yourself
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Aptitude Test 

Survey
Auto Level, Total Stesan, DGPS

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Total station error distribution in GPS to GPS
  • Ans. 

    Total station errors can affect GPS to GPS measurements due to various factors.

    • Total station errors can include instrument calibration errors, atmospheric conditions, and human error.

    • Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.

    • Regular calibration and maintenance of the total station can

  • Answered by AI
  • Q2. Coordinates kaise nikalte hai CAD se
  • Q3. Auto level arre distribution
Round 3 - HR 

(2 Questions)

  • Q1. Selery discussion
  • Q2. Which company working

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company working
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. I need this job very much
  • Q2. I need this job very very much
  • Q3. This job very goods
  • Q4. I have a lot of work experience
  • Q5. I love this job

Interview Preparation Tips

Interview preparation tips for other job seekers - Supervisor
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation

Tell us how to improve this page.

KEC International Shuttering Foreman Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 735 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Thermax Limited Interview Questions
4.2
 • 246 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all

KEC International Shuttering Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
656 salaries
unlock blur

₹5.2 L/yr - ₹18.7 L/yr

Senior Engineer
437 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
222 salaries
unlock blur

₹1 L/yr - ₹8.9 L/yr

Project Engineer
212 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Project Manager
199 salaries
unlock blur

₹10.2 L/yr - ₹43 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview