Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Shuttering Foreman Interview Questions and Answers

Updated 24 Feb 2025

KEC International Shuttering Foreman Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What types of materials are used in construction work, and what is the method of statement for their application?
  • Ans. 

    Various materials such as concrete, steel, wood, and formwork are used in construction work, each requiring specific methods of application.

    • Concrete: used for foundations, slabs, and columns. Method of statement includes mixing, pouring, and curing.

    • Steel: used for reinforcement in concrete structures. Method of statement includes cutting, bending, and tying.

    • Wood: used for formwork and framing. Method of statement inclu...

  • Answered by AI
  • Q2. What is the slab cycle and how does it relate to turnaround time?
  • Ans. 

    The slab cycle refers to the time it takes to complete the process of pouring, curing, and removing concrete slabs, which directly impacts the overall turnaround time of a construction project.

    • The slab cycle includes activities such as formwork preparation, concrete pouring, curing, and stripping of formwork.

    • Efficient coordination and scheduling of these activities can help minimize the slab cycle time.

    • Shortening the s...

  • Answered by AI

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide jack lapping in cuplock system...
  • Ans. 

    The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.

    • To determine the number of manpower required, consider the efficiency and productivity of the workers.

    • Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.

    • For example, if each worker can cover 50 sqmt per day, then 1...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Shuttering Foreman Interview Questions Asked at Other Companies

Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. Ho ... read more
Q2. What types of materials are used in construction work, and what i ... read more
Q3. What is the slab cycle and how does it relate to turnaround time?
Q4. How do material segregation
Q5. How do work for shuttering

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - What you know told boldly and answer with smile

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Salary discussion and some professional questions.
  • Q2. Technical realated your stream

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T is good organization for learning and self growth purpose.good employee welfare.

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

KEC International Interview FAQs

How many rounds are there in KEC International Shuttering Foreman interview?
KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are One-on-one Round.
What are the top questions asked in KEC International Shuttering Foreman interview?

Some of the top questions asked at the KEC International Shuttering Foreman interview -

  1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  2. What types of materials are used in construction work, and what is the method o...read more
  3. What is the slab cycle and how does it relate to turnaround ti...read more

Tell us how to improve this page.

KEC International Shuttering Foreman Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 446 Interviews
Dilip Buildcon Interview Questions
4.0
 • 145 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

KEC International Shuttering Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
659 salaries
unlock blur

₹5.2 L/yr - ₹21.9 L/yr

Senior Engineer
449 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Civil Engineer
221 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Safety Officer
191 salaries
unlock blur

₹1.8 L/yr - ₹8 L/yr

Project Manager
186 salaries
unlock blur

₹10.9 L/yr - ₹40 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview