Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

KEC International Shuttering Foreman Interview Questions and Answers

Updated 24 Feb 2025

KEC International Shuttering Foreman Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What types of materials are used in construction work, and what is the method of statement for their application?
  • Ans. 

    Various materials such as concrete, steel, wood, and formwork are used in construction work, each requiring specific methods of application.

    • Concrete: used for foundations, slabs, and columns. Method of statement includes mixing, pouring, and curing.

    • Steel: used for reinforcement in concrete structures. Method of statement includes cutting, bending, and tying.

    • Wood: used for formwork and framing. Method of statement inclu...

  • Answered by AI
  • Q2. What is the slab cycle and how does it relate to turnaround time?
  • Ans. 

    The slab cycle refers to the time it takes to complete the process of pouring, curing, and removing concrete slabs, which directly impacts the overall turnaround time of a construction project.

    • The slab cycle includes activities such as formwork preparation, concrete pouring, curing, and stripping of formwork.

    • Efficient coordination and scheduling of these activities can help minimize the slab cycle time.

    • Shortening the s...

  • Answered by AI

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide jack lapping in cuplock system...
  • Ans. 

    The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.

    • To determine the number of manpower required, consider the efficiency and productivity of the workers.

    • Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.

    • For example, if each worker can cover 50 sqmt per day, then 1...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Shuttering Foreman Interview Questions Asked at Other Companies

Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. Ho ... read more
Q2. What types of materials are used in construction work, and what i ... read more
Q3. What is the slab cycle and how does it relate to turnaround time?
Q4. How do material segregation
Q5. How do work for shuttering

Interview questions from similar companies

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All about Execution work.
  • Q2. Long answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patience and effort for you.

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Contribute & help others!
anonymous
You can choose to be anonymous

KEC International Interview FAQs

How many rounds are there in KEC International Shuttering Foreman interview?
KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are One-on-one Round.
What are the top questions asked in KEC International Shuttering Foreman interview?

Some of the top questions asked at the KEC International Shuttering Foreman interview -

  1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  2. What types of materials are used in construction work, and what is the method o...read more
  3. What is the slab cycle and how does it relate to turnaround ti...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Sterling & Wilson

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

Tata Technologies

No Interviews

JOBS

Creativve Constructiions

No Jobs

INTERVIEWS

Sterling & Wilson

No Interviews

INTERVIEWS

KEC International

No Interviews

Tell us how to improve this page.

KEC International Shuttering Foreman Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 741 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
Siemens Interview Questions
4.1
 • 416 Interviews
Thermax Limited Interview Questions
4.1
 • 250 Interviews
ABB Interview Questions
4.1
 • 233 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all

KEC International Shuttering Foreman Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
661 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
430 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
216 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
212 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
211 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview