Upload Button Icon Add office photos

Filter interviews by

MV Omni Projects India Interview Questions and Answers

Updated 26 Feb 2023

MV Omni Projects India Interview Experiences

1 interview found

Site Incharge -Civil Engineering Interview Questions & Answers

user image Anonymous

posted on 26 Feb 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. My self civil work questions
  • Q2. How to work Plastar & flooring work
  • Ans. 

    Plastering and flooring work require proper planning, preparation, and execution.

    • Plastering involves applying a layer of cement or gypsum-based material to walls and ceilings to create a smooth surface.

    • Flooring work involves laying tiles, marble, or other materials on the floor to create a durable and aesthetically pleasing surface.

    • Before starting the work, ensure that the surface is clean, dry, and free of any debris.

    • ...

  • Answered by AI
  • Q3. How manage store management OUR CIVIL PROJECT'S WORK
  • Ans. 

    Store management for civil projects involves proper inventory control and documentation.

    • Maintain a detailed inventory of all materials and equipment used on the project

    • Implement a system for tracking the movement of materials in and out of the store

    • Ensure that all materials are stored in a safe and secure manner

    • Regularly update documentation to reflect changes in inventory and usage

    • Coordinate with procurement team to e...

  • Answered by AI
  • Q4. Technically How much workings FR SLAB CASTING COLUMN & BEAM WORK
  • Ans. 

    FR slab casting, column and beam work involve various technical aspects in civil engineering.

    • FR slab casting requires proper formwork, reinforcement, and concrete mix design.

    • Column work involves proper alignment, formwork, and reinforcement placement.

    • Beam work requires proper formwork, reinforcement, and concrete pouring techniques.

    • All three require proper curing and quality control measures.

    • Technical knowledge of stru...

  • Answered by AI
  • Q5. What is BBc How to still contity
  • Ans. 

    BBc is not a known term in civil engineering. Unable to answer the question.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Excellent TO EXTRAORDINARY FREEDOM.ATMOSPEYARS MAXIMUM REFRANCE FR OTHER FRIENDS & FAMILY MEMBER'S

    Interview questions from similar companies

    I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.

    Round 1 - Technical 

    (6 Questions)

    • Q1. First of all you should be experienced, minimum of 2 years of experience is required for this position for a good salary.
    • Q2. Prepare yourself with a good knowledge of invoice, important thing which should be mentioned in invoice. Learn what is unbilled and accrual accounting and data. Gold rules of accounting. Credit note and ty...
    • Q3. What is unbilled data or accrual data? Why it important to clear unbilled data?
    • Ans. 

      Unbilled data or accrual data refers to revenue that has been earned but not yet billed to the customer.

      • Unbilled data is a common term used in accounting to describe revenue that has been recognized but not yet invoiced.

      • Accrual data refers to expenses that have been incurred but not yet recorded in the accounting system.

      • Clearing unbilled data is important to ensure accurate financial reporting and to prevent revenue le...

    • Answered by AI
    • Q4. What is cash forecast and what are the golden rules of accounting?
    • Ans. 

      Cash forecast is a projection of future cash inflows and outflows. Golden rules of accounting are basic principles to maintain accurate financial records.

      • Cash forecast helps in managing cash flow and planning for future expenses.

      • Golden rules of accounting are: debit the receiver, credit the giver; debit what comes in, credit what goes out; and debit expenses and losses, credit income and gains.

      • These rules ensure accura...

    • Answered by AI
    • Q5. What is a credit note, why do we use credit notes any five points in invoice where we have to use credit notes?
    • Ans. 

      A credit note is a document issued by a seller to a buyer, indicating that a certain amount has been credited back to the buyer's account.

      • Credit notes are used to correct errors in invoices.

      • They are also used to adjust the amount owed by a customer.

      • Credit notes can be issued for returned goods or cancelled services.

      • They can also be used to give a discount or refund to a customer.

      • Credit notes are important for maintaini

    • Answered by AI
    • Q6. What is a payment term and what is a credit period?
    • Ans. 

      Payment term is the time period within which a customer is required to pay for goods or services. Credit period is the time period for which a customer is allowed to delay payment.

      • Payment term is agreed upon by the seller and buyer during a transaction.

      • It can be expressed in days, weeks, or months.

      • For example, a payment term of 30 days means the customer must pay within 30 days of receiving the invoice.

      • Credit period is...

    • Answered by AI
    Round 2 - Behavioral 

    (2 Questions)

    • Q1. Introduce yourself, tell something about your profile in your organisation.
    • Q2. Why do you want to leave your current company and why do you want to join Wood groups?

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Read resume repair yourself as per your resume. With all the questions.

    Offshore Structural Designer Interview Questions & Answers

    Worley user image siva vijay kumar desetti

    posted on 12 Sep 2021

    Interview experience
    4
    Good
    Difficulty level
    Moderate
    Process Duration
    2-4 weeks
    Result
    Selected Selected

    I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.

    Interview Questionnaire 

    1 Question

    • Q1. E3D, Offshore structures

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Strong in technical knowledge

    I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (1 Question)

    • Q1. PSC girder design, BBS

    Interview Preparation Tips

    Interview preparation tips for other job seekers - One of the Best company for future, Ask high salary

    Interview Questionnaire 

    11 Questions

    • Q1. Introduce Yourselves.
    • Q2. What projects are you working on?
    • Q3. Questions related to past projects - Which projects did you work on? What were you responsibilities? How many Engineers & CAD technicians did you manage?
    • Q4. Explain the organization chart at your current work place?
    • Q5. Are you a Professional/Chartered Engineer? Current Status?
    • Q6. Geometric Departures, Design Considerations, Client Requirements, Mitigation of superelevation spillover at reverse curves (if horizontal alignment is fixed), etc.
    • Q7. BIM Application in Highway Models?
    • Ans. 

      BIM application in highway models involves creating a digital representation of the road and its infrastructure.

      • BIM can be used to design and visualize highway projects

      • It allows for collaboration between different stakeholders

      • BIM can help with clash detection and reduce errors in construction

      • It can also be used for maintenance and asset management

      • Examples include the use of BIM in the construction of the M25 motorway i

    • Answered by AI
    • Q8. How do you review/check work of an originator in Civil3D Models?
    • Ans. 

      I review/check work of an originator in Civil3D Models by following a systematic approach.

      • I check for errors and inconsistencies in the model.

      • I verify that the model adheres to the project standards and specifications.

      • I ensure that the model is accurate and complete.

      • I communicate with the originator to clarify any issues or concerns.

      • I document any changes or revisions made to the model.

      • I perform a final review before s

    • Answered by AI
    • Q9. Roundabout Parameters and values for urban and rural roundabouts
    • Ans. 

      Roundabout parameters and values vary based on urban and rural settings.

      • Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.

      • Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.

      • Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.

      • Roundabout parameters may include lane widths, splitter island wid...

    • Answered by AI
    • Q10. What input is required in ARCADY and PICADY software?
    • Ans. 

      ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.

      • Road geometry data such as lane widths, radii, and gradients

      • Traffic flow data such as traffic volume, speed, and composition

      • Vehicle characteristics such as dimensions, speed, and acceleration

      • Other inputs such as signal timings and pedestrian crossings

    • Answered by AI
    • Q11. What are your capabilities in Civil3D?
    • Ans. 

      I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.

      • Expertise in creating and editing surfaces, alignments, profiles, and corridors

      • Ability to generate 3D models and perform earthwork calculations

      • Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs

      • Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow

      • Proficie...

    • Answered by AI

    I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

    Interview Questionnaire 

    11 Questions

    • Q1. How many years of experience?
    • Q2. Total experience about Water Supply Project out of 13years
    • Q3. Do you work in Consultancy firm & ask about of company ?
    • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
    • Answered Anonymously
    • Q4. Asked about inspection that how to check quality of work ?
    • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
    • Answered Anonymously
    • Q5. If contractors not compliance spec. Then what do you want or take action against.
    • Ans. 

      Take appropriate action against contractors not complying with specifications.

      • Identify the specific non-compliance issues

      • Communicate the non-compliance to the contractors

      • Request corrective actions or modifications to meet the specifications

      • Monitor and document the progress of corrective actions

      • Consider penalties or contract termination if non-compliance persists

    • Answered by AI
    • Q6. Asked about NCR full form
    • Ans. Non conformance Report or Non conformity reports
    • Answered Anonymously
    • Q7. Asked describe about NCR
    • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
    • Answered Anonymously
    • Q8. Asked about preparation of financial & physical progress
    • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
    • Answered Anonymously
    • Q9. What is your CURRENT CTC & expected? Asked by HR.
    • Ans. Replied my ctc & want 30%hike
    • Answered Anonymously
    • Q10. Asked about working location
    • Q11. Asked about corrent CTC & expected
    • Ans. CTC +30%hike.then finally I have selected.
    • Answered Anonymously

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.

    ABCI infrastructure Pvt ltd Interview Questions & Answers

    ABCI Infrastructures user image Anonymous

    posted on 24 Jul 2021

    Interview Questionnaire 

    4 Questions

    • Q1. Salary increment purpose
    • Q2. I join ABCI infrastructure Pvt ltd Charanbanda project NH94 2year continued salary increment
    • Q3. Structural engineer culvert Bridge construction Building construction structure interested
    • Q4. I am joining your team working management system site purpose

    Civil Foreman Interview Questions & Answers

    Bechtel user image Balbir Singh Singh

    posted on 15 Feb 2022

    I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
    View all tips
    Round 2 - Group Discussion 
    Pro Tip by AmbitionBox:
    Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
    View all tips

    Interview Preparation Tips

    Topics to prepare for Bechtel Civil Foreman interview:
    • Communication Skills
    Interview preparation tips for other job seekers - Good team proper material management work under program or safety first

    I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.

    Interview Questionnaire 

    3 Questions

    • Q1. Product knowledge
    • Q2. Sales improve ment
    • Q3. Customer relationship

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Lukly the most of the answer correctly

    Senior Designer Bim Interview Questions & Answers

    AECOM user image Anonymous

    posted on 10 Feb 2021

    Interview Questionnaire 

    2 Questions

    • Q1. Why do you want to join Aecom.
    • Q2. What kind of projects have you done? And what is the probem face of them. And how to resolve.

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Aecom is a big name in the engineering field, here we will get a lot to learn so that our future will grow well. Tell the truth about what you know or else you will face problems. Because next you have to do all the work yourself. Because of the high work load, no one can help you much. I worked at Aecom for seven years. I have learned a lot there. Salary always comes on time. Due to pendamic we had to leave the job due to lack of work. But the Aecom company had done our full and final settelement within a month. Aecom is a very good company. If I get a chance to work in the company again, I would definitely like to join. Workload is very high. Deadline is very less, which affects its quality of work.

    MV Omni Projects India Interview FAQs

    How many rounds are there in MV Omni Projects India interview?
    MV Omni Projects India interview process usually has 2 rounds. The most common rounds in the MV Omni Projects India interview process are Resume Shortlist and HR.
    What are the top questions asked in MV Omni Projects India interview?

    Some of the top questions asked at the MV Omni Projects India interview -

    1. Technically How much workings FR SLAB CASTING COLUMN & BEAM W...read more
    2. How manage store management OUR CIVIL PROJECT'S W...read more
    3. How to work Plastar & flooring w...read more

    Tell us how to improve this page.

    Interview Questions from Similar Companies

    Tata Technologies Interview Questions
    3.7
     • 251 Interviews
    TCE Interview Questions
    3.8
     • 240 Interviews
    Saint-Gobain Interview Questions
    4.0
     • 170 Interviews
    Apco Infratech Interview Questions
    3.8
     • 111 Interviews
    AECOM Interview Questions
    4.3
     • 109 Interviews
    Worley Interview Questions
    4.1
     • 107 Interviews
    View all

    MV Omni Projects India Reviews and Ratings

    based on 22 reviews

    4.8/5

    Rating in categories

    4.5

    Skill development

    4.0

    Work-Life balance

    3.9

    Salary & Benefits

    4.0

    Job Security

    4.3

    Company culture

    4.3

    Promotions/Appraisal

    4.7

    Work Satisfaction

    Explore 22 Reviews and Ratings
    Assistant Manager
    5 salaries
    unlock blur

    ₹4.2 L/yr - ₹4.2 L/yr

    Junior Engineer Civil
    4 salaries
    unlock blur

    ₹2.2 L/yr - ₹5.4 L/yr

    Project Manager
    3 salaries
    unlock blur

    ₹5.5 L/yr - ₹6 L/yr

    Accountant
    3 salaries
    unlock blur

    ₹4 L/yr - ₹6.5 L/yr

    Assistant Engineer
    3 salaries
    unlock blur

    ₹2.4 L/yr - ₹3.4 L/yr

    Explore more salaries
    Compare MV Omni Projects India with

    Megha Engineering & Infrastructures

    3.9
    Compare

    Shapoorji Pallonji Group

    4.2
    Compare

    Alstom Transportation

    3.7
    Compare

    Tata Technologies

    3.7
    Compare

    Calculate your in-hand salary

    Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
    Did you find this page helpful?
    Yes No
    write
    Share an Interview