I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
Rail tracks are installed through a process involving surveying, grading, laying ballast, placing sleepers, and attaching rails.
Surveying is done to determine the alignment and elevation of the track.
Grading involves preparing the ground by removing vegetation and leveling the surface.
Ballast, typically made of crushed stone, is laid to provide stability and drainage.
Sleepers, also known as ties, are placed on the ball...
Track density refers to the number of tracks per unit length on a railway main track.
Track density is an important factor in determining the capacity and efficiency of a railway system.
It is usually measured in terms of tracks per kilometer or mile.
Higher track density allows for more trains to operate simultaneously, increasing the system's capacity.
Track density can vary depending on the type of railway line, such as...
The rail height for a 60kg rail and the size of ballast used in the track.
The rail height for a 60kg rail is typically around 170mm.
The size of ballast used in the track depends on various factors such as the type of track, soil conditions, and design specifications.
Common ballast sizes range from 20mm to 50mm in diameter.
The ballast should be well-graded and free from dust and fines to provide stability and drainage.
P...
Top trending discussions
based on 4 reviews
Rating in categories
Assistant Manager
123
salaries
| ₹3.8 L/yr - ₹10.5 L/yr |
Senior Engineer
68
salaries
| ₹4.5 L/yr - ₹8 L/yr |
Assistant Engineer
51
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Sales Executive
38
salaries
| ₹0.9 L/yr - ₹4.5 L/yr |
Store Manager
37
salaries
| ₹1.4 L/yr - ₹5.2 L/yr |
Raymond Lifestyle Limited
Arvind Group
Aditya Birla Fashion and Retail
Vardhman Fabrics