Filter interviews by
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
Top trending discussions
posted on 7 Dec 2023
I applied via Campus Placement and was interviewed in Nov 2023. There were 4 interview rounds.
There are 8 candidates in my gd round. Topic was given by recruiter was emerging technology. I have successfully done my gd round.
posted on 2 Jan 2024
I applied via Referral and was interviewed in Jul 2023. There were 4 interview rounds.
Reasoning and aptitude
Design mix of concrete refers to the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.
Design mix involves selecting the type and quality of materials such as cement, aggregates, and water.
Proportions of each material are determined based on the desired strength, workability, and durability of the concrete.
Factors like environmental conditions, const...
The number of limit switches in a tower crane varies depending on the specific model and manufacturer.
The number of limit switches in a tower crane can range from 2 to 6 or more.
Limit switches are used to prevent the crane from overtraveling in certain directions or reaching unsafe positions.
Common types of limit switches in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switche
posted on 1 Sep 2022
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 3 interview rounds.
Delays in construction projects can be caused by various factors.
Weather conditions, such as heavy rain or extreme temperatures, can slow down construction progress.
Unforeseen site conditions, such as encountering unexpected underground utilities or poor soil quality, may require additional time for resolution.
Supply chain issues, including delays in material delivery or shortages, can impact project timelines.
Changes ...
I track progress of projects by setting clear goals, using project management tools, and regularly communicating with team members.
Set clear goals and objectives for the project
Break down the project into smaller tasks and milestones
Use project management tools such as Gantt charts or Kanban boards to track progress
Regularly communicate with team members to get updates on their tasks
Hold regular meetings or check-ins t...
As an Assistant Manager, I perform a variety of tasks on a daily basis to ensure smooth operations and support the manager.
Overseeing daily operations and ensuring compliance with company policies
Managing and supervising staff, including scheduling and training
Assisting with customer service and resolving any issues or complaints
Monitoring inventory levels and placing orders as needed
Analyzing sales data and implementi...
I manage stakeholders by identifying their needs, communicating effectively, and building strong relationships.
Identify key stakeholders and their needs
Communicate regularly and effectively with stakeholders
Build strong relationships through trust and transparency
Address concerns and conflicts in a timely and respectful manner
Collaborate with stakeholders to achieve common goals
Provide regular updates and progress repo...
I have worked on various projects including team management, process improvement, and customer satisfaction.
Led a team of 10 employees to successfully implement a new inventory management system, resulting in a 20% reduction in stockouts.
Developed and executed a customer feedback program, resulting in a 15% increase in overall customer satisfaction.
Implemented a process improvement initiative that reduced production ti...
I am a highly motivated and experienced professional with a strong background in management and leadership.
I have over 5 years of experience in supervisory roles, where I successfully led teams and achieved targets.
I am skilled in strategic planning, problem-solving, and decision-making.
I have a proven track record of improving operational efficiency and customer satisfaction.
I am adept at building and maintaining stro...
I am currently responsible for managing a team and overseeing daily operations.
Managing a team of employees
Overseeing daily operations and ensuring smooth workflow
Setting goals and targets for the team
Monitoring performance and providing feedback
Handling customer complaints and resolving issues
Creating work schedules and assigning tasks
Training new employees and conducting performance evaluations
I am currently earning $50,000 per year and my salary expectations for the Assistant Manager position are in the range of $60,000 to $70,000 per year.
My current salary is $50,000 per year.
I am looking for a salary in the range of $60,000 to $70,000 per year for the Assistant Manager position.
I believe my skills and experience justify this salary expectation.
My notice period is 30 days.
I have a notice period of 30 days.
I am required to give a 30-day notice before leaving my current position.
I am contractually obligated to provide a 30-day notice period.
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
To prepare the grns, ensure proper receiving procedures are followed. To maintain store activity, focus on inventory management, staff training, and customer service.
Implement a system for receiving and inspecting goods to ensure quality and accuracy
Regularly check inventory levels and reorder products as needed to prevent stockouts
Train staff on proper store procedures, customer service, and product knowledge
Monitor s...
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
To solve construction problems, quality, safety, progress, and time schedule, a project manager should prioritize communication, risk management, and continuous improvement.
Establish clear communication channels with all stakeholders
Identify potential risks and develop contingency plans
Regularly review and improve quality control processes
Ensure compliance with safety regulations and provide training to workers
Monitor
I applied via campus placement at KJ's Educational Institute Trinity Institute of Management and Research, Pune and was interviewed in Mar 2022. There were 3 interview rounds.
Pre and post pendamic
Yes, I am ready to locate and work on various civil engineering projects.
I am experienced in using GPS technology for site surveys and mapping.
I am familiar with reading and interpreting blueprints and construction plans.
I have knowledge of local building codes and regulations.
I am prepared to travel to different project sites as needed.
I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.
I am manikandan diploma civil in 5 years experience sir
based on 5 reviews
Rating in categories
JLL
CBRE
Square Yards
NoBroker