Cost control in construction activities through effective management of major items
Develop a detailed cost estimate for the project
Monitor and track actual costs against the estimate
Identify major cost drivers and implement cost-saving measures
Regularly review and update the project budget
Ensure effective communication and collaboration between all stakeholders
Use technology and software to streamline cost control proc...
Top trending discussions
posted on 1 Mar 2023
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 14 Feb 2023
posted on 11 Jun 2023
Already talked to you
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 16 Jun 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
based on 2 reviews
Rating in categories
Senior Engineer
880
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Engineer
867
salaries
| ₹2.2 L/yr - ₹6.8 L/yr |
Associate Manager
490
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
398
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Civil Engineer
359
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company