Filter interviews by
Clear (1)
The company policy is to prioritize quality and safety in all aspects of operations.
The company has a strict quality control process in place
All employees are trained on quality and safety procedures
Regular audits are conducted to ensure compliance with regulations
Continuous improvement is encouraged to enhance quality and safety
Customer satisfaction is a top priority
Top trending discussions
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
Underground Metro segment casting yard steam curing is a process used to accelerate the strength gain of concrete segments for tunnel construction.
Steam curing involves applying high temperature steam to the concrete segments to speed up the hydration process.
This method helps in achieving the required strength of the segments in a shorter time period.
Steam curing is often used in precast concrete production for underg...
Segment casting cycle is the process of creating segments for construction projects using precast concrete.
Segments are cast in a controlled environment to ensure quality and consistency.
The casting cycle includes preparing molds, pouring concrete, curing, demolding, and finishing.
Segments are then transported to the construction site and assembled to form the final structure.
Segments repairing process involves identifying and fixing issues in different sections of a product or system.
Identify the specific segment that needs repair
Analyze the root cause of the issue
Develop a plan for repairing the segment
Implement the repair process
Test the repaired segment to ensure functionality
I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Dec 2022. There were 2 interview rounds.
The water-cement (w/c) ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
The w/c ratio is a crucial factor in determining the strength and durability of concrete.
A lower w/c ratio typically results in stronger and more durable concrete.
The w/c ratio should be carefully controlled to achieve the desired concrete properties.
For example, a w/c ratio of 0.5 means that for every 1 kg o
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Mathematics, English, Reasoning
An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.
Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.
Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...
Clean India
Corruption
posted on 14 Jul 2021
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
based on 4 reviews
Rating in categories
Engineer
899
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
884
salaries
| ₹3 L/yr - ₹11.5 L/yr |
Associate Manager
503
salaries
| ₹5 L/yr - ₹15.5 L/yr |
Mechanical Engineer
413
salaries
| ₹2 L/yr - ₹9 L/yr |
Civil Engineer
338
salaries
| ₹2.2 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company