Upload Button Icon Add office photos

Filter interviews by

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer Interview Questions and Answers

Updated 12 Jun 2024

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer Interview Experiences

2 interviews found

QA QC Engineer Interview Questions & Answers

user image Faizan shah

posted on 12 Jun 2024

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to make itp
  • Ans. 

    ITP stands for Inspection and Test Plan, a document outlining the procedures and criteria for quality control in a project.

    • Define the scope and objectives of the project

    • Identify the key activities and deliverables

    • Specify the inspection and testing requirements

    • Outline the acceptance criteria

    • Assign responsibilities and timelines

    • Review and approve the ITP before implementation

  • Answered by AI
  • Q2. How to make checklist
  • Ans. 

    Checklist can be made by identifying key tasks, setting priorities, creating categories, and including necessary details.

    • Identify key tasks that need to be completed

    • Set priorities for each task

    • Create categories to organize tasks

    • Include necessary details such as deadlines, responsible parties, and resources needed

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good interview basic question asked

QA QC Engineer Interview Questions & Answers

user image Mohammad Bayis

posted on 6 Feb 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Type of piles used in pilling
  • Ans. 

    Different types of piles used in piling include driven piles, bored piles, and auger cast piles.

    • Driven piles are installed by driving them into the ground using a pile driver.

    • Bored piles are created by drilling a hole into the ground and then filling it with concrete.

    • Auger cast piles are formed by drilling a hole and then filling it with concrete while slowly withdrawing the auger.

    • Other types of piles include sheet pil

  • Answered by AI

QA QC Engineer Interview Questions Asked at Other Companies

Q1. wha is your response ?, if material will purchase from any factor ... read more
Q2. What are the tests you have done
Q3. What Types of admixture generally used in concrete?
Q4. What do you check beam,columns and slab casting?
asked in Anabeeb
Q5. 1.What is the difference between shutdown and turnaround? 2.Expla ... read more

Interview questions from similar companies

Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - What you know told boldly and answer with smile

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What do you want to do in 5 years
  • Q2. What is glass
  • Ans. 

    Glass is a solid, transparent material made by heating a mixture of silica and other materials.

    • Glass is a non-crystalline, amorphous solid

    • It is made by heating a mixture of silica, soda ash, and lime

    • It can be molded into various shapes and sizes

    • It is used in windows, mirrors, lenses, and containers

    • Different types of glass include tempered, laminated, and stained glass

  • Answered by AI
  • Q3. What is graphene
  • Ans. 

    Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.

    • It is the thinnest material known to man

    • It is a good conductor of electricity and heat

    • It is incredibly strong and flexible

    • It has potential applications in electronics, energy, and medicine

  • Answered by AI
  • Q4. What is your expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk about the topic wher you are good at

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

Interview Questionnaire 

1 Question

  • Q1. Technical question

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Interview FAQs

How many rounds are there in SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer interview?
SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION interview process usually has 1 rounds. The most common rounds in the SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION interview process are Technical.
What are the top questions asked in SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer interview?

Some of the top questions asked at the SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer interview -

  1. how to make checkl...read more
  2. Type of piles used in pill...read more
  3. how to make ...read more

Tell us how to improve this page.

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION QA QC Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

3.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Mechanical Engineer
6 salaries
unlock blur

₹2 L/yr - ₹11.5 L/yr

Electrical Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Electrical Engineer
5 salaries
unlock blur

₹3.3 L/yr - ₹12 L/yr

Instrument Engineer
5 salaries
unlock blur

₹13.2 L/yr - ₹16 L/yr

QC Piping Inspector
4 salaries
unlock blur

₹10 L/yr - ₹27.2 L/yr

Explore more salaries
Compare SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION with

L&T Construction

4.0
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview