Upload Button Icon Add office photos

Filter interviews by

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Civil Foreman Interview Questions and Answers

Updated 17 Jan 2022

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Civil Foreman Interview Experiences

1 interview found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 17 Jan 2022

I applied via Job Portal and was interviewed before Jan 2021. There were 12 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Ans. 

    I am an experienced Civil Foreman with a strong background in managing construction projects and leading teams.

    • Over 10 years of experience in the construction industry

    • Proven track record of successfully completing projects on time and within budget

    • Expertise in interpreting blueprints and ensuring compliance with building codes

    • Skilled in coordinating and supervising construction activities

    • Strong leadership and communica...

  • Answered by AI
  • Q2. What about your passport
Round 3 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 4 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 5 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 6 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 7 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 8 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 9 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips
Round 10 - Resume Shortlist 
Pro Tip by AmbitionBox:
Name your CV properly while saving it. It is highly likely that the recruiter won't even open your CV if you name it casually.
View all tips
Round 11 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t put irrelevant stats in your CV to impress employers. Use numbers and statics to highlight the impact of your work.
View all tips
Round 12 - Resume Shortlist 
Pro Tip by AmbitionBox:
Using appropriate keywords increases your CV’s visibility. Many recruiters just type keywords on job portals to find CVs.
View all tips

Interview Preparation Tips

Topics to prepare for SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Civil Foreman interview:
  • Company Law Matters
Interview preparation tips for other job seekers - This is manojroy civil foreman.my positions site Incharge

Interview questions from similar companies

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Work details and your behavior your attitude your skills your experience You speak true your skills your experience averything
  • Q2. Start is how are you, what is your skills, your experience, your behavior your all details
  • Q3. Your work experience, how you give progress fast, how you save workrs, how you manage manpower
  • Ans. 

    I prioritize efficient progress, worker safety, and effective manpower management.

    • I closely monitor project timelines and identify areas where progress can be expedited.

    • I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.

    • For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...

  • Answered by AI
  • Q4. How you work experience, you speak true sir I'm working this company 3 years this is my sartifiket

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Civil Foreman interview:
  • Civil Construction
  • Your work experience
  • Your sartifiket
  • Your behavior
  • Your aducation
  • How to give progress
  • Drawing you know
  • How you expect salary
  • All details
Interview preparation tips for other job seekers - Don't think negative, think positive and speak averything true that sit

Civil Foreman Interview Questions & Answers

Bechtel user image Balbir Singh Singh

posted on 15 Feb 2022

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Topics to prepare for Bechtel Civil Foreman interview:
  • Communication Skills
Interview preparation tips for other job seekers - Good team proper material management work under program or safety first
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - HR 

(2 Questions)

  • Q1. How to control quality.
  • Ans. 

    Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.

    • Establishing quality control procedures and protocols

    • Regular inspections and testing of materials and workmanship

    • Training and educating staff on quality standards

    • Implementing corrective actions when deviations are identified

    • Utilizing quality control tools such as checklists

  • Answered by AI
  • Q2. What is BBS is code.
  • Ans. 

    BBS in code refers to Bar Bending Schedule as per Indian standards.

    • BBS stands for Bar Bending Schedule.

    • It is a detailed list of reinforcement bars to be used in a construction project.

    • It includes information on bar sizes, shapes, quantities, and placement.

    • BBS is prepared as per the requirements of Indian standards like IS 2502:1963.

    • It helps in ensuring proper reinforcement placement and quantity in the structure.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How to work split ac
  • Ans. 

    To work a split AC, you need to understand how the indoor and outdoor units function together to cool the space efficiently.

    • Ensure the indoor unit is properly mounted on the wall at a suitable height.

    • Connect the indoor unit to the outdoor unit using refrigerant lines and electrical wiring.

    • Set the desired temperature and fan speed on the remote control.

    • Regularly clean or replace the air filters to maintain optimal perfo...

  • Answered by AI
  • Q2. What the Full Form VRV
  • Ans. 

    Variable Refrigerant Volume

    • VRV stands for Variable Refrigerant Volume

    • It is a type of HVAC system that uses refrigerant as the cooling and heating medium

    • Allows for individual control of temperature in different zones

    • Commonly used in commercial buildings and large residential complexes

  • Answered by AI
  • Q3. How many Typ Gas
  • Ans. 

    The question is unclear and seems to be missing important context.

    • Ask for clarification on what 'Typ Gas' refers to

    • Provide examples of different types of gases commonly used in HVAC systems

    • Discuss the importance of knowing the specific type of gas for safety and efficiency

  • Answered by AI
  • Q4. Ther have more type gas Just R22/ 410/R32/
  • Q5. How to handle 8/9 people
  • Ans. 

    Delegate tasks effectively, communicate clearly, establish expectations, provide support and feedback, address conflicts promptly.

    • Delegate tasks based on individual strengths and skills

    • Communicate clearly and regularly to ensure everyone is on the same page

    • Establish clear expectations and goals for the team

    • Provide support and feedback to help team members succeed

    • Address conflicts promptly and professionally to maintain

  • Answered by AI
  • Q6. As team work every people polayady speack and truthly and Honestly workjng

Interview Preparation Tips

Interview preparation tips for other job seekers - Life is very importent Money without money life is not sucsses & not happy your & my family 100% Need to job and money life is normaly gone
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

It is very difficult test to pass

Round 2 - Technical 

(1 Question)

  • Q1. Technical interview of concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly go through the technical subjects before attending interview

I was interviewed in May 2022.

Round 1 - Coding Test 
Round 2 - Technical 

(1 Question)

  • Q1. Keval pulling high and low voltage termination login commissioning and testing system have experience of work
Round 3 - Technical 

(1 Question)

  • Q1. I have oil and gas Power Plant finding electrical system maintenance and installation work and supervision

Interview Preparation Tips

Interview preparation tips for other job seekers - Well and guest refinery power plant dash plant

I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Every question as in my work experience how many years of experience and how much companies u change .
  • Q2. 1 . What is ur work in previous company.
  • Q3. I have 6 years of experience in railway tunnel and station work

Interview Preparation Tips

Interview preparation tips for other job seekers - Tips of interview get mail id and send ur cv

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brick work plaster work tile work flooring work cladding work

Civil Foreman Interview Questions & Answers

Bechtel user image Balbir Singh Singh

posted on 15 Feb 2022

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Be a good listener. GDs are not just about speaking. Your listening skills will give you a lot of points to counter and speak when your turn comes.
View all tips

Interview Preparation Tips

Topics to prepare for Bechtel Civil Foreman interview:
  • Communication Skills
Interview preparation tips for other job seekers - Good team proper material management work under program or safety first

SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Interview FAQs

How many rounds are there in SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Civil Foreman interview?
SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION interview process usually has 12 rounds. The most common rounds in the SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 734 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Thermax Limited Interview Questions
4.2
 • 244 Interviews
ABB Interview Questions
4.1
 • 229 Interviews
Adani Power Interview Questions
3.9
 • 213 Interviews
Saint-Gobain Interview Questions
4.0
 • 171 Interviews
View all
Mechanical Engineer
6 salaries
unlock blur

₹2 L/yr - ₹11.5 L/yr

Electrical Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Electrical Engineer
5 salaries
unlock blur

₹3.3 L/yr - ₹12 L/yr

Instrument Engineer
5 salaries
unlock blur

₹13.2 L/yr - ₹16 L/yr

QC Piping Inspector
4 salaries
unlock blur

₹10 L/yr - ₹27.2 L/yr

Explore more salaries
Compare SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION with

Power Grid Corporation of India

4.4
Compare

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview