Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2020. There were 5 interview rounds.
The 87T transformer differential testing procedure is used to test the differential relay protection system of a transformer.
Disconnect the transformer from the power source
Connect the relay test set to the differential relay
Inject current into the relay and measure the response
Compare the results with the expected values
Perform a secondary injection test to verify the accuracy of the test set
Document the test results
LV circuit breaker with coupling breaker is used for protection and isolation of electrical circuits.
LV circuit breaker is a device that automatically interrupts the flow of current in an electrical circuit.
Coupling breaker is used to connect or disconnect two circuits.
LV circuit breaker with coupling breaker is used to protect and isolate electrical circuits.
It is commonly used in power distribution systems.
It helps i...
Primary injection testing is a method to verify the performance of a circuit breaker or protective relay.
Primary injection testing involves injecting a high current into the circuit to simulate a fault condition.
The current is measured and compared to the expected values to ensure the circuit breaker or relay is functioning properly.
Calculations involve determining the expected current based on the system voltage, impe...
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
Some of the top questions asked at the SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION Electrical Operations Engineer interview -
Mechanical Engineer
6
salaries
| ₹2 L/yr - ₹11.5 L/yr |
Electrical Site Engineer
6
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Electrical Engineer
5
salaries
| ₹3.3 L/yr - ₹12 L/yr |
Instrument Engineer
5
salaries
| ₹13.2 L/yr - ₹16 L/yr |
QC Piping Inspector
4
salaries
| ₹10 L/yr - ₹27.2 L/yr |
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation