Manan Construction Billing Engineer and Quantity Surveyor Interview Questions and Answers

Updated 21 Sep 2023

Manan Construction Billing Engineer and Quantity Surveyor Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Why steel needed in column as column is compression member?
  • Ans. 

    Steel is used in columns to provide additional strength and prevent buckling under compression loads.

    • Steel helps in reducing the slenderness ratio of the column, increasing its load carrying capacity.

    • Steel provides ductility to the column, allowing it to deform without sudden failure.

    • Steel helps in resisting lateral torsional buckling, which can occur in long and slender columns.

    • Steel also helps in providing stability ...

  • Answered by AI
  • Q2. About Mix design for M25 grade?
  • Q3. What is development length?
  • Ans. 

    Development length is the minimum length of embedded reinforcement required to transfer the stresses between the reinforcement and the concrete.

    • Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.

    • It is important to ensure that the development length is adequate to prevent premature failure of the structure.

    • For example, in a reinforced concret...

  • Answered by AI
  • Q4. How much u know about line out in site?
  • Q5. How much u rate urself in this job profile
  • Q6. Different rates which are in the market now for Shuttring, steel,concrete etc?
  • Ans. 

    Rates for shuttring, steel, and concrete vary based on location, quality, and market demand.

    • Rates for shuttring can range from $15 to $30 per square foot.

    • Steel prices fluctuate based on market conditions and can range from $500 to $800 per ton.

    • Concrete prices vary depending on the mix design and can range from $100 to $150 per cubic yard.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Manan Construction Billing Engineer and Quantity Surveyor interview:
  • QS
  • Lineout
Interview preparation tips for other job seekers - You tube the points for which job role u r applying that is more than enough

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. After one round from Walk in Interview didn't call for 2nd round although they b committed for the same
  • Q2. Technical questions in viva plus written test
  • Q3. Theoretical test
Round 2 - One-on-one 

(2 Questions)

  • Q1. Never called for second round
  • Q2. Yes didn't call even after selection from 1st round

Interview Preparation Tips

Interview preparation tips for other job seekers - don't expect from walk in interview
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel

I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Related about to quantity and IS codes.
  • Q2. According to IS code and as per site execution knowledge I answered.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension at the time of interview. And if you don't know that you clearly describe that what youu know and what you don't.

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All questions about my previous job experience & present knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - just share your knowledge what you learn from your previous experience. if it is coincide with their requirement, U r the one what they expect from....

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. After one round from Walk in Interview didn't call for 2nd round although they b committed for the same
  • Q2. Technical questions in viva plus written test
  • Q3. Theoretical test
Round 2 - One-on-one 

(2 Questions)

  • Q1. Never called for second round
  • Q2. Yes didn't call even after selection from 1st round

Interview Preparation Tips

Interview preparation tips for other job seekers - don't expect from walk in interview
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What are the projects handled in past?
  • Q2. Role of Quantity surveyor in Road projects?
  • Ans. 

    Quantity surveyors play a crucial role in road projects by estimating costs, managing budgets, and ensuring project efficiency.

    • Estimating costs for materials, labor, and equipment

    • Preparing tender documents and contracts

    • Managing project budgets and costs

    • Conducting cost analysis and value engineering

    • Ensuring compliance with regulations and specifications

    • Providing financial advice and risk management

    • Collaborating with eng...

  • Answered by AI
  • Q3. What is the process of billing?
  • Ans. 

    Billing is the process of creating and sending invoices to clients for services or products provided.

    • Prepare detailed breakdown of costs incurred

    • Calculate quantities and rates for each item

    • Include any additional charges or discounts

    • Generate invoice and send to client for payment

    • Track payments and follow up on overdue invoices

  • Answered by AI
  • Q4. Required inputs for Cost Estimations?
  • Ans. 

    Inputs for Cost Estimations include project scope, materials, labor costs, equipment costs, overhead costs, and profit margin.

    • Project scope: Detailed understanding of the project requirements and deliverables.

    • Materials: Cost of all materials required for the project.

    • Labor costs: Cost of labor required to complete the project.

    • Equipment costs: Cost of any equipment or machinery needed for the project.

    • Overhead costs: Addi...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your family background?
  • Q2. How many dependents are in your family?

Interview Preparation Tips

Interview preparation tips for other job seekers - Need not to worry about interview cracking, need to have knowledge of your role which you are handling.

I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is cost to complete
  • Ans. 

    Cost to complete refers to the estimated amount of money required to finish a project or task.

    • Cost to complete is an important metric used in project management and quantity surveying.

    • It takes into account the remaining work, resources, and expenses needed to complete a project.

    • It helps in assessing the financial status of a project and making informed decisions.

    • Cost to complete can be calculated by subtracting the act...

  • Answered by AI
  • Q2. Unit weight of various steel bars
  • Ans. 

    Unit weight of steel bars varies based on their diameter and length.

    • The weight of steel bars is measured in kilograms per meter (kg/m).

    • The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.

    • For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge and basic strong and be confident

Manan Construction Interview FAQs

How many rounds are there in Manan Construction Billing Engineer and Quantity Surveyor interview?
Manan Construction interview process usually has 2 rounds. The most common rounds in the Manan Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in Manan Construction Billing Engineer and Quantity Surveyor interview?

Some of the top questions asked at the Manan Construction Billing Engineer and Quantity Surveyor interview -

  1. Different rates which are in the market now for Shuttring, steel,concrete e...read more
  2. Why steel needed in column as column is compression memb...read more
  3. What is development leng...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 402 Interviews
Tata Technologies Interview Questions
3.7
 • 251 Interviews
TCE Interview Questions
3.8
 • 241 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
View all
Junior Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹2.2 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹2.3 L/yr - ₹3.5 L/yr

Site Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Site Incharge
4 salaries
unlock blur

₹4 L/yr - ₹4.2 L/yr

Civil Engineer
4 salaries
unlock blur

₹2 L/yr - ₹2.9 L/yr

Explore more salaries
Compare Manan Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview