Filter interviews by
RCC drainage line work involves the construction of reinforced concrete structures for efficient drainage system.
RCC drainage line work is the construction of drainage systems using reinforced concrete structures.
It involves designing and building channels, pipes, and culverts to efficiently drain water.
The work includes excavation, formwork, reinforcement, and pouring of concrete.
Proper slope and alignment are crucial...
A pipe rack is a structure used to support and protect cables in an organized manner.
Pipe racks are commonly used in industrial plants and construction sites.
They are designed to provide a safe and efficient way to route and support cables.
Pipe racks can be made of steel, aluminum, or other materials depending on the requirements.
They are typically elevated to prevent damage from flooding or other hazards.
Proper spacin...
posted on 31 Jul 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
Steel is used in columns to provide additional strength and prevent buckling under compression loads.
Steel helps in reducing the slenderness ratio of the column, increasing its load carrying capacity.
Steel provides ductility to the column, allowing it to deform without sudden failure.
Steel helps in resisting lateral torsional buckling, which can occur in long and slender columns.
Steel also helps in providing stability ...
Development length is the minimum length of embedded reinforcement required to transfer the stresses between the reinforcement and the concrete.
Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.
It is important to ensure that the development length is adequate to prevent premature failure of the structure.
For example, in a reinforced concret...
Rates for shuttring, steel, and concrete vary based on location, quality, and market demand.
Rates for shuttring can range from $15 to $30 per square foot.
Steel prices fluctuate based on market conditions and can range from $500 to $800 per ton.
Concrete prices vary depending on the mix design and can range from $100 to $150 per cubic yard.
Top trending discussions
posted on 1 Apr 2021
posted on 1 Apr 2021
posted on 1 Apr 2021
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
posted on 29 Jun 2015
posted on 29 Jun 2015
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
based on 4 interviews
Interview experience
based on 14 reviews
Rating in categories
Junior Engineer
10
salaries
| ₹1.1 L/yr - ₹2.2 L/yr |
Site Engineer
8
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Civil Site Engineer
7
salaries
| ₹2.3 L/yr - ₹3.5 L/yr |
Project Manager
4
salaries
| ₹4.6 L/yr - ₹11.2 L/yr |
Site Incharge
4
salaries
| ₹4 L/yr - ₹4.2 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies