Upload Button Icon Add office photos

Filter interviews by

Manan Construction Interview Questions and Answers

Updated 20 Dec 2023

Manan Construction Interview Experiences

Popular Designations

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(13 Questions)

  • Q1. As sr engineer Industrial projects & Sugar factories project
  • Q2. My job in very very hard
  • Q3. Individual work Rcc work & labour handling &Billing daily safety report & daily DPR submitted & Bbs related
  • Q4. Finishing work & Road work
  • Q5. Rcc trimix work & under ground Crossing work
  • Q6. Rcc drainage line work
  • Ans. 

    RCC drainage line work involves the construction of reinforced concrete structures for efficient drainage system.

    • RCC drainage line work is the construction of drainage systems using reinforced concrete structures.

    • It involves designing and building channels, pipes, and culverts to efficiently drain water.

    • The work includes excavation, formwork, reinforcement, and pouring of concrete.

    • Proper slope and alignment are crucial...

  • Answered by AI
  • Q7. Rcc road& bitumen road work
  • Q8. Rcc pqc concrete work
  • Q9. LMC & polymer flooring work
  • Q10. Building Bbm & Aac block work
  • Q11. Plaster work & floor tiles
  • Q12. Shuttering work &
  • Q13. Pipe rack for cables line
  • Ans. 

    A pipe rack is a structure used to support and protect cables in an organized manner.

    • Pipe racks are commonly used in industrial plants and construction sites.

    • They are designed to provide a safe and efficient way to route and support cables.

    • Pipe racks can be made of steel, aluminum, or other materials depending on the requirements.

    • They are typically elevated to prevent damage from flooding or other hazards.

    • Proper spacin...

  • Answered by AI
Round 3 - HR 

(11 Questions)

  • Q1. Quality department design mix
  • Q2. Quality document related
  • Q3. Client & consultant document related
  • Q4. As site management
  • Q5. Dpr related documents
  • Q6. Site quality compliances
  • Q7. Safety related daily safety report tbt
  • Q8. Concrete cube testing whiteness
  • Q9. By consultant witness
  • Q10. Daily concrete cube testing
  • Q11. Concrete slump check

Interview Preparation Tips

Interview preparation tips for other job seekers - As site all workers DPR submitted by Ho
& Site management

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Why steel needed in column as column is compression member?
  • Ans. 

    Steel is used in columns to provide additional strength and prevent buckling under compression loads.

    • Steel helps in reducing the slenderness ratio of the column, increasing its load carrying capacity.

    • Steel provides ductility to the column, allowing it to deform without sudden failure.

    • Steel helps in resisting lateral torsional buckling, which can occur in long and slender columns.

    • Steel also helps in providing stability ...

  • Answered by AI
  • Q2. About Mix design for M25 grade?
  • Q3. What is development length?
  • Ans. 

    Development length is the minimum length of embedded reinforcement required to transfer the stresses between the reinforcement and the concrete.

    • Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.

    • It is important to ensure that the development length is adequate to prevent premature failure of the structure.

    • For example, in a reinforced concret...

  • Answered by AI
  • Q4. How much u know about line out in site?
  • Q5. How much u rate urself in this job profile
  • Q6. Different rates which are in the market now for Shuttring, steel,concrete etc?
  • Ans. 

    Rates for shuttring, steel, and concrete vary based on location, quality, and market demand.

    • Rates for shuttring can range from $15 to $30 per square foot.

    • Steel prices fluctuate based on market conditions and can range from $500 to $800 per ton.

    • Concrete prices vary depending on the mix design and can range from $100 to $150 per cubic yard.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Manan Construction Billing Engineer and Quantity Surveyor interview:
  • QS
  • Lineout
Interview preparation tips for other job seekers - You tube the points for which job role u r applying that is more than enough

Billing Engineer and Quantity Surveyor Interview Questions asked at other Companies

Q1. Different rates which are in the market now for Shuttring, steel,concrete etc?
View answer (1)

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Concepts

Interview Questionnaire 

1 Question

  • Q1. Concepts

Interview Questionnaire 

1 Question

  • Q1. Conceps

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Discussion about Past experience and projects. Relaxed atmosphere. Normal interview

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed. Explain work and experience. Also projects.

Interview Preparation Tips

Round: TECHNICAL ROUND TEST
Experience: A 45 mins round which consisted of 30 mins of core questions and 15 mins of data structures.  It was a mix of test on our knowledge .

Round: HR Interview
Experience: Most of the questions were based on general knowledge and many of them were from the resume provides by me

General Tips: It is always advisable to be prepared with certain set of general questions which make it easier to answer.
Skill Tips: Focus on your Study.. Revise the subject that you have studied at the time of Interview
Skills: Technical Skills
College Name: IIT MADRAS

Interview Preparation Tips

Round: Test
Experience: Questions were on Aptitude, English, Probability, Permutations andCombinations and Programming (C, C++). NO Group Discussion was held.Candidates were shortlisted on the basis of their test scores.

Round: Technical Interview
Experience: Total time of this round was 45 minutes.First 30 minutes, questions on core programming were asked and in the remaining 15 minutes questions were asked on data structures.

Round: HR Interview
Experience: This was a 5 minute round where questions were put up, some based on the resume and other were general questions.

Skills: Knowledge in MATLAB.
College Name: IIT MADRAS

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

Manan Construction Interview FAQs

How many rounds are there in Manan Construction interview?
Manan Construction interview process usually has 2-3 rounds. The most common rounds in the Manan Construction interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Manan Construction interview?

Some of the top questions asked at the Manan Construction interview -

  1. Different rates which are in the market now for Shuttring, steel,concrete e...read more
  2. Why steel needed in column as column is compression memb...read more
  3. What is development leng...read more

Tell us how to improve this page.

Manan Construction Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

Manan Construction Reviews and Ratings

based on 14 reviews

4.3/5

Rating in categories

4.1

Skill development

4.0

Work-life balance

3.7

Salary

4.4

Job security

4.3

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 14 Reviews and Ratings
Junior Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹2.2 L/yr

Site Engineer
8 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹2.3 L/yr - ₹3.5 L/yr

Project Manager
4 salaries
unlock blur

₹4.6 L/yr - ₹11.2 L/yr

Site Incharge
4 salaries
unlock blur

₹4 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Manan Construction with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview