Filter interviews by
RCC drainage line work involves the construction of reinforced concrete structures for efficient drainage system.
RCC drainage line work is the construction of drainage systems using reinforced concrete structures.
It involves designing and building channels, pipes, and culverts to efficiently drain water.
The work includes excavation, formwork, reinforcement, and pouring of concrete.
Proper slope and alignment are crucial...
A pipe rack is a structure used to support and protect cables in an organized manner.
Pipe racks are commonly used in industrial plants and construction sites.
They are designed to provide a safe and efficient way to route and support cables.
Pipe racks can be made of steel, aluminum, or other materials depending on the requirements.
They are typically elevated to prevent damage from flooding or other hazards.
Proper spacin...
Top trending discussions
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 14 Jan 2022
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine
based on 1 interview
Interview experience
Junior Engineer
10
salaries
| ₹1.1 L/yr - ₹2.2 L/yr |
Site Engineer
8
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Civil Site Engineer
7
salaries
| ₹2.3 L/yr - ₹3.5 L/yr |
Project Manager
4
salaries
| ₹4.6 L/yr - ₹11.2 L/yr |
Site Incharge
4
salaries
| ₹4 L/yr - ₹4.2 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies