Upload Button Icon Add office photos

Filter interviews by

Manan Construction Billing Engineer and Quantity Surveyor Interview Questions and Answers

Updated 21 Sep 2023

Manan Construction Billing Engineer and Quantity Surveyor Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Why steel needed in column as column is compression member?
  • Ans. 

    Steel is used in columns to provide additional strength and prevent buckling under compression loads.

    • Steel helps in reducing the slenderness ratio of the column, increasing its load carrying capacity.

    • Steel provides ductility to the column, allowing it to deform without sudden failure.

    • Steel helps in resisting lateral torsional buckling, which can occur in long and slender columns.

    • Steel also helps in providing stability ...

  • Answered by AI
  • Q2. About Mix design for M25 grade?
  • Q3. What is development length?
  • Ans. 

    Development length is the minimum length of embedded reinforcement required to transfer the stresses between the reinforcement and the concrete.

    • Development length is influenced by factors such as concrete strength, reinforcement diameter, bond strength, and cover thickness.

    • It is important to ensure that the development length is adequate to prevent premature failure of the structure.

    • For example, in a reinforced concret...

  • Answered by AI
  • Q4. How much u know about line out in site?
  • Q5. How much u rate urself in this job profile
  • Q6. Different rates which are in the market now for Shuttring, steel,concrete etc?
  • Ans. 

    Rates for shuttring, steel, and concrete vary based on location, quality, and market demand.

    • Rates for shuttring can range from $15 to $30 per square foot.

    • Steel prices fluctuate based on market conditions and can range from $500 to $800 per ton.

    • Concrete prices vary depending on the mix design and can range from $100 to $150 per cubic yard.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Manan Construction Billing Engineer and Quantity Surveyor interview:
  • QS
  • Lineout
Interview preparation tips for other job seekers - You tube the points for which job role u r applying that is more than enough

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. After one round from Walk in Interview didn't call for 2nd round although they b committed for the same
  • Q2. Technical questions in viva plus written test
  • Q3. Theoretical test
Round 2 - One-on-one 

(2 Questions)

  • Q1. Never called for second round
  • Q2. Yes didn't call even after selection from 1st round

Interview Preparation Tips

Interview preparation tips for other job seekers - don't expect from walk in interview

Interview Questionnaire 

2 Questions

  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident

I applied via Campus Placement and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. In resume about our stream of study

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the resume complete ly and your stream of study

Manan Construction Interview FAQs

How many rounds are there in Manan Construction Billing Engineer and Quantity Surveyor interview?
Manan Construction interview process usually has 2 rounds. The most common rounds in the Manan Construction interview process are Resume Shortlist and Technical.
What are the top questions asked in Manan Construction Billing Engineer and Quantity Surveyor interview?

Some of the top questions asked at the Manan Construction Billing Engineer and Quantity Surveyor interview -

  1. Different rates which are in the market now for Shuttring, steel,concrete e...read more
  2. Why steel needed in column as column is compression memb...read more
  3. What is development leng...read more

Tell us how to improve this page.

Manan Construction Billing Engineer and Quantity Surveyor Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 266 Interviews
TCE Interview Questions
3.8
 • 252 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all
Junior Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹2.2 L/yr

Site Engineer
8 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹2.3 L/yr - ₹3.5 L/yr

Project Manager
4 salaries
unlock blur

₹4.6 L/yr - ₹11.2 L/yr

Site Incharge
4 salaries
unlock blur

₹4 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Manan Construction with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview