Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by M/s S S Alur Construction Company Team. If you also belong to the team, you can get access from here

M/s S S Alur Construction Company Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

M/s S S Alur Construction Company Civil Site Engineer Interview Questions and Answers

Updated 15 Feb 2025

M/s S S Alur Construction Company Civil Site Engineer Interview Experiences

1 interview found

Civil Site Engineer Interview Questions & Answers

user image MALLIKARJUN ASANGIHAL

posted on 15 Feb 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What are different grades of concrete & where are they used?
  • Q2. What aare the different types of foundations ,& how do you decide which one to use?
Round 2 - HR 

(2 Questions)

  • Q1. What do you know about our ongoing projects?
  • Q2. Describe a situation where you faced a challenge-on site and how you handeled it.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be transparent regarding your work experience and skills.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much your Salary
  • Ans. 

    My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.

    • My salary is determined by factors such as my level of experience in the field.

    • Qualifications and certifications also play a role in determining my salary.

    • Market rates for Civil Site Engineers in the specific location where I work also influence my salary.

    • I am open to discussing salary expectations

  • Answered by AI
  • Q2. When you Join, We need urgent requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - Bakwas
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. I B. Tech degree I tunnel work for 4 years work experience I hard work of duty
  • Q2. I waiting for megha engineering and infrastructure
  • Q3. I will b resume send megha engineering and infrastructure and response me
  • Q4. I waiting megha engineering and infrastructure

Interview Preparation Tips

Topics to prepare for Afcons Infrastructure Civil Site Engineer interview:
  • 4 years
Interview preparation tips for other job seekers - I am interested job civil site engineer
Tunnel work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Company management
  • Q2. Machine fitness
  • Q3. Eco friendly management
  • Q4. Road management
  • Q5. Electricals system
Round 2 - Group Discussion 

I love construction line but one thing please provide some extra pay

Interview Preparation Tips

Interview preparation tips for other job seekers - According to my suggestion I love construction line ❤️
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. Technical question
  • Q2. Water line Drawing wate tank
  • Q3. Concrete grade & mixing
  • Q4. Slump testing & cube strength
  • Q5. Measurement & drawing map making
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. In which firm you have worked before?
  • Ans. 

    I have worked at XYZ Engineering Firm as a Civil Site Engineer.

    • Worked at XYZ Engineering Firm

    • Position: Civil Site Engineer

    • Responsibilities included site inspections, project management, and coordination with contractors

    • Completed projects include construction of a commercial building and a residential complex

  • Answered by AI
  • Q2. What was your job profile ?
  • Ans. 

    As a Civil Site Engineer, my job profile involved overseeing construction projects, managing site operations, and ensuring compliance with safety regulations.

    • Managed and supervised construction projects from start to finish

    • Coordinated with architects, contractors, and subcontractors to ensure smooth project execution

    • Monitored site operations and ensured adherence to project plans and specifications

    • Performed quality con...

  • Answered by AI
  • Q3. How many years of experience you have?
  • Ans. 

    I have 5 years of experience as a Civil Site Engineer.

    • I have worked on various construction projects, including residential, commercial, and infrastructure.

    • During my time as a Civil Site Engineer, I have successfully managed and supervised construction activities.

    • I am well-versed in interpreting engineering drawings and specifications.

    • I have experience in conducting site inspections and ensuring compliance with safety ...

  • Answered by AI
  • Q4. What was your work exactly?
  • Ans. 

    I worked as a Civil Site Engineer, responsible for overseeing construction projects and ensuring their successful completion.

    • Managed and supervised construction activities on site

    • Ensured compliance with building codes and regulations

    • Collaborated with architects, contractors, and other professionals

    • Prepared and reviewed project plans, drawings, and specifications

    • Monitored progress and quality of work

    • Resolved any issues ...

  • Answered by AI
  • Q5. General civil engineering questions like full form of TBM? Types of soil?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and presentable, answer the questions properly. If you are unable to answer some questions then politely tell them sorry sir

M/s S S Alur Construction Company Interview FAQs

How many rounds are there in M/s S S Alur Construction Company Civil Site Engineer interview?
M/s S S Alur Construction Company interview process usually has 2 rounds. The most common rounds in the M/s S S Alur Construction Company interview process are Technical and HR.
What are the top questions asked in M/s S S Alur Construction Company Civil Site Engineer interview?

Some of the top questions asked at the M/s S S Alur Construction Company Civil Site Engineer interview -

  1. What are different grades of concrete & where are they us...read more
  2. What aare the different types of foundations ,& how do you decide which one to ...read more

Tell us how to improve this page.

M/s S S Alur Construction Company Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
General Manager
4 salaries
unlock blur

₹4.5 L/yr - ₹8.5 L/yr

Explore more salaries
Compare M/s S S Alur Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview