Upload Button Icon Add office photos

Filter interviews by

LTG INFRASTRUCTURE Civil Engineer Interview Questions and Answers

Updated 2 Sep 2023

LTG INFRASTRUCTURE Civil Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. They ask you about your technical skills in civil engineering and question on civil engineering materials, tests etc..
Round 3 - One-on-one 

(1 Question)

  • Q1. Personal and experience
Round 4 - HR 

(1 Question)

  • Q1. Documentary purpose

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Have yo done work in Site quality inspection
  • Ans. 

    Yes, I have experience in site quality inspection as a Civil Engineer.

    • I have conducted regular inspections to ensure compliance with quality standards and specifications.

    • I have reviewed construction plans and specifications to identify potential quality issues.

    • I have performed tests and measurements to verify the quality of materials and workmanship.

    • I have documented and reported any non-compliance or quality concerns ...

  • Answered by AI
  • Q2. Why AFS shuttering size got increased during the using it?
  • Ans. 

    AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.

    • AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.

    • Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.

    • Wear and tear over time can also contribute to an increase in AFS shuttering size.

    • Increased shuttering size can affect the ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nirala Infratech Civil Engineer interview:
  • AFS and Site quality
  • knowledge of High rise building
  • Work methodologies
  • Good command on MS office
Interview preparation tips for other job seekers - Good place to learn the things and new experiences.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Question about civil engineering
  • Q2. Site Execution methods, what is your role. Which methods adopt for work completion in stipulated time with quality
Round 2 - Technical 

(2 Questions)

  • Q1. Material consumption, what is future endeavours
  • Q2. Gypsum, block work, plaster consumption according to floor plate
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the LD for column
  • Ans. 

    LD for column refers to Liquidated Damages for delay in completing the column construction.

    • LD stands for Liquidated Damages.

    • It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.

    • LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.

    • The LD amount is usually mentioned in the cont...

  • Answered by AI
  • Q2. What is the mix ratio of m20 grade of concrete
  • Ans. 

    The mix ratio of M20 grade of concrete is 1:1.5:3.

    • The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.

    • For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 1....

  • Answered by AI
  • Q3. What is the unit weight of steel
  • Ans. 

    The unit weight of steel varies depending on its type and grade.

    • The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).

    • The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).

    • For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).

  • Answered by AI
  • Q4. What is the clear cover for beam
  • Ans. 

    The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.

    • Clear cover is important to protect the reinforcement from corrosion and fire.

    • The clear cover for beams is typically specified in construction drawings or codes.

    • The clear cover can vary depending on the type of beam and its exposure conditions.

    • For example, in a residential building, the clear c...

  • Answered by AI
  • Q5. What is the height of parapet wall
  • Ans. 

    The height of a parapet wall varies depending on its purpose and location.

    • The height of a parapet wall is typically determined by building codes and regulations.

    • In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.

    • In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.

    • Historical buildings ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a Good flat form for job viewers

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Have yo done work in Site quality inspection
  • Ans. 

    Yes, I have experience in site quality inspection as a Civil Engineer.

    • I have conducted regular inspections to ensure compliance with quality standards and specifications.

    • I have reviewed construction plans and specifications to identify potential quality issues.

    • I have performed tests and measurements to verify the quality of materials and workmanship.

    • I have documented and reported any non-compliance or quality concerns ...

  • Answered by AI
  • Q2. Why AFS shuttering size got increased during the using it?
  • Ans. 

    AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.

    • AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.

    • Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.

    • Wear and tear over time can also contribute to an increase in AFS shuttering size.

    • Increased shuttering size can affect the ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nirala Infratech Civil Engineer interview:
  • AFS and Site quality
  • knowledge of High rise building
  • Work methodologies
  • Good command on MS office
Interview preparation tips for other job seekers - Good place to learn the things and new experiences.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Lapping length of slab & beam , lapping position.
  • Q2. Staircase steel detailing drawing.
Round 2 - Group Discussion 

About last company job descriptions.

Round 3 - HR 

(1 Question)

  • Q1. Payment and job descriptions of current company and your role.

Interview Preparation Tips

Interview preparation tips for other job seekers - It is best company for everyone.

I applied via Company Website and was interviewed in Jun 2022. There were 6 interview rounds.

Round 1 - Group Discussion 

Any qustion test gud

Round 2 - One-on-one 

(2 Questions)

  • Q1. Any topic in civil work
  • Q2. Tred rileted qustion
Round 3 - Assignment 

Construction rileted

Round 4 - Group Discussion 

Kam karne ka tarika

Round 5 - Case Study 

Jo bhi work ho raha ho

Round 6 - Assignment 

Fexibel pevment assignment

Interview Preparation Tips

Interview preparation tips for other job seekers - Me jis bhi jage kam karun mera ek udesh hai apna best dena kam ko ace tare sbe karna apna 100% dena
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Pre job details
  • Q2. Monthly pay
Round 2 - Technical 

(3 Questions)

  • Q1. Volume of one cement bag
  • Ans. 

    Volume of one cement bag is typically around 0.035 cubic meters.

    • The volume of one cement bag is usually around 0.035 cubic meters.

    • This volume can vary slightly depending on the type and brand of cement.

    • To calculate the volume of cement bags needed for a project, multiply the number of bags by 0.035.

  • Answered by AI
  • Q2. Proportions for different grades of concrete
  • Ans. 

    Proportions for different grades of concrete are specified by the mix design, typically including cement, sand, and aggregate.

    • Different grades of concrete have different proportions of cement, sand, and aggregate.

    • For example, M20 grade concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).

    • Higher grade concretes like M30 or M40 have higher proportions of cement compared to lower grades.

    • The mix design for concrete ...

  • Answered by AI
  • Q3. How to check blockwork
  • Ans. 

    Blockwork can be checked by ensuring proper alignment, levelness, plumbness, and strength of the blocks.

    • Check alignment by using a straight edge or string line to ensure blocks are in a straight line.

    • Check levelness by using a spirit level to ensure blocks are horizontal.

    • Check plumbness by using a spirit level to ensure blocks are vertical.

    • Check strength by tapping the blocks to listen for hollow sounds which indicate ...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Apane bare me batao.
  • Ans. Sir mera nam manoj Kumar h. Me pauri garhwal uttarakhand se hu. Sir me abhi hisar NCPIL me civil site forman la jam karta hù.
  • Answered Anonymously

LTG INFRASTRUCTURE Interview FAQs

How many rounds are there in LTG INFRASTRUCTURE Civil Engineer interview?
LTG INFRASTRUCTURE interview process usually has 4 rounds. The most common rounds in the LTG INFRASTRUCTURE interview process are HR, Resume Shortlist and Technical.

Tell us how to improve this page.

Civil Site Engineer
7 salaries
unlock blur

₹4 L/yr - ₹4.8 L/yr

Site Engineer
6 salaries
unlock blur

₹2.3 L/yr - ₹4.5 L/yr

Project Engineer
5 salaries
unlock blur

₹5 L/yr - ₹6 L/yr

Junior Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Quality Assurance Quality Control Engineer
3 salaries
unlock blur

₹7.8 L/yr - ₹8.5 L/yr

Explore more salaries
Compare LTG INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare

Adani Ports and SEZ

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview