i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I have previous experience working on construction sites as a Document Controller.
Managed and organized all project documentation
Ensured all documents were up to date and easily accessible
Collaborated with project teams to maintain accurate records
Implemented document control procedures to streamline processes
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.
Discuss about my overall work experience and my working style to process the document.
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Advance excel test, and QA round.
What people are saying about Larsen & Toubro Limited
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
posted on 29 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 21 Jan 2025
I appeared for an interview before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
I applied via Walk-in and was interviewed before Nov 2022. There were 2 interview rounds.
I led a team in implementing a new customer relationship management system at my previous company.
Researched and selected the CRM software that best fit the company's needs
Managed a team of developers and analysts to customize and implement the system
Provided training and support to employees on how to use the new CRM system
The priority job of a control engineer is to design, implement, and maintain control systems for various applications.
Designing control systems to meet specific requirements
Implementing control algorithms to regulate processes
Maintaining and troubleshooting control systems to ensure optimal performance
Collaborating with other engineers and stakeholders to integrate control systems into larger systems
Staying updated on ...
posted on 23 Dec 2024
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
based on 3 interviews
Interview experience
based on 40 reviews
Rating in categories
Assistant Manager
3.9k
salaries
| ₹5 L/yr - ₹18.7 L/yr |
Senior Engineer
3.5k
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.5 L/yr |
Manager
1.1k
salaries
| ₹9 L/yr - ₹29 L/yr |
Assistant Construction Manager
1k
salaries
| ₹6 L/yr - ₹21.5 L/yr |
Tata Projects
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International