Upload Button Icon Add office photos

L&T Energy Hydrocarbon

Compare button icon Compare button icon Compare

Filter interviews by

L&T Energy Hydrocarbon Piping Engineer Interview Questions and Answers for Experienced

Updated 16 Sep 2023

L&T Energy Hydrocarbon Piping Engineer Interview Experiences for Experienced

2 interviews found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How to work in oil and gas refinery
  • Ans. 

    To work in oil and gas refinery, one must have a strong understanding of piping systems, safety regulations, and industry standards.

    • Obtain a degree in engineering or a related field

    • Gain experience through internships or entry-level positions

    • Familiarize yourself with industry-specific software and tools

    • Stay updated on safety regulations and best practices

    • Develop strong communication and problem-solving skills

  • Answered by AI
  • Q2. How to work in oil and gas refinery erection plan
  • Ans. 

    To work in oil and gas refinery erection plan, one must have knowledge of piping design, construction codes, safety regulations, and project management.

    • Understand piping design principles and specifications

    • Ensure compliance with construction codes and standards

    • Adhere to safety regulations and protocols

    • Coordinate with various teams for project management

    • Review and interpret engineering drawings and documents

  • Answered by AI
  • Q3. Erection and fanfiction plan
  • Q4. Achievement my working Tim
  • Q5. How many types of carane
  • Ans. 

    There are two main types of cranes: mobile cranes and tower cranes.

    • Mobile cranes are versatile and can be easily moved from one location to another. They are commonly used for construction projects.

    • Tower cranes are fixed to the ground and are often used for tall buildings or structures that require heavy lifting at great heights.

  • Answered by AI
  • Q6. Material code ASME section code,pwht
Round 3 - HR 

(1 Question)

  • Q1. Working related

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Piping Engineer interview:
  • Erection
  • Fabrication
Interview preparation tips for other job seekers - Very bad due to after interview selection not given offer letter parcial only join this company or any reference person join this company other persons not tec job this company

I applied via Naukri.com and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Welding process and defects. 2. Asme codes.
  • Q2. 3. Production Norms. 4. Previous company's jobs and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn Asme codes for material and welding procedure

Piping Engineer Interview Questions Asked at Other Companies for Experienced

asked in Worley
Q1. what precaution should be taken before starting any confined spac ... read more
Q2. What is Compressible and incompressible fluids and example..
Q3. Different types of pump. Which standard is used for line sizing.
asked in Worley
Q4. Describe the procedure for erecting an Heat Exchanger?
Q5. How you identify, if cs material used behalf of ltcs

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of Making Minor Bridge?
  • Ans. 

    The process of making a minor bridge involves planning, design, construction, and inspection.

    • 1. Planning phase involves determining the location, size, and type of bridge needed.

    • 2. Design phase includes creating detailed drawings and calculations for the bridge structure.

    • 3. Construction phase involves building the foundation, supports, and deck of the bridge.

    • 4. Inspection phase ensures the bridge meets safety and quali...

  • Answered by AI
  • Q2. How do you assure piling Point ?
  • Ans. 

    Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.

    • Conduct soil investigation to determine soil conditions and suitability for piling.

    • Select appropriate piling equipment based on soil conditions and project requirements.

    • Monitor the piling process to ensure proper installation and alignment of piles.

    • Perform load tests on completed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you change your last Company?
  • Q2. What your salary Expectations ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident towards your Knowledge
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Execution of Elevated Viaduct (ROB) 6.2KM 1200 numbers pile (Friction & end Bearing Pile) Foundation ROB Pile Cap and Pier, PSC T-Type Pier Cap, Post Tensioning Girder,Bow string (ROB) structure box interc...
  • Ans. 

    The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.

    • Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.

    • Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...

  • Answered by AI
  • Q2. Preparation of the planning of site execution day by day as per available drawing. Planning & indenting daily requirement of Labour, Construction Machinery, and Materials &Formwork. Organizing various dail...

Interview Preparation Tips

Interview preparation tips for other job seekers - I certify also that all relative document pertaining my qualifications areon my file and is readily accessible in the case needed further.

I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Errection and maintenance related
  • Q2. Installation of b/plant, tower crain etc
  • Q3. Aggregate processing plant, screen house, primary crusher, secondary crusher, conveyor belt errection,fluit coupling repairing work

Interview Preparation Tips

Interview preparation tips for other job seekers - All over India telephonic or walk-in interview please call my no for interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. PQC rectification??
Round 2 - Technical 

(1 Question)

  • Q1. BC joint cutting??
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Piping Engineer interview for experienced candidates?
L&T Energy Hydrocarbon interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process for experienced candidates are Resume Shortlist, HR and Technical.
How to prepare for L&T Energy Hydrocarbon Piping Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L&T Energy Hydrocarbon. The most common topics and skills that interviewers at L&T Energy Hydrocarbon expect are Fabrication, Vendor, 3D, Piping Design and Piping Engineering.
What are the top questions asked in L&T Energy Hydrocarbon Piping Engineer interview for experienced candidates?

Some of the top questions asked at the L&T Energy Hydrocarbon Piping Engineer interview for experienced candidates -

  1. How to work in oil and gas refinery erection p...read more
  2. How to work in oil and gas refin...read more
  3. How many types of car...read more

Tell us how to improve this page.

L&T Energy Hydrocarbon Piping Engineer Interview Process for Experienced

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 119 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 52 Interviews
View all
L&T Energy Hydrocarbon Piping Engineer Salary
based on 138 salaries
₹2.6 L/yr - ₹11 L/yr
21% less than the average Piping Engineer Salary in India
View more details

L&T Energy Hydrocarbon Piping Engineer Reviews and Ratings

based on 33 reviews

3.0/5

Rating in categories

3.2

Skill development

2.7

Work-life balance

3.2

Salary

3.5

Job security

2.9

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 33 Reviews and Ratings
Assistant Manager
726 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
328 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
253 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Piping Engineer
138 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
118 salaries
unlock blur

₹17 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview