I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
posted on 23 May 2023
CAD drawing superimposed by aligning different layers of drawings on top of each other to create a composite image.
CAD drawing superimposed by aligning different layers of drawings on top of each other.
Each layer represents a different aspect of the survey data, such as property boundaries, topography, or utilities.
By superimposing the layers, surveyors can create a comprehensive and detailed map of the surveyed area.
T...
CAD drawing superimposed by overlaying one drawing on top of another to compare or analyze differences.
CAD drawing superimposed by aligning common points in both drawings.
Helps in identifying discrepancies or changes between different versions of a drawing.
Useful for construction projects to track progress and changes over time.
Can be done by adjusting transparency of one drawing to see both simultaneously.
Allows for b...
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I was interviewed in Nov 2024.
Survey
Auto Level, Total Stesan, DGPS
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
posted on 27 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I am from New York and I have 10 years of experience as a Senior Surveyor.
I am originally from New York.
I have 10 years of experience as a Senior Surveyor.
I have worked on various projects across the state.
I am familiar with the local regulations and requirements.
I have successfully completed complex surveys in urban and rural areas.
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
based on 20 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹17 L/yr |
Senior Engineer
685
salaries
| ₹3 L/yr - ₹11.7 L/yr |
Assistant Construction Manager
528
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
377
salaries
| ₹1.6 L/yr - ₹8.3 L/yr |
Assistant Engineering Manager
322
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA