Upload Button Icon Add office photos

BGR Energy Systems

Compare button icon Compare button icon Compare

Filter interviews by

BGR Energy Systems Land Surveyor Interview Questions and Answers

Updated 26 Sep 2021

BGR Energy Systems Land Surveyor Interview Experiences

1 interview found

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 13 Sep 2021

I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What kind of project are you doing

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was technically

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How does cad drawing superimposed.
  • Ans. 

    CAD drawing superimposed by aligning different layers of drawings on top of each other to create a composite image.

    • CAD drawing superimposed by aligning different layers of drawings on top of each other.

    • Each layer represents a different aspect of the survey data, such as property boundaries, topography, or utilities.

    • By superimposing the layers, surveyors can create a comprehensive and detailed map of the surveyed area.

    • T...

  • Answered by AI
  • Q2. How does cad drawing superimposed
  • Ans. 

    CAD drawing superimposed by overlaying one drawing on top of another to compare or analyze differences.

    • CAD drawing superimposed by aligning common points in both drawings.

    • Helps in identifying discrepancies or changes between different versions of a drawing.

    • Useful for construction projects to track progress and changes over time.

    • Can be done by adjusting transparency of one drawing to see both simultaneously.

    • Allows for b...

  • Answered by AI

Interview Questionnaire 

12 Questions

  • Q1. Tunnel express. Jetty..
  • Q2. Good survey engineer
  • Q3. Good engineer
  • Q4. Good team megment
  • Q5. Good confidence
  • Q6. Good beabehar
  • Q7. Ts opereter
  • Q8. Good company
  • Q9. Raining job
  • Q10. Good exprencess
  • Q11. By jb g dg j hu j
  • Q12. Gd
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your exact responsibility in your organization?
  • Q2. What are your additional qualities?
  • Q3. AutoCAD, Excel, Friendly with all types of docs , Even the Contract Documents also
  • Ans. Maintain good relationship with Clients on the basis of my performance.
  • Answered by Atul anand
Round 2 - Technical 

(6 Questions)

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Ans. 

    The work procedure in our organization for RA Bill preparation involves several steps.

    • Gathering all relevant project documents and information

    • Analyzing the project scope and specifications

    • Measuring and quantifying the work done on-site

    • Preparing detailed rate analysis for each item of work

    • Calculating the quantities and rates for each item

    • Preparing the bill of quantities (BOQ)

    • Cross-checking the BOQ with the project speci...

  • Answered by AI
  • Q2. Explain about the different types of bills you know about.
  • Ans. 

    Different types of bills in quantity surveying

    • Measurement bill: It includes the detailed measurements of various items of work.

    • Abstract bill: It provides a summary of all the measurements and quantities of work done.

    • Cost bill: It includes the cost of each item of work and the total cost of the project.

    • Final bill: It is the final settlement bill after completion of the project.

    • Interim bill: It is prepared at regular int...

  • Answered by AI
  • Q3. Tell me about the importance of contact documents in any type of bill prepation.
  • Ans. 

    Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.

    • Contact documents define the legal agreement between the parties involved in a construction project.

    • They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.

    • Contact documents provide clarity...

  • Answered by AI
  • Q4. How reconciliation performed?
  • Ans. 

    Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.

    • Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.

    • The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.

    • Reconciliation can be performed manually or using softw...

  • Answered by AI
  • Q5. What are the client instructions in your current project about document controlling?
  • Ans. As according to client, we have prepare and submit all the prepour and postpour docs with all test certificate if any even in mechanical or civil works before submission of Monthly RA bill.
  • Answered by Atul anand
  • Q6. Do you know AutoCAD & Excel well ?
  • Ans. 

    Yes, I am proficient in AutoCAD and Excel.

    • I have extensive experience using AutoCAD for creating and editing technical drawings.

    • I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.

    • I have successfully completed projects where I utilized both AutoCAD and Excel.

    • I am familiar with the various features and functions of both software.

    • I can efficiently generate quantity take-offs and cost es

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating yourself as according to Employer demands and market requirements and Always be honest to your interview that helps in your progress also.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Basic Knowledge
  • Q2. What You Studies and about your experience
Round 2 - Technical 

(2 Questions)

  • Q1. Not specific Questions
  • Q2. Depend upon your knowledge and experience you must share with them

Interview Preparation Tips

Interview preparation tips for other job seekers - You need strong Basics if you are fresher and If you are experiance person then it's cherry on top
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience, current salary, expected salary and notice period
Round 2 - Technical 

(1 Question)

  • Q1. About technical knowledge of current designation
Round 3 - One-on-one 

(1 Question)

  • Q1. About technical knowledge currently project

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go with extraordinary, reply to interviewer what you actually know
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary discussiom
  • Q2. Notice period how much
Round 2 - Technical 

(1 Question)

  • Q1. Basic technical questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical question related to my job profile
  • Q2. I answered well as per my knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Please mentioned your actual knowledge and experience in CV. Also mentioned correct CTC in CV.

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Telephonic interview by HR
  • Q2. Where are you from how much experience ?
  • Ans. 

    I am from New York and I have 10 years of experience as a Senior Surveyor.

    • I am originally from New York.

    • I have 10 years of experience as a Senior Surveyor.

    • I have worked on various projects across the state.

    • I am familiar with the local regulations and requirements.

    • I have successfully completed complex surveys in urban and rural areas.

  • Answered by AI
  • Q3. I'm from Jharkhand and experience was 7 years

Interview Preparation Tips

Topics to prepare for Simplex Infrastructures Senior Surveyor interview:
  • travesing
Interview preparation tips for other job seekers - Experience teach better join work and enjoy work for internship
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Simple game style interview

Round 2 - One-on-one 

(1 Question)

  • Q1. What made you apply for this junior qs role?

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 737 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Thermax Limited Interview Questions
4.2
 • 247 Interviews
Adani Power Interview Questions
3.9
 • 215 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Suzlon Group Interview Questions
4.1
 • 128 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
View all
BGR Energy Systems Land Surveyor Salary
based on 6 salaries
₹3.2 L/yr - ₹5.4 L/yr
At par with the average Land Surveyor Salary in India
View more details

BGR Energy Systems Land Surveyor Reviews and Ratings

based on 6 reviews

4.6/5

Rating in categories

4.4

Skill development

4.6

Work-life balance

4.4

Salary

4.4

Job security

4.3

Company culture

4.3

Promotions

4.3

Work satisfaction

Explore 6 Reviews and Ratings
Senior Engineer
209 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Deputy Manager
195 salaries
unlock blur

₹5.7 L/yr - ₹12.5 L/yr

Senior Manager
92 salaries
unlock blur

₹10 L/yr - ₹20 L/yr

Manager
54 salaries
unlock blur

₹7.8 L/yr - ₹14.6 L/yr

Deputy General Manager
53 salaries
unlock blur

₹13.8 L/yr - ₹28 L/yr

Explore more salaries
Compare BGR Energy Systems with

Thermax Limited

4.2
Compare

Kirloskar Brothers

3.8
Compare

Larsen & Toubro Limited

4.0
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview