Upload Button Icon Add office photos

Filter interviews by

L&T Construction Account Assistant Interview Questions and Answers

Updated 28 May 2024

L&T Construction Account Assistant Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(8 Questions)

  • Q1. I think you should me hire me because im very organized diligent in my
  • Q2. I want to work at your company because i love the service you provide to customers you hire
  • Q3. You should hire me because of my proven ability to maintain strong interpersonal relationship with severeal
  • Q4. This interview questions seems forward
  • Q5. Exceptional hire
  • Q6. Exceptional hire for the better ttech
  • Q7. D8ypiddliQGQLFCGwuo
  • Q8. Good about the hire
Round 2 - Aptitude Test 

Something goood about this advise

Interview Preparation Tips

Interview preparation tips for other job seekers - good for the ni hhf

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. What is your name and what do you do
  • Q2. What is your profile and what do you like
  • Q3. What is your qualification
  • Q4. What did you do? and what works best
Round 3 - Aptitude Test 

What do you like to work

Interview Preparation Tips

Topics to prepare for Simplex Infrastructures Account Assistant interview:
  • Accounting
  • Asst-Accounts
Interview preparation tips for other job seekers - Dear Sir, I have done what was from my side, now all of you see
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. They are taking three rounds about accounts related questions
  • Q2. Gst related Gst R1 Return filing & 3B Return how to reconciliation & Audit points questions and sum Excel Assignment

Interview Preparation Tips

Interview preparation tips for other job seekers - Larsen and Toubro working in this company very Happy
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the process for making traveers
  • Q2. How to make autocad Drawing
  • Q3. What is your total professional experience?
  • Q4. How to manage team
  • Q5. What are your technical qualifications?

Interview Preparation Tips

Interview preparation tips for other job seekers - Company Requirements is Good Education and good Knowledge form Dipertment otherwise no place this company
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What was your experience like during the one-on-one interview with HR?
  • Q2. What types of questions will the manager ask?
Round 2 - One-on-one 

(2 Questions)

  • Q1. Can you explain your previous work experience?
  • Q2. Salary negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - Married women with kid should not join this company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(4 Questions)

  • Q1. How to manage production
  • Q2. How to manage manpower
  • Q3. How to manage pri plan
  • Q4. What about team leader ship
Round 2 - Group Discussion 

Technical questions
1. How about tractor
2. How to work tandum pump
3. Air cleaner work

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Scaffolding department very good
  • Q2. Ccic company very good
  • Q3. Worker communication very good
  • Q4. Worker supervisor Taal mein very good
  • Q5. Scaffolding material very good

Interview Preparation Tips

Interview preparation tips for other job seekers - Scaffolding working experience 17 year
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Governor is control' by Turbine speed
  • Q2. By oppitimizi combustion fuel,to increase boiler Efficiency
Round 2 - Group Discussion 

As I am shift incharge ,i wanted technical knowledge

Round 3 - Case Study 

Very interesting knowledge Questions should ask for interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What is embackment & Earthwork process
  • Ans. 

    Embankment is a raised bank or wall built to carry a road or to hold back water.

    • Embankment is a raised structure made of earth or other materials to support a road or railway.

    • Earthwork process involves moving, processing, and placing soil or rock to create embankments, excavations, or other earth structures.

    • Embankments are commonly used in road construction to elevate the road above the surrounding terrain.

    • Earthwork pr...

  • Answered by AI
  • Q2. What is PQC laying
  • Ans. 

    PQC laying stands for Pavement Quality Concrete laying, which is the final layer of concrete pavement on roads.

    • PQC laying is the process of laying the final layer of concrete pavement on roads.

    • It is done after the base and sub-base layers have been prepared and compacted.

    • PQC laying ensures a smooth and durable surface for vehicles to travel on.

    • Proper curing of PQC is essential to prevent cracks and ensure longevity.

    • Exa...

  • Answered by AI
  • Q3. What is RCC drain
  • Ans. 

    RCC drain is a reinforced concrete drain used for efficient drainage of rainwater or wastewater.

    • RCC drain is made of reinforced concrete to provide strength and durability.

    • It is used to efficiently channel rainwater or wastewater away from roads, buildings, or other structures.

    • RCC drains come in various shapes and sizes depending on the specific drainage requirements.

    • These drains are commonly used in urban areas to pre...

  • Answered by AI
  • Q4. What is Kerb laying
  • Ans. 

    Kerb laying is the process of installing and positioning curbs along the edges of roads or pavements.

    • Kerb laying involves setting out the alignment and levels for the curbs.

    • The curbs are then placed and fixed in position using concrete or other suitable materials.

    • Kerb laying helps define the edges of roads, provide structural support, and prevent vehicles from driving off the road.

    • Properly laid curbs enhance the overal...

  • Answered by AI
  • Q5. What isKerb painting and road marking
  • Ans. 

    Kerb painting and road marking are techniques used to designate specific areas on roads for various purposes.

    • Kerb painting involves painting the edges of the road, usually in a specific color, to indicate parking restrictions, loading zones, or pedestrian crossings.

    • Road marking includes painting lines, symbols, and signs on the road surface to guide traffic, indicate lanes, show pedestrian crossings, and warn of hazard...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Work Experience
  • Q2. How to manage store and out side material staging
  • Ans. 

    To manage store and outside material staging, organize inventory, maintain clear labeling, implement FIFO system, and regularly inspect and update stock levels.

    • Organize inventory in a systematic manner to easily locate items

    • Maintain clear labeling on shelves, bins, and containers for quick identification

    • Implement FIFO (First In, First Out) system to ensure older stock is used first

    • Regularly inspect and update stock lev

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Material receive and issue
  • Q2. Quality related like TMT Bar and Bulk material
Round 3 - One-on-one 

(2 Questions)

  • Q1. Spares related issues
  • Q2. ERP SAP work Experience
  • Ans. 

    I have 3 years of experience working with ERP SAP in inventory management and data entry.

    • Managed inventory levels using SAP system

    • Entered data accurately and efficiently into SAP database

    • Generated reports on inventory status and trends

    • Collaborated with other departments to ensure accurate inventory records

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks

Skills evaluated in this interview

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Account Assistant interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Technical and Aptitude Test.
What are the top questions asked in L&T Construction Account Assistant interview?

Some of the top questions asked at the L&T Construction Account Assistant interview -

  1. i think you should me hire me because im very organized diligent in...read more
  2. exceptional hire for the better tt...read more
  3. this interview questions seems forw...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 L&T Construction interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 400 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 128 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
View all
L&T Construction Account Assistant Salary
based on 59 salaries
₹1.9 L/yr - ₹7.3 L/yr
41% more than the average Account Assistant Salary in India
View more details

L&T Construction Account Assistant Reviews and Ratings

based on 12 reviews

4.2/5

Rating in categories

4.1

Skill development

3.1

Work-Life balance

4.5

Salary & Benefits

4.7

Job Security

3.5

Company culture

3.8

Promotions/Appraisal

3.8

Work Satisfaction

Explore 12 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
662 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
528 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Civil Site Engineer
320 salaries
unlock blur

₹1.2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview