Upload Button Icon Add office photos

Filter interviews by

Power Mech Projects Utility Manager Interview Questions and Answers

Updated 11 Jan 2025

Power Mech Projects Utility Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Governor is control' by Turbine speed
  • Q2. By oppitimizi combustion fuel,to increase boiler Efficiency
Round 2 - Group Discussion 

As I am shift incharge ,i wanted technical knowledge

Round 3 - Case Study 

Very interesting knowledge Questions should ask for interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

@akhoon kamla clamp kuta clamp

Round 3 - Technical 

(7 Questions)

  • Q1. What is the name of rode who installed before shutdown of HT line work
  • Ans. 

    The name of the rode installer before the shutdown of HT line work is not provided.

    • The name of the rode installer was not mentioned in the question.

    • It is important to have proper documentation of all workers involved in such tasks.

    • Without specific information, it is not possible to determine the name of the rode installer.

  • Answered by AI
  • Q2. How much feet grouting of stp pole
  • Ans. 

    The amount of grouting required for an STP pole is typically measured in cubic feet.

    • Grouting of an STP pole is usually done to secure it in place and provide stability.

    • The amount of grouting needed depends on the size and depth of the hole where the pole is placed.

    • Calculations are based on the volume of the hole and the density of the grouting material.

    • For example, a standard 10-foot STP pole may require 1-2 cubic feet

  • Answered by AI
  • Q3. How much destance single srket pole to pole
  • Ans. 

    The distance between single street poles varies depending on the location and purpose of the poles.

    • The distance between single street poles can range from 50 feet to 200 feet in urban areas.

    • In rural areas, the distance between poles can be as much as 400 feet or more.

    • The distance between poles may also be determined by the type of utility lines running between them, such as power lines, telephone lines, or cable lines.

  • Answered by AI
  • Q4. How much meters long one span of HT line
  • Ans. 

    The length of one span of HT line varies depending on the specific installation and design.

    • The length of one span of HT line can range from 50 meters to 200 meters or more.

    • Factors such as terrain, voltage level, and design specifications can influence the length of a span.

    • For example, in hilly terrain, the span length may be shorter to account for elevation changes.

    • In urban areas with limited space, shorter spans may b...

  • Answered by AI
  • Q5. How much wire can install HT line single srket
  • Ans. 

    The amount of wire needed to install a HT line single srket depends on the length and specifications of the line.

    • The amount of wire required will depend on the length of the HT line

    • Consider the specifications of the HT line, such as the voltage rating and current capacity

    • Factors like terrain, weather conditions, and safety regulations may also impact the amount of wire needed

  • Answered by AI
  • Q6. What is the name of centre wire pin insulation
  • Ans. 

    The name of the centre wire pin insulation is called dielectric

    • Dielectric material is used to insulate the centre wire pin in cables

    • It helps to prevent electrical leakage and maintain signal integrity

    • Common examples of dielectric materials include polyethylene, polypropylene, and Teflon

  • Answered by AI
  • Q7. Who much feet muffing can do it

Interview Preparation Tips

Interview preparation tips for other job seekers - Before starting work you have to wear sefty belt jacket and shoes helmet ⛑️ for owsom work

Power Mech Projects Interview FAQs

How many rounds are there in Power Mech Projects Utility Manager interview?
Power Mech Projects interview process usually has 3 rounds. The most common rounds in the Power Mech Projects interview process are Technical, Group Discussion and Case Study.
What are the top questions asked in Power Mech Projects Utility Manager interview?

Some of the top questions asked at the Power Mech Projects Utility Manager interview -

  1. By oppitimizi combustion fuel,to increase boiler Efficie...read more
  2. Governor is control' by Turbine sp...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 421 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
ABB Interview Questions
4.1
 • 225 Interviews
View all
Senior Engineer
529 salaries
unlock blur

₹3 L/yr - ₹8.1 L/yr

Assistant Manager
277 salaries
unlock blur

₹4.1 L/yr - ₹10.5 L/yr

Engineer
251 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Electrical Engineer
218 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Mechanical Engineer
216 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Power Mech Projects with

Thermax Limited

4.2
Compare

BGR Energy Systems

3.7
Compare

Larsen & Toubro Limited

4.0
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview