Filter interviews by
Managing site in high pressure requires effective communication, prioritization, and problem-solving skills.
Establish clear communication channels with team members and stakeholders
Prioritize tasks based on urgency and importance
Anticipate potential problems and have contingency plans in place
Stay calm and focused under pressure
Delegate tasks to capable team members
Maintain a positive attitude and motivate team members
...
I applied via Campus Placement and was interviewed in May 2023. There were 3 interview rounds.
Aptitude was a little bit easy. Keep your foundation strong.
I was interviewed in Jun 2023.
The angle of ladder position is an important factor in ensuring safety and stability while working at heights.
The angle of the ladder should be approximately 75 degrees for optimal stability.
A ladder that is too steep (greater than 75 degrees) can cause the base to slide outwards, while a ladder that is too shallow (less than 75 degrees) may cause the top to slip off the support.
Using a ladder angle indicator or a simp...
Interview In scaffolding
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
L&T Construction interview questions for popular designations
I applied via Referral
The density of flyash blocks varies depending on the manufacturing process and composition.
Flyash blocks can have a density ranging from 600 kg/m3 to 1600 kg/m3.
The density is influenced by factors such as the amount of fly ash, cement, and water used in the mix.
Higher density blocks are typically stronger and more durable.
Density can be measured using a variety of methods, including water displacement and weighing.
It ...
Concrete cubes are cast by filling a cube-shaped mold with freshly mixed concrete and allowing it to cure.
Prepare the mold by cleaning and oiling it to prevent sticking.
Mix the concrete according to the desired strength and consistency.
Fill the mold with the concrete, making sure to compact it well and eliminate any air pockets.
Smooth the surface of the concrete and cover the mold with a plastic sheet to prevent moistu...
I prioritize safety by implementing strict protocols, conducting regular inspections, and providing proper training to workers.
Establish and enforce safety protocols and guidelines
Conduct regular safety inspections and audits
Provide proper training and education to workers on safety procedures
Encourage workers to report any safety concerns or hazards
Investigate and address any safety incidents or accidents promptly
Stay...
The productivity of a carpenter depends on various factors such as experience, skill level, tools used, and complexity of the project.
The productivity of a carpenter can be measured in terms of the amount of work completed in a given time frame.
Factors that affect productivity include the carpenter's experience and skill level, the tools and equipment used, and the complexity of the project.
For example, a highly skille...
Crank in slab is added to prevent cracking due to temperature and shrinkage.
Crank is added to slabs at intervals of 1.5 to 2 meters.
The amount of crank depends on the thickness of the slab and the expected temperature changes.
For a 150mm thick slab, 0.15% of steel is added as crank.
For a 200mm thick slab, 0.12% of steel is added as crank.
Crank bars are usually 6mm to 10mm in diameter.
Get interview-ready with Top L&T Construction Interview Questions
I applied via Campus Placement and was interviewed in Nov 2022. There were 3 interview rounds.
The online test was bit lengthy
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
Rotation equipment can develop sound and vibration due to various reasons such as imbalance, misalignment, wear and tear, or bearing issues.
Imbalance in rotating parts can cause vibration and noise. For example, a misaligned shaft or uneven distribution of mass.
Misalignment of components can lead to vibration and noise. For instance, if a motor shaft is not properly aligned with the pump shaft.
Wear and tear in bearings...
Breathers are devices used to prevent the build-up of pressure or vacuum within a sealed container or system.
Breathers allow for the exchange of air to prevent pressure differentials.
They are commonly used in hydraulic systems to prevent contamination.
Breathers can also be used in storage tanks to prevent the formation of a vacuum.
The purpose of breathers is to maintain optimal operating conditions within a system.
Inter cooler in an air line is used to cool down the compressed air before it enters the engine, increasing its density and efficiency.
Increases air density for better combustion efficiency
Reduces the risk of engine knocking or detonation
Improves overall engine performance and power output
Periodical maintenance refers to regular scheduled maintenance tasks performed on equipment or systems to ensure optimal performance and prevent breakdowns.
Periodical maintenance involves routine inspections, cleaning, lubrication, and adjustments.
It helps to identify and address potential issues before they become major problems.
Examples include changing the oil in a car every 5,000 miles, inspecting HVAC systems quar
A checklist is a list of items or tasks that need to be completed or verified.
Used to ensure all necessary tasks are completed
Can be used in various fields such as project management, quality control, and safety inspections
Examples: pre-flight checklist for pilots, grocery shopping list, daily to-do list
A,B,C&D Service refers to different levels of maintenance services provided for equipment or machinery.
A Service: Regular maintenance to prevent breakdowns
B Service: Intermediate level maintenance to address minor issues
C Service: Major maintenance to address significant issues
D Service: Overhaul or complete refurbishment of the equipment
Example: A car manufacturer may offer A, B, C, and D services for their vehicles
Tail light, high intensity light Radium Stickers are reflective stickers used on vehicles to enhance visibility and safety.
Tail light Radium Stickers are placed on the rear of vehicles to make them more visible in low light conditions.
High intensity light Radium Stickers are used on bicycles, helmets, and other objects to increase visibility to others.
These stickers contain radium material that reflects light, making t...
RR stands for Relative Risk, BD stands for Base Diameter, and LBD stands for Largest Base Diameter.
RR is a measure of the risk of an event happening in one group compared to another group.
BD refers to the diameter of the base of a structure or object.
LBD is specifically referring to the largest diameter of the base of a structure or object.
Example: RR can be used in epidemiology to compare the risk of developing a dise...
PTO in In Power and Documents stands for Power Take Off, a mechanism used to transfer power from a vehicle's engine to another application.
PTO is commonly used in trucks and other heavy-duty vehicles to power auxiliary equipment such as hydraulic pumps or generators.
In In Power and Documents, PTO may refer to the specific settings or configurations related to power take off systems in vehicles.
Understanding PTO in In P...
LCV stands for Light Commercial Vehicles and HDD stands for Heavy Duty Vehicles.
LCV vehicles are designed for transporting goods or passengers with a gross vehicle weight of up to 3.5 tons.
Examples of LCV vehicles include vans, pickup trucks, and small buses.
HDD vehicles are designed for heavy-duty tasks such as construction, mining, or transportation of heavy loads.
Examples of HDD vehicles include dump trucks, tractor
The 'W' in 15W/40 oil stands for winter, indicating the oil's viscosity in cold temperatures.
The 'W' stands for 'winter' in multi-grade oils, indicating the oil's viscosity in cold temperatures
The number before the 'W' (15 in this case) represents the oil's viscosity at low temperatures
The number after the 'W' (40 in this case) represents the oil's viscosity at high temperatures
The size of the bolt head will typically be larger than the bolt thread size.
The size of the bolt head is usually larger than the bolt thread size for proper grip and torque application.
Common sizes for bolt heads include 22mm, 24mm, 27mm, etc.
The size of the bolt head is determined based on the application and required torque specifications.
The inserting shaft size for a ball bearing number 6405 is typically 25 mm.
The inserting shaft size for ball bearing 6405 is usually 25 mm.
The shaft size can vary depending on the specific design and application.
It is important to ensure the correct shaft size is used to prevent damage to the bearing.
The outer diameter of HDPE pipe varies based on the intended use and specifications.
HDPE pipes are available in a range of sizes from 16mm to 2000mm.
The outer diameter of HDPE pipe is typically larger than the inner diameter.
The thickness of the pipe wall also varies based on the intended use and pressure requirements.
HDPE pipes are commonly used for water supply, gas distribution, and sewage systems.
To handle contractors and local people, we follow a structured process and execute SOPs.
We establish clear communication channels with contractors and local people.
We ensure that all parties understand the project goals and objectives.
We provide training and support to contractors and local people on the SOPs.
We monitor and evaluate the performance of contractors and local people regularly.
We address any issues or conc...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.
General Aptitude with core technical questions.
I am a Graduate Engineer Trainee with a strong family background and experience in college projects. I can explain the difference between annealing and normalising and provide an extempore on the mandatory 75% rule.
Family background: My father is a civil engineer and my mother is a teacher. They have always encouraged me to pursue my passion for engineering.
College project: I worked on a project to design and develop a...
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 849 interviews
Interview experience
based on 6k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
705
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
503
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
322
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA