Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Interview Questions, Process, and Tips

Updated 9 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 575 questions

L&T Construction Interview Experiences

Popular Designations

745 interviews found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 3 Nov 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Work related questions
  • Q2. Work related and planing work
  • Q3. How to manage site in high pressure
  • Ans. 

    Managing site in high pressure requires effective communication, prioritization, and problem-solving skills.

    • Establish clear communication channels with team members and stakeholders

    • Prioritize tasks based on urgency and importance

    • Anticipate potential problems and have contingency plans in place

    • Stay calm and focused under pressure

    • Delegate tasks to capable team members

    • Maintain a positive attitude and motivate team members

    • ...

  • Answered by AI
  • Q4. Technical questions of work related
  • Q5. Work related questions safety related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on your work from basic and prepare plan for work according to schedule which is given by management

MEP Engineer Interview Questions asked at other Companies

Q1. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
View answer (4)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aptitude was a little bit easy. Keep your foundation strong.

Round 3 - HR 

(2 Questions)

  • Q1. Why do you want to join our company?
  • Q2. Are you ready to relocate anywhere?

Interview Preparation Tips

Interview preparation tips for other job seekers - Know your resume well.

Top L&T Construction Electrical GET Interview Questions and Answers

Q1. Explain method of Torque Variation of Squirrel Cage Motor.
View answer (1)

Electrical GET Interview Questions asked at other Companies

Q1. Can you explain Ohm's Law and how it relates to electrical circuits? What is the difference between AC (Alternating Current) and DC (Direct Current)? Describe the difference between analog and digital signals. Give an example of each. How w... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I was interviewed in Jun 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Angle of ladder position
  • Ans. 

    The angle of ladder position is an important factor in ensuring safety and stability while working at heights.

    • The angle of the ladder should be approximately 75 degrees for optimal stability.

    • A ladder that is too steep (greater than 75 degrees) can cause the base to slide outwards, while a ladder that is too shallow (less than 75 degrees) may cause the top to slip off the support.

    • Using a ladder angle indicator or a simp...

  • Answered by AI
Round 3 - Aptitude Test 

Interview In scaffolding

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes

Scaffolding Foreman Interview Questions asked at other Companies

Q1. What is the scaffold? Scaffolding is a temporary work platform built by third party for second party
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about u
  • Q2. Tell me about work experience

Interview Preparation Tips

Topics to prepare for L&T Construction Senior Manager interview:
  • Strategic Planning
  • Team Management
  • Resources management
  • Team Motivation
Interview preparation tips for other job seekers - Keep on focus on new developments

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the denisty of flyash blocks
  • Ans. 

    The density of flyash blocks varies depending on the manufacturing process and composition.

    • Flyash blocks can have a density ranging from 600 kg/m3 to 1600 kg/m3.

    • The density is influenced by factors such as the amount of fly ash, cement, and water used in the mix.

    • Higher density blocks are typically stronger and more durable.

    • Density can be measured using a variety of methods, including water displacement and weighing.

    • It ...

  • Answered by AI
  • Q2. How do you cast concrete cubes
  • Ans. 

    Concrete cubes are cast by filling a cube-shaped mold with freshly mixed concrete and allowing it to cure.

    • Prepare the mold by cleaning and oiling it to prevent sticking.

    • Mix the concrete according to the desired strength and consistency.

    • Fill the mold with the concrete, making sure to compact it well and eliminate any air pockets.

    • Smooth the surface of the concrete and cover the mold with a plastic sheet to prevent moistu...

  • Answered by AI
  • Q3. How do deal with safety issues at site
  • Ans. 

    I prioritize safety by implementing strict protocols, conducting regular inspections, and providing proper training to workers.

    • Establish and enforce safety protocols and guidelines

    • Conduct regular safety inspections and audits

    • Provide proper training and education to workers on safety procedures

    • Encourage workers to report any safety concerns or hazards

    • Investigate and address any safety incidents or accidents promptly

    • Stay...

  • Answered by AI
  • Q4. What is the productivity of a Carpenter
  • Ans. 

    The productivity of a carpenter depends on various factors such as experience, skill level, tools used, and complexity of the project.

    • The productivity of a carpenter can be measured in terms of the amount of work completed in a given time frame.

    • Factors that affect productivity include the carpenter's experience and skill level, the tools and equipment used, and the complexity of the project.

    • For example, a highly skille...

  • Answered by AI
  • Q5. How much do you add for crank in slab
  • Ans. 

    Crank in slab is added to prevent cracking due to temperature and shrinkage.

    • Crank is added to slabs at intervals of 1.5 to 2 meters.

    • The amount of crank depends on the thickness of the slab and the expected temperature changes.

    • For a 150mm thick slab, 0.15% of steel is added as crank.

    • For a 200mm thick slab, 0.12% of steel is added as crank.

    • Crank bars are usually 6mm to 10mm in diameter.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please do not loose your confidence while negotiating the terms, you have to be in your comfort zone about salary.Once you accept the offer there is no complaining about less pay and more work, so negotiate the terms you are comfortable with.

Assistant Civil Engineering Manager Interview Questions asked at other Companies

Q1. How do deal with safety issues at site
View answer (1)

Get interview-ready with Top L&T Construction Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

The online test was bit lengthy

Round 3 - Technical 

(2 Questions)

  • Q1. Questions asked from thermodynamics, som,manufacturing.
  • Q2. Also from design related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain good CGPA , and focus on building core knowledge.

Top L&T Construction Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. What will be the cost of painting the wall behind me?
View answer (19)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Technical 

(13 Questions)

  • Q1. Why Rotation equipment will get sound and vibration.
  • Ans. 

    Rotation equipment can develop sound and vibration due to various reasons such as imbalance, misalignment, wear and tear, or bearing issues.

    • Imbalance in rotating parts can cause vibration and noise. For example, a misaligned shaft or uneven distribution of mass.

    • Misalignment of components can lead to vibration and noise. For instance, if a motor shaft is not properly aligned with the pump shaft.

    • Wear and tear in bearings...

  • Answered by AI
  • Q2. What is meant breathers and purpose.
  • Ans. 

    Breathers are devices used to prevent the build-up of pressure or vacuum within a sealed container or system.

    • Breathers allow for the exchange of air to prevent pressure differentials.

    • They are commonly used in hydraulic systems to prevent contamination.

    • Breathers can also be used in storage tanks to prevent the formation of a vacuum.

    • The purpose of breathers is to maintain optimal operating conditions within a system.

  • Answered by AI
  • Q3. What is purposes of Inter cooler in Air line.
  • Ans. 

    Inter cooler in an air line is used to cool down the compressed air before it enters the engine, increasing its density and efficiency.

    • Increases air density for better combustion efficiency

    • Reduces the risk of engine knocking or detonation

    • Improves overall engine performance and power output

  • Answered by AI
  • Q4. What is Periodical Maintenance
  • Ans. 

    Periodical maintenance refers to regular scheduled maintenance tasks performed on equipment or systems to ensure optimal performance and prevent breakdowns.

    • Periodical maintenance involves routine inspections, cleaning, lubrication, and adjustments.

    • It helps to identify and address potential issues before they become major problems.

    • Examples include changing the oil in a car every 5,000 miles, inspecting HVAC systems quar

  • Answered by AI
  • Q5. What is Check list
  • Ans. 

    A checklist is a list of items or tasks that need to be completed or verified.

    • Used to ensure all necessary tasks are completed

    • Can be used in various fields such as project management, quality control, and safety inspections

    • Examples: pre-flight checklist for pilots, grocery shopping list, daily to-do list

  • Answered by AI
  • Q6. What is A,B,C&D Service.
  • Ans. 

    A,B,C&D Service refers to different levels of maintenance services provided for equipment or machinery.

    • A Service: Regular maintenance to prevent breakdowns

    • B Service: Intermediate level maintenance to address minor issues

    • C Service: Major maintenance to address significant issues

    • D Service: Overhaul or complete refurbishment of the equipment

    • Example: A car manufacturer may offer A, B, C, and D services for their vehicles

  • Answered by AI
  • Q7. What is Tail light,high intensity light Radium Stickers.
  • Ans. 

    Tail light, high intensity light Radium Stickers are reflective stickers used on vehicles to enhance visibility and safety.

    • Tail light Radium Stickers are placed on the rear of vehicles to make them more visible in low light conditions.

    • High intensity light Radium Stickers are used on bicycles, helmets, and other objects to increase visibility to others.

    • These stickers contain radium material that reflects light, making t...

  • Answered by AI
  • Q8. What is the difference of RR,BD &LBD
  • Ans. 

    RR stands for Relative Risk, BD stands for Base Diameter, and LBD stands for Largest Base Diameter.

    • RR is a measure of the risk of an event happening in one group compared to another group.

    • BD refers to the diameter of the base of a structure or object.

    • LBD is specifically referring to the largest diameter of the base of a structure or object.

    • Example: RR can be used in epidemiology to compare the risk of developing a dise...

  • Answered by AI
  • Q9. What is PTO in In Power and Documents.
  • Ans. 

    PTO in In Power and Documents stands for Power Take Off, a mechanism used to transfer power from a vehicle's engine to another application.

    • PTO is commonly used in trucks and other heavy-duty vehicles to power auxiliary equipment such as hydraulic pumps or generators.

    • In In Power and Documents, PTO may refer to the specific settings or configurations related to power take off systems in vehicles.

    • Understanding PTO in In P...

  • Answered by AI
  • Q10. What is LCV and HDD Vehicles
  • Ans. 

    LCV stands for Light Commercial Vehicles and HDD stands for Heavy Duty Vehicles.

    • LCV vehicles are designed for transporting goods or passengers with a gross vehicle weight of up to 3.5 tons.

    • Examples of LCV vehicles include vans, pickup trucks, and small buses.

    • HDD vehicles are designed for heavy-duty tasks such as construction, mining, or transportation of heavy loads.

    • Examples of HDD vehicles include dump trucks, tractor

  • Answered by AI
  • Q11. What is showing "W" in 15W/40 Oil
  • Ans. 

    The 'W' in 15W/40 oil stands for winter, indicating the oil's viscosity in cold temperatures.

    • The 'W' stands for 'winter' in multi-grade oils, indicating the oil's viscosity in cold temperatures

    • The number before the 'W' (15 in this case) represents the oil's viscosity at low temperatures

    • The number after the 'W' (40 in this case) represents the oil's viscosity at high temperatures

  • Answered by AI
  • Q12. If Bolt Thired is 20 mm . What will be Size of bolt head size in mm
  • Ans. 

    The size of the bolt head will typically be larger than the bolt thread size.

    • The size of the bolt head is usually larger than the bolt thread size for proper grip and torque application.

    • Common sizes for bolt heads include 22mm, 24mm, 27mm, etc.

    • The size of the bolt head is determined based on the application and required torque specifications.

  • Answered by AI
  • Q13. In Ball bearing Number is 6405. What is inserting Shaft size in mm.
  • Ans. 

    The inserting shaft size for a ball bearing number 6405 is typically 25 mm.

    • The inserting shaft size for ball bearing 6405 is usually 25 mm.

    • The shaft size can vary depending on the specific design and application.

    • It is important to ensure the correct shaft size is used to prevent damage to the bearing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My advice to seekers. Get good placement and work same company atleast three to four years.

Skills evaluated in this interview

Top L&T Construction Senior Engineer Interview Questions and Answers

Q1. How many time u take any update shuttering system?
View answer (11)

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Outer dia of HDPE pipe and specifications
  • Ans. 

    The outer diameter of HDPE pipe varies based on the intended use and specifications.

    • HDPE pipes are available in a range of sizes from 16mm to 2000mm.

    • The outer diameter of HDPE pipe is typically larger than the inner diameter.

    • The thickness of the pipe wall also varies based on the intended use and pressure requirements.

    • HDPE pipes are commonly used for water supply, gas distribution, and sewage systems.

  • Answered by AI
  • Q2. Work process how to handle contractor and local people how to exicute SOP
  • Ans. 

    To handle contractors and local people, we follow a structured process and execute SOPs.

    • We establish clear communication channels with contractors and local people.

    • We ensure that all parties understand the project goals and objectives.

    • We provide training and support to contractors and local people on the SOPs.

    • We monitor and evaluate the performance of contractors and local people regularly.

    • We address any issues or conc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - As hybrid projects in solar&wind 

(2 Questions)

  • Q1. All Question Related to resume and experience in your privous jobs And Project.
  • Q2. All Testing, site related work question, MMS, DC & AC. Quality related documents work. FQP.

Interview Preparation Tips

Topics to prepare for L&T Construction QA QC Engineer interview:
  • All related to role & responsibi
  • All test knowledge. If you work
Interview preparation tips for other job seekers - Only mentioned resume those point you have working on daily practice.
Role and responsibilities.
Focus your target.

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

General Aptitude with core technical questions.

Round 3 - Technical 

(2 Questions)

  • Q1. Afterwards there were technical interview along with HR.
  • Q2. Introduce Yourself. Tell something about your family background. Tell something about your college project. Difference between annealing and normalising. Write a extempore on "Should 75% be mandatory?
  • Ans. 

    I am a Graduate Engineer Trainee with a strong family background and experience in college projects. I can explain the difference between annealing and normalising and provide an extempore on the mandatory 75% rule.

    • Family background: My father is a civil engineer and my mother is a teacher. They have always encouraged me to pursue my passion for engineering.

    • College project: I worked on a project to design and develop a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do the project sincerely.
Know each line of your CV.
And you are supposed to know your academic study deeply.

Top L&T Construction Graduate Engineer Trainee (Get) Interview Questions and Answers

Q1. What will be the cost of painting the wall behind me?
View answer (19)

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 849 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview