Assistant Civil Engineering Manager

Assistant Civil Engineering Manager Interview Questions and Answers

Updated 30 Sep 2022

Q1. How do deal with safety issues at site

Ans.

I prioritize safety by implementing strict protocols, conducting regular inspections, and providing proper training to workers.

  • Establish and enforce safety protocols and guidelines

  • Conduct regular safety inspections and audits

  • Provide proper training and education to workers on safety procedures

  • Encourage workers to report any safety concerns or hazards

  • Investigate and address any safety incidents or accidents promptly

  • Stay up-to-date with industry safety standards and regulations

Q2. what is the productivity of a Carpenter

Ans.

The productivity of a carpenter depends on various factors such as experience, skill level, tools used, and complexity of the project.

  • The productivity of a carpenter can be measured in terms of the amount of work completed in a given time frame.

  • Factors that affect productivity include the carpenter's experience and skill level, the tools and equipment used, and the complexity of the project.

  • For example, a highly skilled carpenter with advanced tools may be able to complete a ...read more

Q3. How much do you add for crank in slab

Ans.

Crank in slab is added to prevent cracking due to temperature and shrinkage.

  • Crank is added to slabs at intervals of 1.5 to 2 meters.

  • The amount of crank depends on the thickness of the slab and the expected temperature changes.

  • For a 150mm thick slab, 0.15% of steel is added as crank.

  • For a 200mm thick slab, 0.12% of steel is added as crank.

  • Crank bars are usually 6mm to 10mm in diameter.

Q4. What is the denisty of flyash blocks

Ans.

The density of flyash blocks varies depending on the manufacturing process and composition.

  • Flyash blocks can have a density ranging from 600 kg/m3 to 1600 kg/m3.

  • The density is influenced by factors such as the amount of fly ash, cement, and water used in the mix.

  • Higher density blocks are typically stronger and more durable.

  • Density can be measured using a variety of methods, including water displacement and weighing.

  • It is important to consider the density of flyash blocks when...read more

Are these interview questions helpful?

Q5. How do you cast concrete cubes

Ans.

Concrete cubes are cast by filling a cube-shaped mold with freshly mixed concrete and allowing it to cure.

  • Prepare the mold by cleaning and oiling it to prevent sticking.

  • Mix the concrete according to the desired strength and consistency.

  • Fill the mold with the concrete, making sure to compact it well and eliminate any air pockets.

  • Smooth the surface of the concrete and cover the mold with a plastic sheet to prevent moisture loss.

  • Allow the concrete to cure for at least 24 hours b...read more

Assistant Civil Engineering Manager Jobs

Asst Manager Civil Engineering Pharma Co Mumbai 8-10 years
HRD House
0.0
₹ 8 L/yr - ₹ 11 L/yr
Mumbai
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 401 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Assistant Civil Engineering Manager Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter