Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Interview Questions, Process, and Tips

Updated 9 Mar 2025

Top L&T Construction Interview Questions and Answers

View all 575 questions

L&T Construction Interview Experiences

Popular Designations

745 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Why do you want to leave your present employer, which is a TATA company?
  • Q2. Why should we recruit you? What value will you add if we select you?
  • Q3. Why you want to change?

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

(1 Question)

  • Q1. Domain questions
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about yourself. Costing related questions. Taxation related questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Greet kindly to the panel & have a smile on your face.
Be very confident while you give your answers.
Try not to make your nervousness apparent from your face.
Don't hesitate to pass on a question you don't have an idea about. Give a pleasant answer that I would surely work on this topic to know.

Cost and Management Accountant Interview Questions asked at other Companies

Q1. Meaning of BOM, use of BOM ,role of cost accountant in industry ,marginal costing
View answer (1)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Case Study 

Can you describe your experience with major civil engineering projects?How do you approach the planning and design phase of a civil engineering project?What software tools are you proficient in for structural analysis and design?How do you ensure compliance with building codes and regulations in your projects?Can you provide an example of a challenge you faced on a project and how you overcame it?What role do sustainability and environmental considerations play in your design process?How do you manage and coordinate with multidisciplinary teams on construction projects?Can you explain your approach to cost estimation and budget management in civil engineering projects?What safety measures do you prioritize on construction sites, and how do you enforce them?How do you stay updated on the latest developments and trends in the field of civil engineering?

Round 2 - Technical 

(1 Question)

  • Q1. Sure, here's a technical civil engineering question:Explain the process and considerations involved in determining the bearing capacity of soil for a foundation design.

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Civil Site Engineer Interview Questions & Answers

user image Dropadi namdev

posted on 11 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Type of foundation
  • Ans. 

    Different types of foundations include shallow foundations, deep foundations, and special foundations.

    • Shallow foundations are typically used for light structures and consist of spread footings, mat foundations, and slab-on-grade foundations.

    • Deep foundations are used when the soil near the surface is not suitable for supporting the structure's load. Examples include pile foundations and drilled shafts.

    • Special foundation...

  • Answered by AI
Round 2 - Technical 

(7 Questions)

  • Q1. What is the construction materials
  • Ans. 

    Construction materials are substances used for building and construction purposes.

    • Common construction materials include concrete, steel, wood, brick, and asphalt.

    • Each material has specific properties and uses in construction projects.

    • Materials must meet certain standards and regulations for safety and durability.

    • Selection of materials depends on factors like cost, availability, and project requirements.

  • Answered by AI
  • Q2. Disscus the foundation
  • Q3. What is the railway guage
  • Ans. 

    The railway gauge is the distance between the inner sides of the two parallel rails on a railway track.

    • Standard gauge is 1435 mm (4 ft 8 1/2 in) used in most of the world

    • Narrow gauge is less than standard gauge, used in mountainous regions or for heritage railways

    • Broad gauge is wider than standard gauge, used in some countries like India and Russia

  • Answered by AI
  • Q4. Types of sleepers
  • Ans. 

    Sleepers are structural elements used to support railway tracks. Types include wooden, concrete, steel, and composite sleepers.

    • Wooden sleepers are traditional and cost-effective but require frequent maintenance.

    • Concrete sleepers are durable and have a longer lifespan compared to wooden sleepers.

    • Steel sleepers are used in special applications where high strength and durability are required.

    • Composite sleepers are a newer...

  • Answered by AI
  • Q5. Explain Railway point and crossing
  • Ans. 

    Railway point and crossing are components of railway tracks that allow trains to switch between different tracks.

    • Railway points are movable rails that allow trains to switch from one track to another.

    • Crossings are where two tracks intersect, allowing trains to cross over from one track to another.

    • Points and crossings are essential for ensuring smooth and safe operation of trains on railway networks.

  • Answered by AI
  • Q6. Explain in railway budget
  • Ans. 

    Railway budget is the financial plan specifically for the development and maintenance of railway infrastructure.

    • Railway budget allocates funds for various projects such as new railway lines, station upgrades, and safety improvements.

    • It also includes provisions for modernization of railway systems, procurement of new rolling stock, and implementation of technology upgrades.

    • The budget is crucial for ensuring the efficien...

  • Answered by AI
  • Q7. Explain in railway ballast
  • Ans. 

    Railway ballast is a layer of crushed rock or gravel placed beneath the tracks to provide stability and drainage.

    • Railway ballast is typically made of crushed stone or gravel.

    • It is placed beneath the railway tracks to provide stability and support.

    • Ballast helps to distribute the weight of the trains and prevent the tracks from shifting.

    • It also helps with drainage to prevent water from pooling on the tracks.

    • Regular maint...

  • Answered by AI

Top L&T Construction Civil Site Engineer Interview Questions and Answers

Q1. Minimum used in which grade of concrete
View answer (11)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

L&T Construction interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (49)

 Civil Site Engineer

 (33)

 Senior Engineer

 (28)

 Civil Engineer

 (25)

 Site Engineer

 (18)

 Assistant Manager

 (14)

 Electrical GET

 (11)

 Engineer Trainee

 (11)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the minimum grade of nominal mix
  • Ans. 

    The minimum grade of nominal mix is M5.

    • The minimum grade of nominal mix is M5, which means the mix has a compressive strength of 5 MPa.

    • Nominal mix is usually used for small scale construction works where quality control is not a major concern.

    • Higher grades like M10, M15, etc., are used for more critical structures.

    • Example: M5 concrete mix contains 1 part cement, 5 parts sand, and 10 parts aggregate.

  • Answered by AI
  • Q2. What is the minimum grade of design mix
  • Ans. 

    The minimum grade of design mix for concrete is M10.

    • The minimum grade of design mix for concrete is M10, which means the concrete mix has a compressive strength of 10 N/mm^2.

    • Higher grades like M15, M20, M25, etc. indicate higher compressive strengths.

    • The grade of design mix is specified by the structural engineer based on the requirements of the project.

    • Different grades of concrete are used for different types of const...

  • Answered by AI

Top L&T Construction Junior Engineer Civil Interview Questions and Answers

Q1. What is the means of PWD department
View answer (2)

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Get interview-ready with Top L&T Construction Interview Questions

Site Engineer Interview Questions & Answers

user image Ajay Kaushik

posted on 3 Jan 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - Material testing in construction 

(1 Question)

  • Q1. Slump test , cement test , workability test

Top L&T Construction Site Engineer Interview Questions and Answers

Q1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
View answer (4)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. MS pipe loading
  • Q2. Hydro testing work
  • Ans. 

    Hydro testing work involves testing pipelines, vessels, or other equipment using water or other liquids to ensure they can withstand pressure.

    • Hydro testing is a process used to check the integrity of pipelines, vessels, or other equipment by filling them with water or another liquid and pressurizing them to a specified level.

    • The test is conducted to ensure that the equipment can safely operate under normal operating co...

  • Answered by AI

Top L&T Construction Site Engineer Interview Questions and Answers

Q1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
View answer (4)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Group Discussion 

Rounds on technical aptitude and on process managemnet.

Round 2 - Case Study 

Case study situatiknal questions etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise the technical skills and have a great work discussion be transparent and fare

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)

Safety Supervisor Interview Questions & Answers

user image pawan mishra

posted on 31 Jan 2025

Interview experience
2
Poor
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. HSE skill and documents
  • Q2. Audit

Top L&T Construction Safety Supervisor Interview Questions and Answers

Q1. Which device is used to prevent fire in gas cutting set ?
View answer (1)

Safety Supervisor Interview Questions asked at other Companies

Q1. 1> What is Difference between Accident v/s Incident ? 2> What is Hazard ? 3> What is fire and types of Fire ? 4> Tell me about Confined Space ? 5> what is near Miss ? 6> What Is Excavation Safety ? 7> What is work permi... read more
View answer (3)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Daily work rue teen
  • Q2. Constration side
  • Q3. Tab dismantling work.
  • Q4. Tool box meeting process
  • Ans. 

    Tool box meetings are regular safety meetings held on job sites to discuss potential hazards, safety procedures, and promote a safety culture.

    • Tool box meetings are typically held at the beginning of each work shift or day.

    • Topics discussed include recent incidents, near misses, safety reminders, and any new safety procedures.

    • Employees are encouraged to actively participate by sharing their own experiences and suggestion...

  • Answered by AI
  • Q5. Permit to work training

Interview Preparation Tips

Topics to prepare for L&T Construction Safety Supervisor interview:
  • Industrial management safety
Interview preparation tips for other job seekers - Side handling and all workers training all safety rules

Top L&T Construction Safety Supervisor Interview Questions and Answers

Q1. Which device is used to prevent fire in gas cutting set ?
View answer (1)

Safety Supervisor Interview Questions asked at other Companies

Q1. 1> What is Difference between Accident v/s Incident ? 2> What is Hazard ? 3> What is fire and types of Fire ? 4> Tell me about Confined Space ? 5> what is near Miss ? 6> What Is Excavation Safety ? 7> What is work permi... read more
View answer (3)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction interview?

Some of the top questions asked at the L&T Construction interview -

  1. What will be the cost of painting the wall behind ...read more
  2. What do you mean by M25 concre...read more
  3. What are the steps to be followed after receiving the plan of a constructi...read more
How long is the L&T Construction interview process?

The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L&T Construction Interview Process

based on 848 interviews

Interview experience

4.2
  
Good
View more

L&T Construction Reviews and Ratings

based on 6k reviews

4.0/5

Rating in categories

4.0

Skill development

3.4

Work-life balance

3.8

Salary

4.0

Job security

3.7

Company culture

3.4

Promotions

3.6

Work satisfaction

Explore 6k Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview