Filter interviews by
I was interviewed in Nov 2023.
Discussion about planing, sheduling, exicution, cordination
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
The total tonnage of the project is 500 tons.
Total tonnage is 500 tons.
Tonnage includes all materials used in the project.
Tonnage can be calculated by summing the weight of all materials involved.
Example: 200 tons of steel, 100 tons of concrete, 200 tons of glass.
The time period of a project refers to the duration from the start to the completion of the project.
The time period of a project can vary depending on the scope and complexity of the project.
It is important to establish a realistic timeline for the project to ensure successful completion.
Factors such as resources, budget, and team availability can impact the time period of a project.
For example, a small marketing campa...
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
Simple basic aptitude, logical reasoning, verbal reasoning. Just remember to cAlm and revise basic directional questions, work questions, permutations and combinations, ages, circular/ linear arrangement questions.
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
Estimate costing is the process of calculating the approximate cost of a construction project before it begins.
Estimate costing involves analyzing the materials, labor, equipment, and other expenses required for a project.
It helps in determining the budget and feasibility of a project.
Estimate costing can be done using software like CostX, Bluebeam, or manually by experienced engineers.
It is important to regularly upda...
Land surveying is the process of accurately determining and measuring the position of points on the Earth's surface.
Involves measuring distances, angles, and elevations
Used in construction, mapping, and boundary determination
Utilizes tools such as total stations, GPS, and levels
Creates maps, plans, and legal documents for land use
PWD department stands for Public Works Department, responsible for construction and maintenance of public infrastructure.
PWD department is a government organization responsible for the construction and maintenance of public infrastructure such as roads, bridges, buildings, and water supply systems.
It plays a crucial role in ensuring the safety and functionality of public infrastructure for the benefit of the community.
...
One quivick is equivalent to 500 bricks.
One quivick is equal to 500 bricks.
A quivick is a unit of measurement used in construction to estimate the number of bricks needed for a project.
For example, if a project requires 2000 bricks, it would be equivalent to 4 quivicks.
There are several types of cement used in construction, each with different properties and applications.
There are different types of cement such as Portland cement, rapid hardening cement, white cement, etc.
Each type of cement has specific properties and is used for different purposes in construction.
For example, Portland cement is commonly used for general construction purposes, while rapid hardening cement is used fo...
Good quality cement should have high strength, low heat of hydration, and minimal impurities.
High compressive strength
Low heat of hydration to prevent cracking
Minimal impurities like excess lime or magnesium oxide
Consistent fineness and setting time
Should meet relevant standards like ASTM C150 or IS 269
L&T Construction interview questions for popular designations
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
Concrete compensation percentage varies based on factors like experience, location, and company size.
Concrete compensation percentage can range from 5% to 20% of the total project cost.
Factors influencing concrete compensation percentage include experience level of the engineer, location of the project, and size of the company.
For example, a junior civil site engineer may receive a lower percentage compared to a senior...
Concrete setting is the process in which concrete hardens and gains strength over time.
Concrete setting is the transformation of concrete from a plastic state to a hardened state.
It involves a chemical reaction called hydration, where water reacts with the cement in the concrete mixture.
The setting time of concrete can vary depending on factors like temperature, humidity, and mix design.
Proper curing is essential to en...
Column cover size refers to the dimensions of the material used to cover or encase a structural column.
Column cover size is typically specified in terms of width, depth, and height.
It is important to consider the aesthetic and functional requirements when determining the column cover size.
Examples of column cover materials include metal, wood, stone, or composite materials.
Column cover size can vary depending on the de...
The size of a parapet wall can vary depending on the specific design requirements and building codes.
The typical height of a parapet wall is around 3 feet, but it can be higher for safety reasons or aesthetic purposes.
The thickness of a parapet wall is usually around 8 inches to provide structural support.
The length of a parapet wall will depend on the length of the building facade it is protecting.
Parapet walls can be...
Concrete ratio is the proportion of cement, sand, and aggregate in a concrete mix.
Concrete ratio is typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The ratio may vary depending on the strength and durability requirements of the concrete mix.
Common concrete ratios include 1:1.5:3, 1:2:4, and 1:3:6.
The grade of concrete (e.g. M20, M25) also determines the concrete ratio.
Beam cover is the distance between the outer face of the concrete beam and the outer face of the column or slab.
Beam cover is important for protecting the reinforcement bars from corrosion and fire damage.
It also helps in providing adequate strength and durability to the structure.
The beam cover requirement may vary based on the type of structure and environmental conditions.
For example, in coastal areas where there is...
Get interview-ready with Top L&T Construction Interview Questions
Mux is a device that selects one of several input signals and forwards it to a single output, while a bus is a communication system that transfers data between components.
Mux is used to select one of multiple input signals and route it to a single output.
Bus is a communication system that allows multiple devices to transfer data between each other.
Mux is commonly used in digital electronics for signal routing, while bu...
Handling employees involves effective communication, setting clear expectations, providing support and feedback, and fostering a positive work environment.
Communicate openly and regularly with employees to ensure they understand their roles and responsibilities.
Set clear expectations and goals for employees to work towards.
Provide support and resources to help employees succeed in their roles.
Offer constructive feedbac...
The executive plan to progress the works involves setting clear goals, allocating resources efficiently, monitoring progress regularly, and making adjustments as needed.
Setting clear goals and objectives for the project
Allocating resources such as manpower, materials, and equipment efficiently
Monitoring progress regularly to ensure deadlines are met
Making adjustments to the plan as needed based on feedback and challeng...
Confined space work at height involves additional safety measures and precautions to prevent falls and other hazards.
Ensure proper training for working at heights in confined spaces
Use appropriate fall protection equipment such as harnesses and lanyards
Implement a permit system for confined space entry at height
Regularly inspect and maintain equipment used for working at heights in confined spaces
Have a rescue plan in
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 848 interviews
Interview experience
based on 6k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
705
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
503
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
391
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
322
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA